About this opportunity
The City of Millbrae, California Department of Public Works is requesting bids for the Central Millbrae Stormwater & Utility Improvements Project on Laurel Avenue and Green Hills Drive (Invitation #SS2605), with bids due September 11, 2026 at 2:00 p.m. PDT. The Q&A period closes September 4, 2026; no pre-bid meeting is scheduled.
The scope includes removal and replacement of existing storm drains and installation of new storm drains in 18-inch and 24-inch sizes using trench and open cut construction methods; storm drain manhole and inlet installations; pavement trench repairs; potholing; PCC curb, gutter, and sidewalk removal and replacement; incidental striping and markers removal and replacement; and traffic control. All work is performed per the project plans.
Bids must be submitted electronically through the City's PlanetBids portal and include line items, full bid proposal, bid schedule, statement of experience and qualifications, non-collusion declaration, list of subcontractors, and proof of contractor registration with the California Department of Industrial Relations (DIR). The award is on a lump-sum basis. Performance bond (100 percent), payment bond (100 percent), and bid bond (10 percent) are required.
Firms must be registered in the PlanetBids Bidder's List prior to proposal submission. Contract documents are available through the portal. Inquiries should be directed to Armando Mora, City of Millbrae Public Works Department, 621 Magnolia Avenue, Millbrae, California 94030, 650-259-2393, or amora@ci.millbrae.ca.us.
Opportunity text
In general, the work to be performed consists of but is not limited to, the removal and replacement of existing storm drains and installation of new storm drains in sizes 18-inch and 24-inch, using trench and open cut construction methods, storm drain manhole installations, pavement trench repairs, potholing, PCC curb, gutter, sidewalk removal and replacement, storm drain inlet replacement and new construction, incidental striping/markers removal & replacement, traffic control, mobilization, and all other work as shown on the Plans