Design/Build Services: Solar Initiative Rooftop Solar Installations

Closed State & local contract opportunity Posted

Solicitation number
P47-105
State
Maryland
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Montgomery Parks is soliciting proposals for design/build services on three rooftop solar photovoltaic installations, with proposals due August 18, 2026. Offerors may bid on one or multiple projects; each will be awarded individually to the highest-ranked, most responsible and responsive offeror.

The scope comprises three turn-key installations: 300 kW-DC at Wheaton Ice Rink (11717 Orebaugh Avenue, Wheaton, Maryland); 1.10 MW-DC at Green Farm Maintenance Facility (8301 Turkey Thicket Drive, Montgomery Village, Maryland); and 700 kW-DC at Cabin John Ice Rink (10610 Westlake Drive, Rockville, Maryland). The solicitation provides Basis of Design 10% drawings for reference and pricing; the selected contractor must confirm and finalize these drawings as required during execution.

No specific contract value, contract term, set-asides, preference programs, evaluation criteria weighting, incumbent contractor, question deadline, or pre-bid meeting date is identified in the source material.

Opportunity text

Montgomery Parks is soliciting proposals from qualified solar providers to build turn-key installations for three rooftop solar PV projects. At Wheaton Ice Rink (11717 Orebaugh Avenue, Wheaton, MD), a 300 kW-DC solar installation is anticipated. At the Green Farm Maintenance Facility (8301 Turkey Thicket Dr, Montgomery Village, Maryland) a 1.10 mW-DC solar installation is anticipated. At Cabin John Ice Rink, (10610 Westlake Dr. Rockville, MD) a 700 kW-DC solar installation is anticipated. The projects will be awarded individually to the highest ranked, most responsible and responsive Offeror. Offerors may bid on one or multiple projects in this solicitation. Basis of Design 10% drawings have been included for reference and pricing. The selected contractor should expect to confirm and finalize these drawings as required.

Files

File Type Posted
833153solarMdNatl.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity