Middle School Gym Rooftop Unit Replacement
- Carrollton Public Schools in Saginaw County, Michigan is requesting proposals for complete removal and replacement of the rooftop unit serving the middle school gymnasium, with sealed bids due June 18, 2026 at 11:00 a.m. and a pre-bid meeting scheduled for June 10, 2026 at 11:00 a.m. at the middle school main office. The scope is furnishing and installing one new 20-ton Trane Precedent RTU (Model YSK240A4S0H) with all labor, materials, equipment, permits, and coordination for full operational...
- Gaylord Community Schools is requesting sealed bids for installation of a rooftop Make-up Air Unit at North Ohio Elementary School, 912 North Ohio Avenue, Gaylord, Michigan, with bids due July 1, 2026 at 1:00 p.m. local time. A mandatory pre-bid meeting and site examination is scheduled for June 24, 2026 at 11:30 a.m. at the school's main entrance vestibule. Bidders must comply with Michigan's Iran Economic Sanctions Act (PA 517 of 2012) and submit a sworn, notarized certification that they...
- Pellston Public Schools in Emmet County, Michigan is requesting proposals for design-build air-conditioning installation in the high school gymnasium under an RFP with proposals due June 30, 2026 at 1:30 p.m., and a mandatory pre-bid meeting on June 23, 2026 at 1:30 p.m. at the District's Central Office in Pellston. The scope is design-build installation of rooftop cooling units, roof-structure reinforcement, ductwork installation, electrical power provisioning per Michigan code, integration...
- Huron Intermediate School District is requesting bids for roofing replacement at its administrative building located at 1299 S. Thomas Rd., Bad Axe, Michigan, with bids due June 23, 2026 at 2:00 p.m. and a pre-bid conference on June 10, 2026 at 2:00 p.m. The scope encompasses complete roof replacement including removal of existing metal roof panels, inspection and replacement of underlayment as required, installation of a 60-mil Duro-Tuff membrane extending a minimum of 36 inches up the roof...
- Beal City Public Schools is requesting sealed bids for Bid Pack No. 4 – Series 2 Summer 2027 Renovations at Beal City High School in Mount Pleasant, Michigan, with bids due July 1, 2026 at 11:00 a.m. and a pre-bid meeting and project walk-through scheduled for June 19, 2026 at 11:00 a.m. The scope spans multiple bid divisions under separate prime contracts: concrete, masonry, metals, general trades, roofing, glass and glazing, drywall/insulation/acoustical work, flooring, painting, stage...
- Three Oaks Public School Academy is requesting sealed bids for the 2026 TOPSA Heating System Upgrade (Project #25213) in Muskegon, Michigan, with bids due June 23, 2026 at 12:00 p.m. Eastern Time. A mandatory pre-bid meeting is scheduled for June 12, 2026 at 9:00 a.m. Eastern Time at the Academy's main office. Each bid submission must include a 5% bid bond or certified check and three sworn, notarized disclosure statements: a criminal background affidavit; a statement disclosing any familial...
- Lapeer County Intermediate School District is soliciting sealed bids for replacement of asphalt shingle roofs with steel metal roofing on two barn structures at the Education & Technology Center, 690 N. Lake Pleasant Road, Attica, Michigan, with bids due June 30, 2026 at 2:00 p.m. EST and a mandatory pre-bid meeting on June 15, 2026 at 8:00 a.m. EST at the project site. Barn 1 (ETC Storage — Northern building) requires 7,950 square feet of steel roofing on the east side only. Barn 2...
- Mecosta-Osceola Intermediate School District (MOISD) in Big Rapids, Michigan is requesting proposals for roofing and insulation installation at the MOISD Campus Career Center building, with proposals due July 2, 2026 at 2:00 p.m. and a mandatory pre-bid walk-through on June 19, 2026 at 1:00 p.m. at the project site (15830 190th Avenue, Big Rapids). The scope consists of two parts: Part One covers roofing the main Career Center building over an existing metal roof with expanded polystyrene...
Carrollton Public Schools (Saginaw County, Michigan) is requesting proposals for removal and replacement of a rooftop unit serving the middle school gymnasium, with bids due June 24, 2026 and a pre-bid meeting held June 10 at 11 a.m. The scope specifies furnishing and installing a new 20-ton Trane Precedent RTU (Model YSK240A4S0H) to replace an existing RUUD unit, with all associated mechanical, structural, and electrical work including duct modifications, gas hookups, roof repairs, duct insulation, controls integration, testing, commissioning, and balancing. The work is subject to prevailing wage requirements. Place of performance is 3211 Carla Drive, Saginaw, MI 48604. Substantial completion is required by August 7, 2026 with all disruptive activities scheduled during summer vacation when school is not in session. A 5% bid bond and performance and labor-material payment bonds are required for bids of $50,000 or greater. Bid prices must remain firm through contract completion with no allowance for federal, state, or local sales and use taxes. Selected contractor must submit post-bid information within seven days of award notification, including supplier proprietary names, subcontractor lists, job site staff qualifications, insurance certificates, construction schedule, and schedule of values. All work carries a 12-month warranty from substantial completion. Invoices must be submitted within 30 days of work completion, with June work invoiced by June 30; payment follows 30 days after work acceptance. The contractor is responsible for safety, site cleanup, material disposal in compliance with EPA and DNR regulations, permit acquisition, and reporting environmental releases or criminal charges of listed offenses among workers within three business days. Addendum #1, posted June 16, 2026, modifies project specifications and clarifies existing facility conditions; acknowledgment of receipt is required with bid submission.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Addendum #1.pdf | 1MB | 6/16/26 | ||
6-3-2026 MIDDLE SCHOOL GYM RTU REPLACEMENT RFP - Google Docs.pdf | 3MB | 6/16/26 |