Construction Management & Inspection Services - Cherry Avenue Sewer Improvement Project (SC-0512)
Open State & local contract opportunity Posted
- Solicitation number
- UD-26-362
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC code
- Points of contact
-
- Fernando Eggleston fernando.eggleston@lbwater.org (562) 570-2329
- Matthew Cruz matthew.cruz@lbwater.org (562) 570-2332
Opportunity details come from longbeachbuys.buyspeed.com. Updated .
About this opportunity
The Long Beach Public Utilities Department is requesting proposals for construction management and inspection services on the Cherry Avenue Sewer Improvement Project (SC-0512), with proposals due October 29, 2026.
The scope spans approximately 3,100 linear feet of sewer line installation using vitrified clay pipe (VCP) or high-density polyethylene (HDPE) pipe in sizes 10 to 18 inches, along with construction of multiple 48 and 60-inch diameter maintenance holes across Cherry Avenue, E. Anaheim Street, and Gardenia Avenue in Long Beach, California. Work includes removal, replacement, or abandonment of existing 8 to 15-inch sewer mains and manholes; dewatering and sewer flow bypassing; closed-circuit television (CCTV) video inspection prior to and following construction; pavement work; trenching; backfilling; and compacting. The contractor must coordinate with multiple utility providers including Southern California Edison, Verizon, AT&T, Spectrum, Los Angeles County Sanitation Districts (LACSD), and others; maintain traffic control per California Department of Transportation standards; provide sewer bypass plans; and manage dewatering operations. Construction work hours are restricted to 7:00 a.m. to 4:00 p.m. on weekdays, with traffic speed limits reduced to 25 miles per hour on Cherry Avenue and 30 miles per hour on Anaheim Street during construction. The contractor must notify Long Beach Transit 72 hours prior to work commencement for bus stop relocation and contact the City's Traffic Operations Division 48 hours before work start. All work must comply with NPDES permits, environmental requirements, LBUD Standard Specifications and Drawings, LACSD Standard Specifications, City of Long Beach Pedestrian Access During Construction Projects Standards, and ADA accessibility requirements. Design plans were approved September 15, 2026 by the Long Beach Public Utilities Department's Senior Director of Engineering.
Opportunity text
The Work consists of Construction Management and Inspection Services for the Cherry Avenue Sewer Improvement Project. The project includes, but is not limited to: the installation of around 3,100 linear feet of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line and new sewer maintenance holes; removal, replacement or abandonment of existing sewer lines and manholes; dewatering; sewer flow bypassing; video inspection; pavement work; trenching; backfilling and compacting.