Design Services for Partial Roof Replacement at Heritage Middle School

Closed State & local contract opportunity Posted

Solicitation number
RFQ-26-K-LC
State
North Carolina
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Wake County Schools is requesting design services for a partial roof replacement and building enclosure investigation at Heritage Middle School, with proposals due September 30, 2026.

The scope divides into two phases. Phase 1 requires the design professional to evaluate the existing building enclosure, identify leak locations and causes (including air and moisture intrusion), and deliver a written report with images, issue descriptions, and design recommendations. Phase 2 encompasses design of building enclosure modifications and partial roof replacement of the existing coated 2-ply modified bitumen roofing across nine roof areas totaling approximately 92,963 square feet. The replacement design includes new 2-ply modified bitumen roofing, thermal roof insulation with coverboard, new sheet metal coping and accessories, and repairs addressing Phase 1 findings plus any additional concerns identified during the initial site visit.

The design firm will provide turnkey services including permit applications as required, bidding support, and full construction administration comprising pre-bid meetings, preconstruction meetings, regular site meetings during construction, scheduling, and project closeout. The solicitation document does not specify estimated contract value, contract term, evaluation criteria, pre-bid or site-visit dates, question deadline, or incumbent information.

Opportunity text

This is a building science investigation into the existing signs of leaks above the ceiling. Use the findings from the enclosure investigation and incorporate enclosure design modifications along with the partial roof replacement of the coated modified bitumen roof. The design work will include 2 phases. a. Phase 1, The selected design professional will evaluate the performance of the existing building enclosure and provide design recommendations. Determine the location and cause of leaks, air and moisture. Provide a written report to the owner. The report shall include a list of all issues with images, a description of the issue and design recommendations to fix the issue. b. Phase 2, Design for building enclosure modifications and design for partial roof replacement of the existing coated 2-ply modified bitumen roofing system on roof area A1, A2, A6, A17-A18, A20-A22, A25, A32, A36-A37, and A41 with a new 2-ply modified bitumen roofing system, approximately 92,963 total sq ft. Design the replacement and attachment of new thermal roof insulation with a coverboard. Design the replacement of new sheet metal coping and sheet metal accessories. Design the repairs to all roof related issues based on findings and recommendations in Phase 1. Design work will also include additional items of concern during initial site visit. Firm will provide turnkey design services including but not limited to roof replacement, permit applications as required, bidding, construction administration including scheduling, pre bid, preconstruction meetings, regular site construction meetings during the project, and project closeout.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity