Centennial Field 5 Renovation

Closed State & local contract opportunity Posted

Solicitation number
2026-051
State
Colorado
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Loveland, Colorado is requesting proposals for infield renovation services at Centennial Field #5, with proposals due August 13, 2026 at 2:00 p.m. MT and mandatory pre-submittal meeting attendance required on August 3, 2026 at 10:00 a.m. MT at Centennial Park.

The scope involves removing existing infield material to a depth of six inches in grass areas and two inches in infield material areas; adding new gold infield mix with stabilizer field conditioner; packing and laser grading the material; removing and replacing irrigation heads along the infield/outfield lip; and preparing the lip area for seeding. The City will supply base anchors, bases, home plate, pitching rubber(s), and seed. Proposals must be submitted on a unit price basis with a not-to-exceed total price and must include detailed cost breakdowns covering installation, a two-year warranty period, full warranty and post-warranty maintenance, travel expenses, reimbursable costs with markup, and current rate sheets for supervisory labor, general labor, and equipment.

Evaluation criteria are scope understanding (10 points), assigned project team qualifications (15 points), firm experience with similar projects (15 points), firm capability including personnel and equipment (10 points), construction performance history (10 points), proposal completeness (5 points), and cost competitiveness (15 points). Reference checks will be conducted on the top-ranked proposer. The City reserves the right to reject any or all proposals and makes no guarantee regarding the amount of work to be awarded. Questions are due August 6, 2026 at 5:00 p.m. MT, with responses provided by August 7. Award is anticipated the week of August 17, 2026. Electronic submission is required through BidNet Direct.

Opportunity text

From the backstop behind home plate to the lip of the outfield, the existing infield material including the grass is to be removed to a depth of 6 inches in grass areas and 2 inches in infield material areas. New material is to be added, packed, and laser graded. The grass that is currently defining the infield/outfield lip will be removed and the area will be prepped for seed to create a distinct line between infield and outfield. The irrigation heads that are currently along the lip area will be removed before removal of material, then replaced when new material has been added.

Files

File Type Posted
biddoc.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity