2026 CTE Pole Barn.pdf
PDF 11 MB Posted
- Attached to
- Construction State and local contract opportunity
- Solicitation number
- RFP DUN 260000002255 1
- Issued by
- Michigan
About this file
This Request for Bid document is issued by Dundee Community Schools, a school district located in Monroe County, Michigan, for the completion and finishing of a Career and Technical Education (CTE) pole barn facility. The project scope encompasses all labor, materials, equipment, supervision, and construction management services necessary to deliver a fully operational space, with the selected contractor serving as both General Contractor and Construction Manager. Major work items include framing completion and purlin installation, spray foam insulation (2"-2.5" closed cell for walls, 6" open cell for ceiling), interior white metal liner panels, window finishing, installation of a divider wall with double entry door, two garage door openers, heating system installation, electrical system installation, concrete slab (50' x 60', 5" thick interior; 31' x 60', 6" thick exterior approach), excavation and trenching for gas and electrical lines, and site protection and cleanup. A mandatory walk-through is scheduled for Thursday, July 16, 2026, at 10:00 A.M. at Dundee Community Schools High School (130 Viking Dr., Dundee, MI 48131). Sealed bids must be received by Wednesday, July 22, 2026, at 10:00 A.M. EST at the district office (420 Ypsilanti St., Dundee, MI 48131), with bids opening immediately thereafter. Bid award is pending final approval by the Dundee Community Schools Board of Education.
The contract will be awarded as a Guaranteed Maximum Price (GMP) that includes all labor, materials, equipment, subcontractors, overhead, and profit, with the contractor responsible for completing the project without exceeding the GMP unless approved change orders are issued. Bids shall remain binding for sixty days from the bid opening date, with prices binding for the length of the contract. Bidders must submit company qualifications, project approach and schedule, itemized cost breakdown, lead times, references, and proof of insurance. The project may be subject to prevailing wage requirements depending on the source of funds. All manufacturers' warranties are required, along with a minimum one-year labor warranty. Dundee Community Schools reserves the right to reject any or all bids, accept bids in whole or in part, award by individual items or lump sum, or waive any informalities. Required certifications include an Iran Economic Sanctions Act compliance certification and a notarized affidavit regarding familial relationships with board members or district personnel. A Department of Licensing and Regulatory Affairs plan review application shows electrical design approval with markups regarding grounding electrode system installation per NEC standards.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BID FOR
C.T.E Pole Barn Completion Project- GC/CM Services
DUNDEE COMMUNITY SCHOOLS
MONROE COUNTY, MICHIGAN
WALK-THROUGH:
Thursday July 16,2026 10 A.M.
BID OPENING:
Wednesday July 22, 2026 10:00 A.M.
DISTRICT BOARD OF EDUCATION
Mr. Christian Freshour, President Mr. Keith Pilbeam, Vice President
Mrs. Jacey Carner, Secretary Mrs. Tara McKenzie, Treasurer Mrs. Patricia Motylinski, Trustee
Mrs. Crystal Root, Trustee Mrs. Kimberly Wilkins, Trustee
Mr. Scott Leach, Superintendent
Mrs. Kimberly Worden, Shared-Time Business Manager
Dundee Community Schools
REQUEST FOR BID
C.T.E Pole Barn Completion Project- GC/CM Services
SCHOOL YEAR: 2026-2027
The Board of Education for the Dundee Community Schools is seeking bids for a C.T.E Pole Barn Completion Project- GC/CM
Sealed bids will be received according to the following instructions:
GENERAL CONDITIONS
1. A walk-through at Dundee Community Schools High School will be held on Thursday July 16, 2026 at 10:00 A.M located at 130 Viking Dr.
Dundee Mi, 48131 on the North Service Drive; located behind the High School.
2. Sealed bids will be received at the Dundee Community Schools 420 Ypsilanti St. Dundee, MI 48131 on or before 10:00 A.M. (EST) Wednesday July 22, 2026. NO LATE BIDS WILL BE ACCEPTED.
BIDS WILL BE OPENED AT 10:00 A.M. (EST) ON Wednesday July 22, 2026.
3. All bids must be in a sealed envelope and clearly marked “C.T.E Pole Barn Completion Project- GC/CM Services” on the face of the envelope carrying said bid, and are to be addressed to:
Kimberly Worden, Shared-Time Business Manager Dundee Community Schools 420 Ypsilanti St.
Dundee, MI 48131
Any questions concerning the bid should be directed to David Todd, David.Todd@dundeeschools.org
4. Bids are to be submitted to fully comply with all aspects in the specifications. Any deviation from what is listed is to be noted on your bid or the bid shall be considered rejected.
mailto:David.Todd@dundeeschools.org
5. Dundee Community Schools reserves the right to reject any or all proposals and bids, including that of the lowest bidder; or to accept bids either in whole or in part; to award contracts by individual items or by lump sum total; or to waive any informalities, defects or omissions in any bid, should it be deemed to be in the best interest of Dundee Community Schools to do so.
6. Bids shall be binding for sixty (60) days from bid opening and prices will be binding for the length of the contract.
7. Awarding of the bid is pending final approval of purchase from Dundee Community Schools Board of Education.
8. Timeframe when project could be started and finished by.
9. This project could be subject to prevailing wages depending on source of funds.
PROJECT OVERVIEW
Project Description The project consists of the completion and finishing of an existing pole barn, including coordination of all trades and delivery of a fully operational space.
The selected contractor will provide all labor, materials, equipment, supervision, and construction management services necessary to complete the project.
The contractor will serve as both:
• General Contractor (GC)
• Construction Manager (CM)
Project intent: Deliver a complete, fully functional installation with no outstanding deficiencies at project closeout.
SCOPE OF WORK
1. GC/CM SERVICES
• Manage all trades and subcontractors
• Develop and maintain project schedule
• Procure materials and equipment
• Provide site supervision and safety oversight
• Coordinate inspections and approvals
The contractor is responsible for all work required whether specifically listed or reasonably inferred.
2. PRE-CONSTRUCTION
• Field verification of existing conditions
• Constructability review
• Project planning and coordination
3. CONSTRUCTION WORK
The Contractor shall provide a complete project including:
• Framing completion and purlin installation
• Spray foam insulation system
• Interior liner panels (walls and ceiling)
• Trim, closures, and finishing components
• Window finishing (metal wrap and J-channel)
• Divider wall double entry door installation
• (2) front garage door opener installations
• Heating system installation
• Electrical system installation
• Concrete slab and exterior approach
• Excavation and trenching
• Site protection and cleanup
4. GENERAL REQUIREMENTS
• Maintain a clean and safe jobsite
• Protect all existing surfaces and materials
• Provide all equipment, lifts, and access
• Coordinate work to minimize disruption
5. SITE CONDITIONS
• Contractor shall verify all existing conditions
• All costs related to identifiable conditions shall be included in bid
6. PROJECT CLOSEOUT
• Complete punch list items
• Clean project site
• Deliver fully operational building
PROPOSAL REQUIREMENTS
Submit:
• Company qualifications
• Project approach and schedule
• Itemized cost breakdown
• Lead times
• References
• Proof of insurance
CONTRACT TERMS
• Contract will be awarded as a Guaranteed Maximum Price (GMP) GMP Includes:
• Labor
• Materials
• Equipment
• Subcontractors
• Overhead and Profit
• Contractor shall complete the project not to exceed the GMP, unless approved charges occur
WARRANTY
• Manufacturer warranties required
• Minimum one (1) year labor warranty
Bid Form
Company Name:
Contact: ___________________________________________________
Total GMP Bid
Cost Breakdown:
• Labor: $________________
• Materials: $________________
• Subcontractors: $__________________
• Equipment & General Conditions: $________________
Schedule
Start Date: _______________
Duration: __________________
Name of Company:
Address:
Phone: Fax:
Signature:
Printed Name:
PROJECT SPECIFICATIONS
1. FRAMING
• Install interior wall framing
• Provide:
o 2x4 wall framing o 2x6 treated skirt board
• Install purlins to support interior liner panels
2. INSULATION (SPRAY FOAM)
• Walls: 2"–2.5" closed cell spray foam
• Ceiling: 6" open cell spray foam
3. INTERIOR FINISH
• Install white metal liner panels:
o Walls o Ceiling
• Include all:
o Trim o Fasteners o Closure strips
4. WINDOW FINISH
• Install metal wrap and J-channel at all windows
5. DOORS & OPENERS
• Install steel double entry door at divider wall
• Install (2) garage door openers at front of barn
6. CONCRETE
• Interior slab: 50' x 60', 5" thick
• Rat walls: 18" deep
• Exterior approach: 31' x 60', 6" thick
7. EXCAVATION
• Trenching for:
o Gas line o Electrical service
8. ELECTRICAL
• Provide complete system per RFP requirements
• All wiring in EMT
• Install all devices, fixtures, and panels
ELECTRICAL SYSTEM (DETAILED)
• All wiring shall be installed in EMT conduit Provide and install:
Power:
• 200 amp feed from school main panel
Devices:
• 30 outlet boxes and receptacles
• 2 – 50A 240V receptacles
• 2 garage door opener receptacles
Lighting:
• 18 high bay LED fixtures
• 2 exterior wall pack lights
Emergency Lighting:
• 2 exit lights
• 2 remote heads
• System shall be fully operational and code-compliant
9. HEATING
• Install tube heater system
• Install gas piping and regulators
• Provide thermostats and controls
HEATING SYSTEM
• Provide and install:
o (2) two-stage tube heaters, 40 feet each o Sidewall venting and combustion air intakes o (2) thermostats with control wiring
• Install:
o 1" underground gas line from meter to building o Interior gas piping and regulators
• System shall be complete, tested, and operational
10. TRIM & ACCESSORIES
• Provide all trim, closures, fasteners, and sealants required
11. SITE PROTECTION & CLEANUP
• Protect all building surfaces
• Maintain clean jobsite
• Remove debris
12. FINAL COMPLETION
• Deliver fully complete and operational pole barn
13. WARRANTY
• Manufacturer warranties
• Minimum 1-year labor
C.T.E Pole Barn Completion Project- GC/CM
Services
BID FORM
Acknowledgement of Authority to Bid
My signature certifies that the proposal as submitted complies with all Terms and Conditions set forth in this RFB. My signature also certifies that the accompanying proposal is not the result of, or affected by, any unlawful at of collusion with another person or company engaged in the same line of business or commerce or any act of fraud. Furthermore, I understand that fraud and unlawful collusion are crimes under Federal Law and can result in fines, prison sentences and civil damages awards.
I hereby certify that I am authorized to sign as a representative for the following firm:
Firm Name:
Firm Address:
Signature:
Printed Name:
Business Phone: Cellular Phone:
CERTIFICATION OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner, or authorized officer of the below-named company (the “Company”) hereby certifies, represents, and warrants that the Company (which includes its officers, directors and employees) is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event the Company is awarded a contract by Dundee Community Schools as a result of an RFP, the Company is not and will not become an “Iran Linked Business” at any time during the course of performing any services under the contract.
The Company further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of Dundee Community Schools’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date the it is determined that the person has submitted the false certification.
Name of Company
Name and Title of Authorized Representative
Signature
Date
AFFIDAVIT FAMILIAL RELATIONSHIP
THE AFFIDAVIT SET FORTH BELOW MUST BE EXECUTED ON BEHALF OF
THE VENDOR AND FURNISHED WITH EVERY BID/QUOTE
The Board of Education will not accept this bid without this completed, signed and notarized form
STATE OF: ___________________
COUNTY OF: ________________
________________________________ , being sworn, says (Affiant’s printed name)
1. I am the __________________of ________________________________ (title) (vendor bidder) which has submitted, to DUNDEE COMMUNITY SCHOOLS, a bid for a C.T.E Pole Barn Completion Project- GC/CM
2. I state that there is NO familial relationship between the owner or any employee of above Vendor-Bidder and any member of the Board of Education or the Superintendent of Dundee Community Schools, said exceptions being as follows:
Signed: ___________________________________
Printed: __________________________
SWORN TO and subscribed before me, a Notary Public, in and for the above named state and county this _________________ day of _______________, 2026. My commission expires on ______________________________.
Signature: ____________________________________________, Notary Public
Know what's before you dig.
below.CallR
(7
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
D
AV
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N C
(7
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N C
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N C
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N C
FO
R
RE
FE
RE
N
CE
O N
LY
below.CallR
(7
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N below.CallR
(7
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N
Reviewer Name Reviewer Email Reviewer Phone
Neil Pline PlineN@michigan.gov 517-280-9516
Department of Licensing and Regulatory Affairs
Report Date: 07/23/2024 Description : Electrical Design for CTE Storage Building Address : 130 VIKING DR, DUNDEE, MI, 48131 Record Type : Bureau of Construction Codes Plan Review Application Document Filename : 5345 E.100 Bullerin #2 - 7.03.24.pdf
Reviewer Contact Information:
Markups for this Approved Document or Plan
Final Report - Approved
Comment ID Page Ref Reviewer : Department Review Comments
1 E.100 Neil Pline : Electrical NEC, Sections 250.4, 250.32, 250.50, 250.52, 250.53, and Table 250.66 - Buildings or structures supplied by a feeder or branch circuit shall have a grounding electrode system installed and connected at the disconnecting means to the equipment grounding conductor routed with the supply conductors.
General Comments
1st Floor Ottawa Building 611 W. Ottawa Street Lansing, MI 48933
Application Number: PR2024BCC-002336 below.CallR
(7
) 8
-5
PH
O N
E:
M
AI
N
S
TR
EE
T, D U
N D
EE
, M
I 4
ID
AR
TH
U
R C
O N
SU
L
T A
N T
S, I
N
File details come from the government source that posted it. Updated .