CMAR Services - Historic Carver Technical Education Center Facility Remodel

Closed State & local contract opportunity Posted

Solicitation number
27C-005H
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The School Board of Palm Beach County, Florida is requesting proposals for Construction Management at Risk services for the Historic Carver Technical Education Center facility remodel at 301 SW 14th Avenue, Delray Beach, with proposals due August 10, 2026 at 2:00 p.m. EDT via BidNet Direct. Proposers must be Florida-licensed Certified General Contractors or Certified Building Contractors prequalified by the School Board prior to the proposal due date — this is a mandatory eligibility gate. The School Board has established a Small Business Enterprise (SBE) preference program with a size standard ceiling of $13,000,000 in average gross sales over three years for Construction Services classifications.

The scope encompasses demolition of Buildings #2, #8, and #13; remodel of Buildings #1 and #12; expansion of parking lots, vehicular circulation, and pedestrian paths; and installation of new building signage and security systems. The preconstruction phase requires cost analysis, estimates for three design phases (Schematic Design, Design Development, and Construction Documents), project schedules, and design recommendations for building, structural, and mechanical systems. The Guaranteed Maximum Price budget is $14.25 million. A preconstruction phase fee and reimbursable expenses will be negotiated with the top-ranked proposer. The District maintains a Direct Material Purchase Program to recover sales taxes on owner-purchased materials.

Proposals must include proof of active business licenses, bonding capability letters, insurance certificates, drug-free workplace certifications, and beneficial interest disclosures. Questions are due July 27, 2026 via BidNet Direct, with final addenda issued August 3, 2026. The Selection Committee meets August 25, 2026 at 9:00 a.m. EDT. Contract award is anticipated in November 2026, with design notice to proceed October 19, 2026, construction document completion targeted for April 30, 2027, and permitted construction documents by May 31, 2027. Proposal tabulation and recommendations will be posted no later than August 28, 2026, available for 72 hours. Protests under Florida Statutes Section 120.57(3) may be filed by adversely affected interested parties within prescribed timeframes.

Opportunity text

2 versions

Update #2 · Latest ·

Planned Scope of Work:Demolition of Building #2, Building #8, and Building #13 per the DOE-approved Castaldi Analysis and Educational Plant Survey. Remodel Building #1 and Building #12 to accommodate the Educational Programs and to meet all Building Codes. Expand the existing parking lots, vehicular circulation, and pedestrian path to accommodate the proposed campus-wide scope of work. New parking lot and drainage improvements as required New building sign for Building 17 with the new schools name: Historic Carver Technical Education Center. Install First Respondents security signage on the exterior walls of the buildings and roof(s). The preservation and remodel of the existing buildings may include, but are not limited to the following new scope of work: Roof HVAC Electrical Water Service Sewer Service Elevator Cabling and Networking Removing some interior walls and/or structural redesign of load-bearing walls Structural interior shell renovations Structural exterior shell renovations Fenestration ADA compliance Preconstruction Phase:Provide cost analysis Provide estimates for the construction of the following three design phases Schematic Design Phase Design Development Construction Document Development Provide a project schedule and phase plan as directed by the owner Review and offer design recommendations for the building, structural, and mechanical systems during the three design phases. Attachments:New Site Plan Phase II The CONSTRUCTION MANAGER shall provide all Preconstruction Phase Services necessary to establish a GMP as well as all Construction Phase Services following Award of the GMP for each school identified in this Project Notification. The CONSTRUCTION MANAGER may be required to complete portions of the construction on an occupied campus as directed by the OWNER. The CONSTRUCTION MANAGER shall provide deferred maintenance, renovation and repairs to school facilities including, but not limited to, ADA and CSIR compliance requirements, replacement of exterior doors and windows, roof repair, upgrades to the intercom/sound system, security system, fire alarm system, HVAC system, electrical switchgear, lighting replacement (interior and exterior), paving and play court resurfacing, marquees and scoreboards, plumbing work, bathroom replacements, ceiling and flooring replacements, interior finishes/painting/casework, and other Work as may be required by the OWNER. Construction shall incorporate all of the requirements set forth in the Permitted Construction Documents, School District of Palm Beach County Master Specifications, District Design Criteria, State Requirements for Educational Facilities (SREF) 2014, Florida Administrative Code (FAC) Chapter 6A-2, and Florida Building Code. The CONSTRUCTION MANAGER shall prepare all Project Documents in accordance with the requirements stated in the Department of Educations Chapter 6A-2, SREF and FAC.

Update #1 ·
  • The School Board of Palm Beach County, Florida, invites Certified General Contractors or Certified Building Contractors prequalified by the School Board, pursuant to SREF Chapter 4.1 prior to the Proposal Due Date, to submit a Proposal for: CONSTRUCTION MANAGEMENT SERVICES FOR: FACILITY REMODELPROJECT NAME: HISTORIC CARVER TECHNICAL EDUCATION CENTER PROJECT ADDRESS: 301 SW 14th AVE. DELRAY BEACH, FL 33444 RFP NO.: 27C-005H PROJECT NO.: 0904-8464 PROPOSALS SHOULD BE BASED UPON THE FOLLOWING DESCRIPTION OF WORK:History of the Site:In 1958 the school was built in its current location, where it became a dedicated high school for Black students in grades 9 through 12 during segregation. After desegregation, the former Carver high school campus was repurposed as the Delray Full-Service Center. The site carries significant historical weight and has a proud history. Over the years, the facility has benefited the community in multiple ways. It has educated many residents who became leaders, business owners, and professionals. The Historic Carver continues to function as a center for adult education and career training, honoring the legacy of Carvers educational contribution while preparing students for current workforce demands. As of late 2024 and 2025, the campus underwent a major transformation, which included the demolition of older buildings and the preservation of original buildings, with the gymnasium converted into a multipurpose facility. The redevelopment introduced a new 20,000 square-foot, two-story adult education facility that houses advanced labs for health sciences, IT, and construction. The existing campus parking lots, utilities, and site drainage does not accommodate the proposed Historic Carver Technical Education Center redevelopment and remodel project. This RFP is for the scope of work which includes the demolition, site development, and remodel of existing facilities as depicted in the attached concept site plan and explanation below. Planned Scope of Work:Demolition of Building #2, Building #8, and Building #13 per the DOE-approved Castaldi Analysis and Educational Plant Survey. Remodel Building #1 and Building #12 to accommodate the Educational Programs and to meet all Building Codes. Expand the existing parking lots, vehicular circulation, and pedestrian path to accommodate the proposed campus-wide scope of work. New parking lot and drainage improvements as required New building sign for Building 17 with the new schools name: Historic Carver Technical Education Center. Install First Respondents security signage on the exterior walls of the buildings and roof(s). The preservation and remodel of the existing buildings may include, but are not limited to the following new scope of work: Roof HVAC Electrical Water Service Sewer Service Elevator Cabling and Networking Removing some interior walls and/or structural redesign of load-bearing walls Structural interior shell renovations Structural exterior shell renovations Fenestration ADA compliance Preconstruction Phase:Provide cost analysis Provide estimates for the construction of the following three design phases
    • Schematic Design Phase Design Development Construction Document Development
    Provide a project schedule and phase plan as directed by the owner Review and offer design recommendations for the building, structural, and mechanical systems during the three design phases