The City of Milton, Florida has issued Invitation to Bid (ITB) 2025.02 for the Cedar Ridge Sanitary Sewer Repairs project, seeking construction contractors to repair single service lines within the Cedar Ridge Subdivision in Santa Rosa County. The procurement targets comprehensive sanitary sewer infrastructure improvements, including repairs to approximately 55 sewer lateral segments across multiple streets such as Cedar Ridge Circle, Herlong Drive, Hanover Court, and Midridge Court. Required deliverables include complete site work involving demolition, earthwork, utilities, excavation, asphalt removal, sewer line repairs, utility reconnections, and site restoration. Bids are due on Wednesday, March 12, 2025, at 2:00 p.m. CST, with a strict 90-day contract completion timeline and liquidated damages of $100 per day for substantial completion delays. Each bid must include a 5% bid bond and bidders must guarantee their proposal for 90 days after opening. Contractors must comply with OSHA trench safety standards for excavations deeper than five feet and demonstrate technical capability to execute precise sewer lateral repair procedures involving PVC knock-on repair couplings and comprehensive site restoration techniques. The solicitation does not explicitly indicate specific set-aside designations or restrictions for disadvantaged enterprises. Bidders are required to provide comprehensive insurance documentation, including commercial general liability, automobile liability, and workers' compensation coverage with specified minimum limits. An alternate bid option is available for milling and repaving the entire subdivision, providing contractors flexibility in proposal submission. While specific budget ranges are not detailed, the project involves significant infrastructure rehabilitation with potential complexity warranting substantial investment. The construction plans, prepared by KHA Civil Engineers, Inc. in September 2024, suggest a technically sophisticated project requiring specialized municipal infrastructure repair expertise. Contractors will need to demonstrate precise technical capabilities in utility infrastructure restoration, erosion control implementation, and adherence to municipal engineering standards. The project appears funded by the City of Milton and represents a strategic investment in maintaining and improving local sanitary sewer infrastructure within the Cedar Ridge Subdivision.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
ITB_2025-02_Cedar_Ridge_Sanitary_Sewer_Repairs_-_Plans.pdf | 3MB | 2/13/25 | ||
ITB-20-25-02_Cedar_Ridge_Sanitary_Sewer_Repairs_-_Main_Document.pdf | 377KB | 2/7/25 |