Charlotte Water is soliciting sealed bids for the Collective Storm Drainage Improvement Project – Series AD, a four-project storm drainage rehabilitation and installation program, with bids due November 19, 2026 at 2:00 p.m. local time. The City of Charlotte has established a Small Business Enterprise goal of 5.00% for this project.

The scope comprises four infrastructure components across Mecklenburg County and Cleveland Town, North Carolina. Tipperary Place 4213 involves rehabilitation of a 60-linear-foot 8' x 6' reinforced concrete box culvert, addressing exposed rebar, concrete delamination, and vegetation removal from inside the culvert or in front of headwalls. Randolph Road 4023 requires removal and replacement of approximately 234 linear feet of 15-inch reinforced concrete pipe with water and sewer relocations and a phased traffic control plan. Randolph Road 4600 addresses failing infrastructure and tail ditching through removal and replacement of approximately 102 linear feet of 18-inch reinforced concrete pipe with sewer relocation and phased traffic control. Vail Avenue 2607 involves new storm drainage infrastructure installation, including approximately 358 linear feet of 18-inch pipe, 36 linear feet of 24-inch pipe, 10 structures, approximately 500 linear feet of curb and gutter, and two sewer relocations.

The estimated project cost is $1,425,701. A pre-bid conference is scheduled for 2:00 p.m. on November 5, 2026, via Microsoft Teams; attendance is strongly encouraged but not mandatory. Bidding documents are available from Richa Graphics at multiple locations and online at planroom.richa.com. Addenda, clarifications, and project information are posted on Charlotte's Procurement Portal at charlottenc.bonfirehub.com. North Carolina law applies to the contract. The City reserves the right to reject any or all bids.

Opportunity text

Collective SDIP Series AD consists of four projects: Tipperary Place 4213: This project is a rehabilitation of an existing 60 linear foot 8' x 6' RCBC. The rehabilitation consists of four different methods including addressing exposed rebar, concrete elamination, and vegetation removal. All these methods will be addressed from inside the culvert or directly Infront of the headwalls. Randolph Road 4023: This project will address failing infrastructure in Randolph Road. The project will remove and replace approximately 234 LF of 15" RCP. Water and Sewer relocations will be required. A phased traffic control plan will be required for improvements in Randolph Road right of way. Randolph Road 4600: This project will address failing infrastructure in Randolph Road and tail ditching at the outfall. The proposed plan will remove and replace approximately 102 LF of 18" RCP. Sewer relocation will be required. A phased traffic control plan will be required for improvements in Randolph Road right of way. Vail Avenue 2607: This project will install storm drainage infrastructure to a portion of Vail Avenue to better capture runoff. The proposed plan will install approximately 358 LF of 18" RCP, 36 LF of 24" RCP, and 10 structures. Approximately 500 LF of curb and gutter will be installed. Two sewer relocations will be required.

Files

File Type Posted
Collective Storm Drainage Improvement - Series AD.pdf PDF