The City of Milton is seeking bids for the ITB 2025.06 Russell Harber Dock Replacement project, located in Santa Rosa County, Florida. This Invitation to Bid (ITB) is a comprehensive dock repair and replacement initiative funded through FEMA (Project No. 160536) following Hurricane Sally damage. The project specifically involves removing and replacing two dock sections at Russell Harber Park, including the installation of six new 50-foot composite piles, a 6.5-foot wide by 60-foot long floating dock, and 10 aluminum cleats. Key deliverables include selective site demolition, erosion and sediment control, geotextile layer separation, stone placement, and floating dock replacement using Tangent SeaPile 13SP8F08 composite piles and GatorDock aluminum dock sections. The bid documentation requires contractors to follow detailed technical specifications, ensure public safety, and thoroughly restore work areas. The bid is due on June 4, 2025, with the solicitation posted on May 1, 2025, and contractors must submit comprehensive in-place costs covering materials, labor, equipment, insurance, bonds, permits, and associated taxes. While no specific set-aside designations or restrictions for disadvantaged enterprises are explicitly mentioned in the documentation, the project appears to be open to qualified contractors capable of meeting the complex technical specifications. The estimated project budget is not directly stated, but the comprehensive nature of the dock replacement suggests a significant investment in infrastructure restoration. No incumbent vendors are identified in the provided documents. The project requires integration with existing dock infrastructure, specifically utilizing existing pile connections and matching the current GatorDock aluminum dock design. Contractors will need to demonstrate expertise in marine construction, erosion control, and FEMA-funded project implementation. The technical specifications prepared by AMI Consulting Engineers, P.A. indicate a preference for contractors with specialized experience in coastal dock reconstruction, environmental compliance, and precise engineering execution. The project's FEMA funding and detailed technical requirements suggest a competitive bidding process that will prioritize technical capability, safety standards, and comprehensive project understanding.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
ITB 2025.06 - (B) Russell Harber Dock - Planset.pdf | 17MB | 5/1/25 | ||
ITB 2025.06 - (C) Russell Harber Dock - Bid Form.pdf | 20KB | 5/1/25 | ||
ITB 2025.06 - (A) Russell Harber Dock - AMI Specifications.pdf | 1MB | 5/1/25 | ||
ITB 2025.06 Russell Harber Dock Replacement.pdf | 45MB | 5/1/25 |