- Beal City Public Schools is requesting sealed bids for Bid Pack No. 4 – Series 2 Summer 2027 Renovations at Beal City High School in Mount Pleasant, Michigan, with bids due July 1, 2026 at 11:00 a.m. and a pre-bid meeting and project walk-through scheduled for June 19, 2026 at 11:00 a.m. The scope spans multiple bid divisions under separate prime contracts: concrete, masonry, metals, general trades, roofing, glass and glazing, drywall/insulation/acoustical work, flooring, painting, stage...
- Mecosta-Osceola Intermediate School District (MOISD) in Big Rapids, Michigan is requesting proposals for roofing and insulation installation at the MOISD Campus Career Center building, with proposals due July 2, 2026 at 2:00 p.m. and a mandatory pre-bid walk-through on June 19, 2026 at 1:00 p.m. at the project site (15830 190th Avenue, Big Rapids). The scope consists of two parts: Part One covers roofing the main Career Center building over an existing metal roof with expanded polystyrene...
- Kent Intermediate School District is requesting sealed bids for the Career Tech South Campus Demo Package, a building and site demolition project in Caledonia, Michigan, with bids due June 17, 2026 at 2:00 p.m. at 6645 East Paris Avenue, Caledonia. The procurement encompasses two bid categories: Bid Category No. 1 (Demolition) covering complete removal of the existing Dutton Elementary School building, including footings, foundations, ductwork, piping, wiring, and associated MEP systems; and Bid...
- Huron Intermediate School District is requesting bids for roofing replacement at its administrative building located at 1299 S. Thomas Rd., Bad Axe, Michigan, with bids due June 23, 2026 at 2:00 p.m. and a pre-bid conference on June 10, 2026 at 2:00 p.m. The scope encompasses complete roof replacement including removal of existing metal roof panels, inspection and replacement of underlayment as required, installation of a 60-mil Duro-Tuff membrane extending a minimum of 36 inches up the roof...
- Cheboygan Area Schools is requesting sealed bids for construction of an enclosed work yard at Cheboygan High School, with bids due June 29, 2026 at 11:00 a.m. local time and a pre-bid meeting scheduled for June 17, 2026 at 1:30 p.m. The scope includes installation of 6-foot-high black chain link fence (9 gauge, 2-inch mesh) with HF20 round black posts and dome caps, two cantilevered sliding gates (10 feet and 16 feet wide), and two 36-inch-wide egress gates at the exterior of the existing Auto...
- Carrollton Public Schools (Saginaw County, Michigan) is requesting proposals for removal and replacement of a rooftop unit serving the middle school gymnasium, with bids due June 24, 2026 and a pre-bid meeting held June 10 at 11 a.m. The scope specifies furnishing and installing a new 20-ton Trane Precedent RTU (Model YSK240A4S0H) to replace an existing RUUD unit, with all associated mechanical, structural, and electrical work including duct modifications, gas hookups, roof repairs, duct...
Dundee Community Schools is requesting bids on the completion and finishing of a Career and Technical Education pole barn facility under RFB, with sealed bids due July 22, 2026 at 10:00 a.m. EST and a mandatory walk-through on July 16, 2026 at 10:00 a.m. The contract will be awarded as a Guaranteed Maximum Price structure encompassing all labor, materials, equipment, subcontractors, overhead, and profit. The scope spans framing completion and purlin installation, spray foam insulation (2"–2.5" closed cell for walls, 6" open cell for ceiling), interior white metal liner panels, window finishing, a divider wall with double entry door, two garage door openers, heating and electrical systems, concrete slabs (50' × 60' at 5" thick interior and 31' × 60' at 6" thick exterior approach), excavation and trenching for utilities, and site protection and cleanup. The selected contractor serves as both General Contractor and Construction Manager. Electrical design must comply with NEC standards per Department of Licensing and Regulatory Affairs approval. All manufacturers' warranties and a minimum one-year labor warranty are required. The project may be subject to prevailing wage requirements depending on the source of funds. Bidders must submit company qualifications, project approach and schedule, itemized cost breakdown, lead times, references, proof of insurance, Iran Economic Sanctions Act compliance certification, and a notarized affidavit regarding familial relationships with board members or district personnel. Bid prices remain binding for 60 days from opening. The district reserves the right to reject any or all bids, accept bids in whole or in part, award by individual items or lump sum, or waive any informalities. Bid award is pending final approval by the Dundee Community Schools Board of Education. The facility is located at Dundee Community Schools High School, 130 Viking Drive, Dundee, Michigan 48131; bids are submitted to the district office at 420 Ypsilanti Street, Dundee, Michigan 48131.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
2026 CTE Pole Barn.pdf | 11MB | 6/18/26 |