palm beach county school 27C-005H CMAR Historic Carver - Final.pdf
PDF 1 MB Posted
- Solicitation number
- 27C-005H
- Issued by
- Palm Beach County, Florida
About this file
Summary of RFP 27C-005H for Construction Management at Risk Services
This is a Request for Proposal (RFP) issued by the School Board of Palm Beach County, Florida, for Construction Management (CM) at Risk Services to oversee facility remodel at the Historic Carver Technical Education Center located at 301 SW 14th Avenue, Delray Beach, Florida. The project encompasses demolition of Buildings #2, #8, and #13; remodel of Buildings #1 and #12; expansion of parking lots, vehicular circulation, and pedestrian paths; and installation of new building signage and security systems. The preconstruction phase requires the CM to provide cost analysis, estimates for three design phases (Schematic Design, Design Development, and Construction Documents), project schedules, and design recommendations for building, structural, and mechanical systems. The established Guaranteed Maximum Price (GMP) budget is $14,250,000. Proposals are due August 10, 2026, no later than 2:00 p.m. EDT via BidNet Direct. The Selection Committee will meet on August 25, 2026, at 9:00 a.m. EDT with the scheduled contract award in November 2026. The design notice to proceed is October 19, 2026, with construction document completion targeted for April 30, 2027, and permitted construction documents by May 31, 2027.
The RFP requires proposers to be Florida-licensed Certified General Contractors or Certified Building Contractors prequalified by the School Board. Proposers must submit proof of active business licenses, bonding capability letters, insurance certificates, drug-free workplace certifications, and beneficial interest disclosures. The School Board has established a Small Business Enterprise (SBE) preference program, with a size standard ceiling of $13,000,000 in average gross sales over three years for Construction Services classifications. A preconstruction phase fee and reimbursable expenses will be negotiated with the top-ranked proposer. The District maintains a Direct Material Purchase Program to recover sales taxes on owner-purchased materials. Questions must be submitted via BidNet Direct by July 27, 2026, with final addenda issued August 3, 2026. All proposals must be submitted electronically through BidNet Direct; hardcopy submissions will not be accepted. The proposal tabulation and recommendations will be posted no later than August 28, 2026, and remain available for 72 hours. Interested parties adversely affected may file a protest within prescribed timeframes under Florida Statutes Section 120.57(3).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| palm beach schools 27C-005H CMAR Historic Carver - Final (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Revised 2.26.2026
THE SCHOOL DISTRICT OF PALM BEACH COUNTY, FLORIDA
REQUEST FOR PROPOSAL (RFP)
RFP NO.: 27C-005H
CONSTRUCTION MANAGEMENT (CM) AT RISK SERVICES
FOR
FACILITY REMODEL AT HISTORIC CARVER TECHNICAL EDUCATION CENTER
PROJECT NO.: 0904-8464
PROPOSAL DUE DATE:
August 10, 2026, NO LATER THAN 2:00 P.M., EDT
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO
BidNet Direct @ www.bidnetdirect.com
The RFP document and all additional project information published as part of the RFP document may be obtained at: BidNet Direct @ www.bidnetdirect.com. BidNet
Direct will not allow offers to be submitted after the closing date and time.
2 Revised 2.26.2026
SECTION 00002
CONSTRUCTION MANAGEMENT (CM) AT RISK SERVICES FOR
FACILITY REMODEL
PROJECT NAME: HISTORIC CARVER TECHNICAL EDUCATION CENTER
RFP # 27C-005H
TABLE OF CONTENTS
SECTION & TITLE PAGES
SECTION 00001 TITLE PAGE
SECTION 00002 TABLE OF CONTENTS ..................................................................... 2-3
SECTION 00030 PROJECT NOTIFICATION - REQUEST FOR PROPOSAL .................... 4-6
SECTION 00050 NOTICE TO CONTRACTORS – SBE
SECTION 00100 INSTRUCTIONS TO PROPOSERS .................................................. 8-18
SECTION 00700 GENERAL CONDITIONS ............................................................. 19-54
SECTION 00830 SPECIAL CONDITIONS .............................................................. 55-71
SECTION 00600 SUPPLEMENTAL CONDITIONS ................................................... 72-84
SECTION 00510 OWNER-CM at RISK CONTRACT ............................................... 85-158
ADDITIONAL DOCUMENTATION NUMBER OF PAGES
REQUIRED RESPONSE FORMS
A PROPOSAL RESPONSE FORM
B DISCLOSURE OF DISCRIMINATION COMPLAINTS STATEMENT
C SBE SUBCONTRACTOR/SUBCONSULTANT PARTICIPATION RESPONSE
EXHIBITS
A AMENDMENT TO CONTRACT
B GMP SUMMARY
C PRECONSTRUCTION SERVICE FEE SUMMARY
D CONSTRUCTION PHASE SERVICES FEE SUMMARY
E CM STAFF PER DIEM FOR TIME EXTENSIONS
F CONSTRUCTION TEAM AUTHORIZED REPRESENTATIVES
G CHANGE ORDER RATE SCHEDULE
H BUILDER’S RISK QUESTIONNAIRE
3 Revised 2.26.2026
ATTACHMENTS
A PERFORMANCE BOND & LABOR & MATERIAL PAYMENT BOND – 00610-PB/LMPB
B DISTRICT PURCHASED MATERIALS (DPM) PROGRAM
C DIRECT PURCHASED MATERIAL (DPM) LOG
D DIRECT PURCHASED MATERIAL (DPM) MATRIX GMP
E TRENCH SAFETY ACT COMPLIANCE
F SBE PARTICIPATION LETTER OF INTENT – PBSD 1525
G SBE PARTICIPATION SUMMARY – PBSD 1526
H SBE SUBCONTRACTOR PARTICIPATION GOOD FAITH EFFORT – PBSD 1527
I DRUG FREE WORKPLACE CERTIFICATION
J SCRUTINIZED COMPANIES LIST CERTIFICATION
K SBE GOOD FAITH MEMORANDUM – PBSD 1611
L BENEFICIAL INTEREST FORM AND DISCLOSURE OF OWNERSHIP AFFIDAVIT –
PBSD 1997
M FINAL RELEASE AND VERIFICATION OF PAYMENT –PBSD 1621
N SBE GOOD FAITH EFFORT NONCOMPLIANCE SUPPLEMENT –PBSD 1629
O CONSTRUCTION ALLOWANCE USE REQUEST –PBSD 2348
P ALLOWANCE LOG GMP
Q ALLOWANCE MATRIX
R CONSTRUCTION SCHEDULE OF VALUES
S SUBCONTRACTOR RECONCILIATION REPORT
T SUBCONTRACTOR AND SUBCONSULTANT PAYMENT LEDGER
V CONSTRUCTION MANAGER’S FINAL PAYMENT CHECKLIST
W CLOSEOUT CHECKLIST
X BYRD ANTI-LOBBYING AMENDMENT
APPENDICES
AA CLOSEOUT REPORT INSTRUCTIONS
BB CONTRACT CLOSEOUT COMPLIANCE REPORT
CC CONSTRUCTION CONTINGENCY USE AUTHORIZATION (CCUA)
DD CONSTRUCTION CONTINGENCY USE DIRECTIVE (CCUD)
EE COPR/CCD LOG
FF COPR/CCD MATRIX
GG CONSTRUCTION CONTINGENCY LOG
HH CONSTRUCTION CONTINGENCY MATRIX
II PRECONSTRUCTION AND GENERAL REQUIREMENTS REIMBURSABLE EXPENSES
4 Revised 2.26.2026
SECTION 00030
PROJECT NOTIFICATION
REQUEST FOR PROPOSAL (RFP)
CONSTRUCTION MANAGEMENT (CM) AT RISK SERVICES
The School Board of Palm Beach County, Florida invites Certified General Contractors or
Certified Building Contractors prequalified by the School Board, pursuant to SREF Chapter
4.1 prior to the Proposal Due Date, to submit a Proposal for:
CONSTRUCTION MANAGEMENT SERVICES FOR: FACILITY REMODEL
PROJECT NAME: HISTORIC CARVER TECHNICAL EDUCATION CENTER
PROJECT ADDRESS: 301 SW 14th AVE.
DELRAY BEACH, FL 33444
RFP NO.: 27C-005H
PROPOSALS SHOULD BE BASED UPON THE FOLLOWING DESCRIPTION OF WORK:
History of the Site:
In 1958 the school was built in its current location, where it became a dedicated high school for
Black students in grades 9 through 12 during segregation. After desegregation, the former Carver high school campus was repurposed as the Delray Full-Service Center. The site carries significant historical weight and has a proud history. Over the years, the facility has benefited the community in multiple ways. It has educated many residents who became leaders, business owners, and professionals. The Historic Carver continues to function as a center for adult education and career training, honoring the legacy of Carver’s educational contribution while preparing students for current workforce demands.
As of late 2024 and 2025, the campus underwent a major transformation, which included the demolition of older buildings and the preservation of original buildings, with the gymnasium converted into a multipurpose facility. The redevelopment introduced a new 20,000 square-foot, two-story adult education facility that houses advanced labs for health sciences, IT, and construction. The existing campus parking lots, utilities, and site drainage does not accommodate the proposed Historic Carver Technical Education Center redevelopment and remodel project. This
RFP is for the scope of work which includes the demolition, site development, and remodel of existing facilities as depicted in the attached concept site plan and explanation below.
Planned Scope of Work:
• Demolition of Building #2, Building #8, and Building #13 per the DOE-approved Castaldi
Analysis and Educational Plant Survey.
• Remodel Building #1 and Building #12 to accommodate the Educational Programs and to meet all Building Codes.
• Expand the existing parking lots, vehicular circulation, and pedestrian path to accommodate the proposed campus-wide scope of work.
• New parking lot and drainage improvements as required
• New building sign for Building 17 with the new school’s name: “Historic Carver Technical
Education Center.”
• Install First Respondents security signage on the exterior walls of the buildings and roof(s).
• The preservation and remodel of the existing buildings may include, but are not limited to the following new scope of work:
o Roof o HVAC
5 Revised 2.26.2026 o Electrical o Water Service o Sewer Service o Elevator o Cabling and Networking o Removing some interior walls and/or structural redesign of load-bearing walls o Structural interior shell renovations o Structural exterior shell renovations o Fenestration o ADA compliance
Preconstruction Phase:
• Provide cost analysis
• Provide estimates for the construction of the following three design phases o Schematic Design Phase o Design Development o Construction Document Development
• Provide a project schedule and phase plan as directed by the owner
• Review and offer design recommendations for the building, structural, and mechanical systems during the three design phases
Attachments:
• New Site Plan Phase II
The CONSTRUCTION MANAGER shall provide all Preconstruction Phase Services necessary to establish a GMP as well as all Construction Phase Services following Award of the GMP for each school identified in this Project Notification. The CONSTRUCTION MANAGER may be required to complete portions of the construction on an occupied campus as directed by the OWNER. The
CONSTRUCTION MANAGER shall provide deferred maintenance, renovation and repairs to school facilities including, but not limited to, ADA and CSIR compliance requirements, replacement of exterior doors and windows, roof repair, upgrades to the intercom/sound system, security system, fire alarm system, HVAC system, electrical switchgear, lighting replacement (interior and exterior), paving and play court resurfacing, marquees and scoreboards, plumbing work, bathroom replacements, ceiling and flooring replacements, interior finishes/painting/casework, and other
Work as may be required by the OWNER.
Construction shall incorporate all of the requirements set forth in the Permitted Construction
Documents, School District of Palm Beach County Master Specifications, District Design Criteria, State Requirements for Educational Facilities (SREF) 2014, Florida Administrative Code (FAC)
Chapter 6A-2 and Florida Building Code. The CONSTRUCTION MANAGER shall prepare all Project
Documents in accordance with the requirements stated in Department of Education’s Chapter 6A-
2, SREF and FAC.
ESTABLISHED GMP CONSTRUCTION BUDGET: $ 14,250,000.00
CONSTRUCTION SCHEDULE:
AWARD OF DESIGN CONTRACT ............................................................ October 14, 2026
DESIGN NOTICE TO PROCEED ............................................................... October 19, 2026
COMPLETION OF SCHEMATIC DESIGN/SV REPORT ............................ December 18, 2026
COMPLETION OF 100% DESIGN DEVELOPMENT ................................... February 26, 2027
COMPLETION OF 100% CONSTRUCTION DOCUMENTS ............................... April 30, 2027
PERMITTED CONSTRUCTION DOCUMENTS................................................... May 31, 2027
6 Revised 2.26.2026
SCHEDULE FOR SELECTION:
PROPOSALS DUE: August 10, 2026, NO LATER THAN 2:00 P.M., EDT via BidNet Direct @ www.bidnetdirect.com
SELECTION COMMITTEE MEETING*: August 25, 2026 at 9:00 A.M., EDT
SCHEDULED AWARD OF CONTRACT: October 14, 2026
*OPEN TO PUBLIC ATTENDANCE at North County Support Center, 3661 Interstate Park Road
North, 1st Floor Conference Room, Riviera Beach, FL 33404.
All questions regarding this solicitation must be submitted via BidNet Direct @ www.bidnetdirect.com NO LATER THAN 2:00 P.M., EDT on July 27, 2026.
Only questions received via BidNet Direct @ www.bidnetdirect.com by the time and date specified will be answered by Addendum and posted on BidNet Direct. Branden Brown is authorized only to direct the attention of prospective proposers to various portions of the RFP so they may read and interpret such for themselves. Neither Branden Brown nor any employee of the District is authorized to interpret any portion of this RFP or give information as to the requirements of the RFP in addition to that contained in the written documents.
All questions submitted (along with their source) are subject to Public Records Law and as such will be available for inspection upon receipt of a Public Records Request. There shall be no communication between Selection Committee Members or their staff and the Proposers.
The RFP document and all additional Project information published as part of the RFP document may be obtained at: BidNet Direct @ www.bidnetdirect.comm
FOR GENERAL INQUIRIES CONTACT: Branden Brown at 561-882-1911 or by email at
Branden.brown@palmbeachschools.org.
SMALL BUSINESS ENTERPRISE (SBE) PREFERENCES
As specified by Board Policy 6.144, the School District of Palm Beach County shall apply preferences for Small Business Enterprises (SBE) in the District’s Procurement Process for the solicitation of
Professional Services Contracts.
In order to receive consideration for SBE preference the firm(s) to be utilized by the Proposer must be Certified by the District at the time the Proposal is submitted.
For more information on the District’s SBE programs see School Board Policy 6.144 and the SBE
Procedures Manual. The Manual and Directory of Certified SBE Firms can be found at:
https://www.palmbeachschools.org/departments/small-business-development.
INDUSTRY SPECIFIC CLASSIFICATIONS
To ensure compliance with program guidelines and intent, Proposers will receive SBE
Preference ONLY if their SBE Classification is consistent with, and meets the standards identified in the Industry Specific Classifications and thresholds contained in School
Board Policy 6.144 and the Office of Small Business Development’ Procedures Manual.
THE INDUSTRY SPECIFIC CLASSIFICATION FOR THIS SOLICITATION IS:
• Construction Services - Small Business Enterprise Owned Firm
7 Revised 2.26.2026
REVENUE/SALES SIZE STANDARDS FOR INDUSTRY SPECIFIC CLASSIFICATIONS
Any firm that has exceeded gross sales or revenues (averaged over the last three [3] years) greater than the amounts below shall not be considered eligible to participate in the School District’s SBE program.
• $13,000,000 for Construction Services
LOBBYING
From the time this RFP is advertised until the time a decision or intended decision for Award is posted, potential Proposers and employees, representatives, partners, director, officers, or other individuals acting on behalf of the Proposer, shall be prohibited from communicating with any School
District employee, member of the School Board, member of a School District Advisory Committee or person selected to evaluate or recommend selection of the Awarded Proposer. All communication involving this RFP must be through the Construction Purchasing Department. All oral or written inquiries must be directed through the Purchasing Department. Violation of this “Cone of Silence” shall result in rejection/disqualification of the Proposer from Award of a Contract arising out of this solicitation.
No proposers or persons acting on behalf of the proposer may lobby any District personnel or Board members regarding this RFP from the date the RFP is released until the administration's
Recommendation for Award has been posted on BidNet Direct. Lobbying is defined as any action taken by an individual, firm, association, Joint Venture, partnership, syndicate, corporation, and all other groups who seek to influence the governmental decision of a Board member or District personnel after advertisement of the RFP and prior to the posted Recommendation on the Award of the Contract. Lobbying on behalf of proposer during the time specified herein will result in rejection/disqualification of said Proposal.
POSTING OF PROPOSAL RECOMMENDATIONS/TABULATIONS
Recommendations and tabulations will be posted electronically with BidNet Direct for review by interested parties, no later than August 28, 2026, and will remain posted for a period of 72 hours.
If the RFP Tabulation with Recommended Awards is not posted by said date, a "Notice of Delay of
Posting" will be posted to inform all proposers of the new posting date.
PROTEST
Any Proposer who is adversely affected by the Recommended Award may file a Protest within the time prescribed in section 120.57 (3), Florida Statutes. Failure to post bond with the Board or to adhere strictly to the requirements of Statutes and State Board of Education rules pertaining to protests will result in summary dismissal by the Purchasing Department. Additionally, any proposer who is adversely affected by the Recommended Award may address the Board at a regularly scheduled Board meeting. Failure to file a notice of protest or to file a formal written protest within the time prescribed in section 120.57 (3), Florida Statutes, shall constitute a waiver of proceedings under chapter 120, Florida Statutes.
BY: Karen M. Brill, Board Chair ATTEST: Michael J. Burke, Superintendent
PUBLISH DATES: July 6, July 13 and July 20, 2026
END OF SECTION
8 Revised 2.26.2026
SECTION 00050
NOTICE TO CONTRACTORS
SMALL BUSINESS ENTERPRISE (SBE)
A Small Business Enterprise (SBE) Contract Goal has been established for this Project. Only firms
Certified by the School Board of Palm Beach County are eligible for participation to satisfy the established Participation Requirement.
Proposers and Subconsultants seeking to qualify as a Small Business Enterprise (SBE) shall be certified by the School Board of Palm Beach County, prior to the Proposal Due Date Specified in
Section 00030 of this Request for Proposal.
CERTIFICATION APPLICATION INSTRUCTIONS
Firms seeking to apply for certification with the School Board of Palm Beach County shall submit the School Board of Palm Beach County application. The application must be approved by the School
Board of Palm Beach County Office of Small Business Development. The Office of Small Business
Development will review the Certification Database to ensure SBEs are Certified with the District at the time the Bid is submitted. Vendors do not have to submit their Certification Certificate.
IMPORTANT POINTS TO REMEMBER
1) The application must be submitted complete with all required supporting documentation and the firm must allow sufficient time for the application to be processed prior to the Proposal
Due Date. The application may take up to 60 days after receipt of the completed application for processing.
2) Please contact the Office of Small Business Development for the application or information on certification at https://www.palmbeachschools.org/departments/small-business-development, or by phone at (561) 681-2403 or write:
THE SCHOOL BOARD OF PALM BEACH COUNTY
Office of Small Business Development
3300 Summit Boulevard
West Palm Beach, Florida 33406
3) Complete the online School District SBE application.
(https://www.palmbeachschools.org/departments/small-business-development)
4) Complete the SBE Affidavit.
9 Revised 2.26.2026
SECTION 00100
INSTRUCTIONS TO PROPOSERS
ARTICLE 1
SCOPE
1.1 The purpose and intent of The School Board of Palm Beach County Request for Proposal (RFP) is to solicit Proposals from qualified firms for securing Construction Management at Risk
Services for the FACILITY REMODEL AT HISTORIC CARVER TECHNICAL EDUCATION
CENTER.
1.2 All respondents are encouraged to submit Proposals that meet or exceed the Specifications, Terms and Conditions as stated herein.
1.3 The Scope of services will be as defined in the Contract Documents between OWNER and
CONSTRUCTION MANAGER.
1.4 Construction Management at Risk Services will, as part of their basic services, be required to administer a Direct Material Purchase Program as outlined by the OWNER in Appendix B. All expense incurred to administer this Program will be the responsibility of the CONSTRUCTION
MANAGER. A copy of this plan is available at the request of the Proposer from the
Construction-Purchasing Department.
ARTICLE 2
NEGOTIATION AND AWARD OF CONTRACTS
2.1 The Proposer meeting Specifications, Terms, and Conditions of this Proposal and being designated as the Top Ranked Proposer shall enter into Contract negotiations.
Recommendation for negotiation will be made based upon the process specified in Section
00600, Article 5, EVALUATION provided the Proposal is reasonable, meets the criterion specified herein and is in the best interest of the OWNER to accept the Proposal.
2.2 To be eligible for Contract Award, the Top Ranked Proposer shall be prequalified by the Board pursuant to SREF 4.1 at the time of Contract Award.
2.3 It is the intent of the OWNER to select one Top Ranked Proposer and Award a separate
Contract for each Project identified in the Project Notification to the Top Ranked Proposer.
Final Terms and Conditions of each Contract will be negotiated with the Top Ranked Proposer.
The Scope of Work specified in Article 2 of the Contract may be amended based on final negotiations. If no agreement is reached, negotiations may be terminated and the OWNER may conduct negotiations with the next ranked Proposer. The same process may be used until a successful negotiation is completed.
2.4 A Preconstruction Phase Fee and Reimbursable Expenses shall be negotiated for each Contract
Award.
2.5 The School Board of Palm Beach County reserves the right to reject any or all offers or to accept any offers which are in its best interest. The School Board also reserves the right to waive any informalities, irregularities and technicalities in procedure.
10 Revised 2.26.2026
2.6 Prior to Award, The School Board of Palm Beach County reserves the right to require a
Proposer to submit such evidence of qualifications and any current or updated information that was requested in the RFP as it may deem necessary, and may consider any information available to it of the financial, technical, and other qualifications and abilities of a Proposer, including past performance with other governmental/educational agencies. Proposers are advised that requests for additional information or Site visitations are not to be construed as an indication that a Proposer will receive or is in the best position to receive an Award.
2.7 The School Board reserves the right to cancel the Award, or portions thereof, without penalty at any time.
2.8 All negotiations will follow the requirements of Florida Statutes, and will be conducted with the highest ethical standards, fairness and equity. All negotiation meetings with vendors must be recorded and conform to the Public Records Requirements of applicable laws.
ARTICLE 3
TIME SCHEDULE
3.1 The School Board will use the following Time Schedule subject to change if necessary.
QUESTIONS DUE*: July 27, 2026 NO LATER THAN 2:00 P.M., EDT via BidNet Direct @ www.bidnetdirect.com
FINAL ADDENDUM ISSUED: August 3, 2026 via BidNet Direct @ www.bidnetdirect.com
PROPOSALS DUE: August 10, 2026 NO LATER THAN 2:00 P.M., EDT via BidNet Direct @ www.bidnetdirect.com
SELECTION COMMITTEE MEETING**: August 25, 2026 AT 9:00 A.M., EDT
SCHEDULED AWARD OF CONTRACT: November, 2026
*Only questions received via BidNet Direct @ www.bidnetdirect.com by the time and date specified will be answered by Addendum and only those responses issued by Addenda through BidSync will be binding. All Addenda will be posted on BidNet Direct @ www.bidnetdirect.com.
Branden Brown is authorized only to direct the attention of prospective proposers to various portions of the RFP so they may read and interpret such for themselves. Neither Branden Brown nor any employee of the District is authorized to interpret any portion of this RFP or give information as to the requirements of the RFP in addition to that contained in the written document.
All questions submitted (along with their source) are subject to Public Records Law and as such will be available for inspection upon receipt of a Public Records Request. There shall be no communication between selection committee members or their staff and the Proposers.
**Selection Committee Meetings are open to public attendance located at:
Lincoln Elementary School
1st Floor Media Center
1160 Avenue North Riviera Beach, FL 33404
NOTE: Proposers are requested to have a representative present at the Selection
Committee Meeting to respond to questions the Committee may have regarding the contents of their Proposal.
11 Revised 2.26.2026
ARTICLE 4
INSTRUCTIONS FOR PROPOSAL
4.1 Proposals shall be prepared in accordance with these Instructions to Proposers. Proposals not conforming to the instructions provided herein may be subject to disqualification at the option of the OWNER. It is necessary for the Proposer to carefully consider each item specified in this
Request for Proposal and insure each item meets the Requirements and Specifications as indicated. Proposal modification will not be accepted from Proposers.
4.2 The Proposer acknowledges the right of the OWNER to reject any or all Proposals and to waive any informality or irregularity in any Proposal received. In addition, the Proposer recognizes the right of the OWNER to reject a Proposal if the Proposer failed to furnish any required
Proposal security, or to submit the data required by the Proposal Documents, or if the Proposal is in any way incomplete or irregular; to reject the Proposal of a Proposer who is not in a position to perform the Contract; and to re-advertise for other or further Proposals or to accept the next responsive Proposal.
As required by 1010.04(5), Fla. Stat., please be advised that the School District will not:
1. Request documentation of or consider a bidder’s social, political, or ideological interests when evaluating its proposal.
2. Give preference to a bidder based on the bidder’s social, political, or ideological interests.
4.3 The Proposer meeting Specifications, Terms and Conditions and being designated as having submitted an approved Proposal shall be a Florida Licensed General Contractor and be authorized to perform services in the city of their domicile and in Palm Beach County. The
Proposer shall provide proof, in the form of licenses and certificates in their proposal.
4.4 Each Proposer, by submitting a Proposal, represents they have read and understand the
Request for Proposal document.
4.5 Proposals shall be prepared using the forms contained in this RFP and submitted in accordance with these Instructions to Proposers. Each Proposer shall use the forms contained in this RFP where indicated. Proposals containing any conditions, omissions, alternates, items not called for or irregularities of any kind may be rejected by the OWNER.
4.6 The Proposer certifies by submission of their Proposal, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from participation in this transaction by the State of Florida or Federal Government.
Further, proposer certifies that it has divulged, in its RFP response, information regarding any of these actions or proposed actions with other governmental agencies.
4.7 Successful Proposer will be required to comply with applicable law as it relates to E-Verify legislation.
4.8 A person or affiliate who has been placed on the Convicted Vendor List following a conviction for a Public Entity Crime may not submit a RFP on a Contract to provide any goods or services to a public entity, may not submit a RFP on a Contract with a public entity for the construction or repair of a public building or public work, may not submit RFPs on leases of real property to a public entity, may not be awarded or perform work as a Contractor, Supplier, 12 Revised 2.26.2026
Subcontractor, or Awarded Proposer(s) under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section
287.017, Florida Statutes, for CATEGORY TWO for a period of 36 months from the date of being placed on the Convicted Vendor List.
4.9 A Contract Awarded Proposer(s) or any Subcontractors shall not employ any person with multiple felonies and/or crimes against children. The Contract Awarded Proposer(s) must provide documented proof of efforts to comply with this requirement. The Board may declare any non-compliance or lack of diligent effort by the Contract Awarded Proposer(s) to comply as a breach of Contract and immediately terminate the services of the Contract Awarded
Proposer(s).
4.10 The Proposer, in submitting their Proposal, realizes that time is of the essence and that any delay of this Project will have a serious negative impact on the students of Palm Beach County.
Therefore, the Proposer has taken due diligence to determine factors that may impact the days necessary to complete this Project. Specifically, the approval process required under
Florida Statutes as governed by the Rules of the Department of Education, Florida State Board of Education, as well as the Permitting process required by the School District of Palm Beach
County, Department of Environmental Regulation, the South Florida Water Management
District, Palm Beach County and any other bodies that have jurisdiction over the land parcel for this Project.
4.11 Each Proposer, by submitting a Proposal, represents they have familiarized themselves with the local conditions under which the Work is to be performed. The Proposer is assumed to be familiar with all Federal, State and Local Laws, Ordinances, Rules and Regulations, that in any manner affect the Work. Public Contracting and Purchasing Process Florida Statutes, Sections
235.01 et seq. 287.132-.133 (Public Entity Crimes) is applicable and Florida Department of
Education, Office of Educational Facilities, Florida Building Code (FBC). Ignorance on the part of the Proposer will in no way relieve them from responsibility.
4.12 The Proposer shall have a place of business for contact by the School District during normal hours on normal working days. An emergency phone number and the name of a responsible managing employee of the successful proposer shall be provided to the School District.
4.13 A Proposal from a Joint Venture will be accepted for evaluation if the Joint Venture has been authorized by the Florida Dept. of State prior to Proposal. Additionally, one of the Joint Venture entities must be a business entity properly qualified by a Licensed Contractor. Finally, the
Joint Venture shall provide a properly executed statement of authority, signed by each participant of the Joint Venture, giving the Licensed General Contractor full authority to conduct the contracting business of the Joint Venture. A Joint Venture Proposal shall include the name and address of all parties included in the Joint Venture with one of the parties identified as the Prime Vendor. The Prime Vendor shall be financially responsible for the Joint
Venture providing Bonding and Insurance Requirements and execution of the Contract. The
Prime Vendor shall have overall and complete accountability to resolve any dispute arising from the Contract.
In the case of a Proposal submitted by a Joint Venture, a Joint Venture shall be in compliance with and meet all of the Terms, Conditions, and Criteria of this RFP, School Board Policy 6.144, and all other relevant School Board Policies.
A Joint Venture may be considered a certified SBE for purposes of the SBE Evaluation
Preference point award when the Joint Venture is SBE certified by the School District’s Office of Small Business Development (OSBD). The Joint Venture shall include in its Proposal submittal the SBE certification document of each SBE Joint Venture member.
13 Revised 2.26.2026
A Joint Venture shall not be awarded a Construction Management at Risk Contract unless that
Joint Venture is fully and properly licensed by the Florida Department of Business and
Professional Regulation, at the time of Proposal submittal.
4.14 All questions concerning the Request for Proposal shall be submitted via BidNet Direct @ www.bidnetdirect.com by the date and time specified and will be answered by Addendum.
All questions submitted shall be held until such time as they are compiled and answered in the form of an Addendum, which will be released through BidNet Direct @ www.bidnetdirect.com.
4.15 Questions and Answers, in the form of Addenda, as distributed by the OWNER shall become part of the Request for Proposal. An Addendum is a written or graphic instrument issued prior to the execution of the Contract Documents which modify or interpret the Proposal
Documents, including Drawings and Specifications, by additions, deletions, clarifications or corrections. All Addenda will become part of the Contract Documents when the Contract is executed. As necessary, Addenda will be distributed by BidNet Direct to all who are known by the Construction Purchasing Department to have received a complete set of Proposal
Documents. All questions submitted (along with their source) and Addenda are subject to
Public Records Law and as such will be available for inspection upon receipt of a Public Records
Request.
4.16 All Proposers must disclose the name of any officer, director, or agent who is also an employee of the District. All Proposers must disclose the name of any District employee who owns, directly or indirectly, any interest in the proposers' business or any of its branches. Indicate with either a statement of Conflict of Interest or Non-Conflict of Interest and submit with your
Proposal.
4.17 All Proposals must be submitted electronically to BidNet Direct @ www.bidnetdirect.com.
Hardcopy Proposals will not be accepted. A Proposal is invalid if it has not been fully uploaded to BidNet Direct @ www.bidnetdirect.com prior to the time and date for receipt of
Proposals specified in Article 3, Time Schedule or prior to any extension issued by addendum.
Proposals received after the stated time and date will not be considered.
4.18 BIDNET DIRECT:
1. All offers must be submitted electronically to BidNet Direct @ www.bidnetdirect.com including all required documents listed in the Proposal (or solicitation). No other responses will be accepted, including hard copy or emailed responses.
2. BidNet Direct supports online document tracking and completion. All documents must be viewed/accepted before the Proposal Packet can be viewed and an offer can be placed.
3. The District will only consider offers that have been uploaded and submitted through BidNet Direct @ www.bidnetdirect.com PRIOR to the Proposal closing date and time. As with any document upload, larger documents and/or heavy use activity may result in longer upload times. Please allow sufficient time to complete your offer.
4. IMPORTANT INFORMATION: For help filling out your offer, please visit:
https://www.bidnetdirect.com/palmbeachschools/
14 Revised 2.26.2026
• In order to complete this process, you must first select “Review Response,” verify the information is correct then enter your password and select “Confirm & Submit
Response.”
• After clicking “Confirm & Submit Response,” a confirmation page loads with “Offer
Received” at the top of the page. If you do not see this confirmation, your offer was not submitted successfully.
• If you select to receive a confirmation email indicating a successful response you will receive a confirmation email within five (5) minutes.
If you DO NOT receive a confirmation that your offer has been received, please call BidNet Direct at 800-835-4603, Option 2 (Vendor Assistance). Customer
Service Hours of Operation: 8 am – 8 pm.
5. If necessary, Addenda will be distributed by BidNet Direct to all who are known by the Construction Purchasing Department to have received a complete set of Proposal
Documents.
6. Be advised that registering with BidNet Direct @ www.bidnetdirect.com is a
FREE service.
7. Proposals must be signed electronically by an officer or employee having authority to legally bind the Proposer(s).
8. Proposers should become familiar with any local conditions which may, in any manner, affect the services required. The proposer(s) is/are required to carefully examine the
RFP Terms and become thoroughly familiar with any and all conditions and requirements that may in any manner affect the Work to be performed under the
Contract. No additional allowance will be made due to lack of knowledge of these conditions.
9. Proposals not conforming to the instructions provided herein will be subject to disqualification.
10. Any Proposal may be withdrawn prior to the date and time the Proposals are due.
4.19 Unless otherwise provided in any supplement to these Instructions to Proposers, no Proposer shall modify, withdraw or cancel his Proposal or any part thereof for 60 days after the time designated for the receipt of Proposals in the Project Notification for Request for Proposal.
4.20 Each Proposer shall use the forms contained in the RFP where indicated. Any erasures or other corrections in the Proposal shall be explained or noted over the signature of the
Proposer. Proposals containing any conditions, omissions, unexplained erasures, alternates, items not called for or irregularities of any kind may be rejected by the OWNER.
4.21 Each Proposal shall provide, on the required document, the full business address of the
Proposer, and state whether he is an individual, corporation or partnership. Proposals by a corporation must be signed with the legal name of the corporation followed by the name of the state of its incorporation and by the manual signature and designation of an Officer, Owner, or other person, authorized to bind the corporation. Proposals by partnerships shall show the names of all partners and shall be signed in the partnership name by one of the partners or by an Authorized Representative. In either case, the partnership signature shall
15 Revised 2.26.2026 be followed by the manual signature and designation of the person signing. ANY POTENTIAL, PERCEIVED OR ACTUAL CONFLICT OF INTEREST SHALL BE GOVERNED BY FLORIDA LAW.
4.22 In every case, the name of the person signing, and his designation, shall be typed or printed below his signature. A Proposal by a person who affixes to his signature the word "President", "Secretary", "Owner" or other designation without disclosing his principal may be held to be the Proposer of the individual so signing. Satisfactory evidence of the authority of an Officer, Owner, Attorney, or other person signing for a corporation and for an Owner, Attorney, etc., signing for a partnership or an individual shall be furnished.
4.23 Following submittal of the Proposal, a Proposer may not add or substitute Project Team
Members, including Major Subconsultants, without written approval from the Construction
Purchasing Department. Requests shall be made in writing to the Purchasing Agent in charge of the procurement process for that solicitation. All requests shall be submitted by the individual responsible for the authorization of the Proposal Response (Required Response
Form A). Other than an emergency situation, the request shall be submitted not less than five (5) OWNER business days prior to the published date of the Evaluation Meeting, otherwise the request shall not be allowed. The request shall identify the Project Name, RFP Number, reason for the request and resume of each Team Member requested for substitution. The resume shall include the same information as that specified in the Phase I Evaluation Criteria of the RFP for Project Team Members. The request shall be reviewed and responded to in writing by the Construction Purchasing Department advising the Proposer if their request for substitution is approved.
4.24 WITHDRAWAL OF PROPOSALS
Proposals may be withdrawn on written request received from the Proposers prior to the time fixed for opening. Such request shall be properly signed in accordance with the requirements pertaining to signatures contained in Paragraph 4.21 above. Negligence on the part of the
Proposer in preparing the Proposal confers no right for withdrawal of the Proposal after it has been opened.
4.25 INSTRUCTIONS FOR SUBMITTAL OF PROPOSAL DOCUMENTS
The Proposal shall be divided into three (3) Sections 1, 2 and 3 and uploaded to BidNet Direct
@ www.bidnetdirect.com as one (1) optimized PDF file. A Proposal shall include all items listed for Section 1, otherwise the Proposal shall be declared non-responsive.
A Proposal should include all items specified for Sections 2 and 3; however, exclusion of any of the items specified in Section 2 and 3 shall not be cause to declare the Proposal non-responsive.
SECTION 1: - shall contain the following items:
1. Proposal Response Form (Required Response Form A)
2. Disclosure of Discrimination Complaints Statement (Required Response Form B)
3. SBE Subconsultant/Subcontractor Participation Form (Required Response Form C)
SECTION 2: - submit the following items with Proposal:
1. Business Tax Certificate or Receipt as evidence of business location in Palm Beach, Broward or Miami-Dade Counties (see Evaluation Criteria)
16 Revised 2.26.2026
2. Copy of the Proposer’s Certified General Contractor’s (CGC) License, issued by the
Florida Department of Business and Professional Regulations.
3. Proof of an active Certificate of Authority issued by the Florida Department of State which authorizes the Proposer to transact business in the State of Florida. This proof may be provided by either submitting a copy of the Letter of Authority issued by the
Office of the Secretary of State or by submitting a copy of the Certificate of Status
Verification which may be obtained via www.Sunbiz.org - Department of State.
4. Letter of Bonding Capability, issued by the Proposer’s Surety. The Letter shall verify the Surety’s rating as specified in Section 00510 as well as the Proposer’s aggregate, single project and current available Bonding Capacity. The Surety must verify the
Proposer’s ability to provide required Bonding for each Contract Award otherwise the
Proposal may be rejected.
5. Certificate of Insurance indicating the coverage required in Section 00510.
6. Drug Free Workplace Certification (Attachment I)
7. Scrutinized Companies List Certification (Attachment J)
8. Beneficial Interest and Disclosure of Ownership Affidavit, PBSD 1997 (Attachment L)
The School District is requesting this affidavit to include a list of every
“person” (as defined in Section 1.01 (3), Florida Statutes, to include individuals, children, firms, syndicates, fiduciaries, corporations and all other groups and combinations) holding five percent (5%) or more of the Beneficial
Interest in the disclosing entity. The Proposer must submit all supporting documentation in the name of the Proposer’s entity only. Parent and/or subsidiary entities will not be acceptable.
9. Byrd Anti-Lobbying Amendment (Attachment X)
SECTION 3: - Responses:
1. Responses to Section 00600, Article 5 – Evaluation Process.
2. Section 3 of the Proposal shall not exceed a total of forty (40) pages otherwise the Proposal shall be deemed non-responsive. Each page of Section 3 shall be numbered consecutively and shall not exceed 8 ½” x 11” in size. Each text page shall be printed in font 11 or larger and have a minimum 1” margin. The Proposer should only provide responses to the Evaluation Process Criteria specified in Categories 1-4 in
Section 00300 - “Evaluation Process.” The response provided for each Category should be bookmarked separately.
ARTICLE 5
PROTEST PROCEDURES
5.1 The OWNER shall provide notice of its decision or intended decision concerning a Request for
Proposal or an Award as follows:
• Notice of a decision or intended decision shall be given by posting the Tabulation on
BidNet Direct @ www.bidnetdirect.com.
17 Revised 2.26.2026
• The notice required by this paragraph shall contain the following statement: “Failure to file a protest within the time prescribed in 120.57(5)(b), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.”
5.2 Any party who is adversely affected with respect to the Proposal Documents shall file a notice of protest in writing within 72 hours after the receipt of the Proposal Documents, and SHALL
FILE A FORMAL WRITTEN PROTEST WITHIN 10 DAYS AFTER FILING THE NOTICE OF PROTEST.
Failure to file a notice of protest or failure to file a formal written protest shall constitute a waiver of proceedings under F.S. Chapter 120.
All Notices of Protest and Formal Written Protests shall be submitted to:
Darci Garbacz, Director of Purchasing
School Board of Palm Beach County
3300 Forest Hill Blvd., Suite A-323
West Palm Beach, FL 33406
5.3 As stated in F.S. 255.0516, at time of filing the formal written protest, a Bond, conditioned upon payment of all costs and fees which may be adjudged against the Protestor, must be secured and made payable to the District in an amount equal to $5,000 or one percent (1%) of the lowest accepted Bid, whichever is greater, for projects valued over $500,000; and five percent (5%) of the estimated cost of construction for all other projects.
5.4 Upon receipt of the Bond and notice of protest which has been timely filed, the OWNER will stop the Proposal Solicitation process or the Contract Award Process until the subject of the protest is resolved by final OWNER action, unless the OWNER sets forth in writing particular facts and circumstances which require the continuance of the Proposal Solicitation Process or the Contract Award Process without delay in order to avoid an immediate and serious danger to the public health, safety, or welfare.
5.5 The OWNER, on its own initiative or upon the request of a protestor will provide an opportunity to resolve the protest by mutual agreement between the parties within seven (7) days
(excluding Saturdays, Sundays and State holidays) of receipt of a formal written protest.
5.6 If the subject of a protest is not resolved by mutual agreement and if there is no disputed issue of material fact, an informal proceeding shall be conducted pursuant to s. 120.57(3). If the hearing is not requested in the Notice of Proposal Protest, it shall be waived. The informal hearing shall be conducted in the presence of the Director of the Purchasing Department as the Superintendent's designee, the legal staff, and any other witnesses deemed appropriate.
The protesting party may be present with assistance of counsel and any witnesses he deems appropriate; however, failure to have counsel or witnesses present shall not invalidate the hearing.
ARTICLE 6
LOBBYING
6.1 Lobbying is defined as any action taken by an individual, firm, association, partnership, Joint
Venture, syndicate, corporation, and all other groups who, after advertisement of the RFP and prior to the posted Recommendation on Award of Contract, seek to influence the decision of a Board member or District personnel on the Award of a Contract.
18 Revised 2.26.2026
6.2 Proposers and their employees or individuals acting on behalf of the Proposer are hereby advised that Lobbying is not permitted with any School District employee, School Board members, School District Advisory Committee member, Evaluation Committee member or other person related to or involved with this RFP until the Recommendation for Award has been posted. Violation shall result in rejection of the Proposal and disqualification of the
Proposer from consideration for Award.
6.3 Any proposer who is adversely affected by the Recommended Award may address the School
Board at a regularly scheduled Board meeting.
6.4 Any proposer or any individuals that lobby on behalf of proposer during the time specified will result in rejection/disqualification of said Proposal.
6.5 All issues and or questions regarding a Project need to be addressed and resolved through the
Construction Purchasing Department. There shall be no communication between Committee
Members, their staff and the prospective Proposers. Committee Members will not be allowed to meet separately and discuss the Project. All oral or written inquiries must be directed through the Construction – Purchasing Department.
6.6 Any Proposer that is adversely affected by the Recommended Award may address the School
Board at a regularly scheduled Board meeting.
19 Revised 2.26.2026
SECTION 00700
GENERAL CONDITIONS
INDEX
ARTICLE 1 GENERAL PROVISIONS
1.1 Execution, Correlation and Intent
1.2 Successor and Assigns - Assignability Clause
1.3 Rights and Remedies
1.4 The Specifications
1.5 The Project Manual
1.6 Ownership and Use of Architect’s Drawings, Specifications and Other Documents
1.7 Tests and Inspections
1.8 Capitalization
1.9 Interpretation
1.10 Commencement of Statutory Limitation Period
1.11 School Board Meetings
1.12 Possession of Firearms
ARTICLE 2 OWNER
2.1 Information and Services Required of the OWNER
2.2 OWNER’S Right to Stop the Work
2.3 Default/Neglect/Failure to Complete the Work
ARTICLE 3 CONSTRUCTION MANAGER
3.1 Review of Contract Documents and Field Conditions by CONSTRUCTION MANAGER
3.2 Project Manager and Superintendent
3.3 Labor and Materials
3.4 Warranty
3.5 Taxes
3.6 Direct Material Purchase Program
3.7 CONSTRUCTION MANAGER’S Construction Schedules
3.8 Shop Drawings, Product Data and Samples
3.9 Cutting and Patching
3.10 Cleaning Up
3.11 Disclosure of Project Information
ARTICLE 4 CONTRACT ADMINISTRATION
4.1 Definitions
4.2 Architect’s Administration of the Contract
4.3 Communications Facilitating Contract Administration
4.4 Claims and Disputes
4.5 Claims for Additional Time
4.6 Adverse Weather Conditions
4.7 Injury or Damage to Person or Property
4.8 Resolution of Claims and Disputes
20 Revised 2.26.2026
ARTICLE 5 SUBCONTRACTORS
5.1 Definitions
5.2 Subcontractor Approval
ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
6.1 Mutual Responsibility
6.2 OWNER’S Right to Clean Up
ARTICLE 7 CHANGES IN THE WORK
7.1 Changes
7.2 Change Orders
7.3 Construction Change Directives
7.4 Claim and Additional Cost or Time
7.5 Minor Changes in the Project
7.6 Emergencies
7.7 Concealed Conditions
ARTICLE 8 TIME
8.1 Definitions
8.2 Progress and Completion
ARTICLE 9 PAYMENT AND COMPLETION
9.1 Schedule of Values
9.2 Certificates for Payment
9.3 Decisions to Withhold Application and Certificate of Payment
9.4 Prompt Payment to Subcontractors, Materialmen and Suppliers
9.5 Progress Payment
9.6 Failure of Payment
9.7 Substantial Completion
9.8 Partial Occupancy or Use
9.9 Final Completion and Final Payment
ARTICLE 10 UNCOVERING AND CORRECTION OF WORK
10.1 Uncovering of Work
10.2 Correction of Work
10.3 Acceptance of Nonconforming Work
21 Revised 2.26.2026
SECTION 00700
GENERAL CONDITIONS
ARTICLE 1
1.1 EXECUTION, CORRELATION AND INTENT
The Contract Documents shall be signed by the OWNER and CONSTRUCTION MANAGER. If either the OWNER or CONSTRUCTION MANAGER or both do not sign all the Contract
Documents, the Architect shall identify such unsigned Documents upon request of either party.
Execution of the Contract is a representation the CONSTRUCTION MANAGER has carefully examined the Contract Documents and the Site, and represents the CONSTRUCTION
MANAGER is thoroughly familiar with the nature and location of the Work, the Site, the specific conditions under which the Work is to be performed, and all matters which may in any way affect the Work or its performance. The CONSTRUCTION MANAGER further represents that, as a result of such examinations and investigations, the CONSTRUCTION MANAGER thoroughly understands the Contract Documents and their intent and purpose, and is familiar with all applicable codes, ordinances, laws, regulations and rules as they apply to the Work, and the
CONSTRUCTION MANAGER will abide by same. Claims for additional time or additional compensation as a result of the CONSTRUCTION MANAGER’S failure to follow the foregoing procedure and to familiarize itself with all local conditions and the Contract Documents will not be permitted.
The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the CONSTRUCTION MANAGER. Contract Documents are complimentary, and what is required by any one shall be as binding as if required by all;
performance by the CONSTRUCTION MANAGER shall be required only to the extent consistent with the Contract Documents and reasonable inferable from them as being necessary to produce the intended results.
In the event of conflicting provisions in the Specifications or the Drawings, the more specific…
This is the start of the file's text. The full file is on GovTribe.