Building Construction & Renovation
- Mattawan Consolidated Schools is requesting sealed bids for an Early Site Package construction project encompassing tennis courts, field events facilities, and a berm at its Mattawan, Michigan campus, with bids due June 30, 2026 at 3:00 p.m. EST. This is prevailing wage work under Michigan's prevailing wage requirements at Van Buren County rates, which is mandatory for all contractors. The scope spans seven trade divisions: Electrical (26.100), Sitework (31.100), Asphalt & Paving (32.120),...
- Watervliet Public Schools (Michigan) is soliciting bids on Bid Package #201 for the Watervliet MS WAY Addition construction project, with bids due June 30, 2026 at 2:00 p.m. at 450 E. St. Joseph Street, Watervliet, Michigan. This procurement is subject to the State of Michigan Prevailing Wage Act (Public Act 10 of 2023), requiring all proposals to be based on prevailing wage rates — a decision-filtering constraint. All contractors and subcontractors must register annually with the Michigan...
- Beal City Public Schools is requesting sealed bids for Bid Pack No. 4 – Series 2 Summer 2027 Renovations at Beal City High School in Mount Pleasant, Michigan, with bids due July 1, 2026 at 11:00 a.m. and a pre-bid meeting and project walk-through scheduled for June 19, 2026 at 11:00 a.m. The scope spans multiple bid divisions under separate prime contracts: concrete, masonry, metals, general trades, roofing, glass and glazing, drywall/insulation/acoustical work, flooring, painting, stage...
- Davison Community Schools (Genesee County, Michigan) is requesting sealed bids for summer renovations at Davison High School and Hahn Intermediate School, with bids due July 14, 2026 at 1:00 p.m. at the Davison Administration Office. No set-asides or preferences are stated. The scope includes selective demolition and installation of doors, frames, masonry, spray polyurethane foam insulation, joint sealants, hollow metal doors, aluminum framed entrances and storefronts, door hardware, glazing,...
- The State of Michigan is requesting proposals for an Early Site Package project in Van Buren County with a proposal due date of June 30, 2026. Addendum 1 was issued on June 23, 2026 and supersedes corresponding sections of the base RFP; bidders must acknowledge and incorporate the addendum or face proposal rejection. The Early Site Package encompasses site characterization, permitting support, engineering studies, and environmental assessments across multiple work packages and disciplinary...
Mattawan Consolidated School is soliciting sealed bids for Bid Package 3 of the MCS Middle School Additions & Renovations project, with bids due July 10, 2026 at 1:00 p.m. and a non-mandatory pre-bid walk scheduled for June 22, 2026. Michigan prevailing wage requirements apply to all trade classifications and apprenticeship levels on this State-funded project; prevailing wage rates by trade are posted separately and are mandatory regardless of union or non-union status. The project scope encompasses construction of an addition to the middle school office and renovations to offices and cafeteria at 56720 Murray Street, Mattawan, Michigan. Work is organized into multiple trade-specific bid categories: selective demolition, concrete, masonry, structural steel, general trades, metal panels, membrane roofing, overhead doors, aluminum and glass glazing, painting, drywall, insulation, ceilings, flooring, kitchen equipment, fire protection, plumbing, mechanical, electrical, technology, sitework, asphalt paving, fencing, and landscaping. Each work category must be bid in its entirety; partial submissions are not accepted. Combined proposals for multiple work categories are acceptable if each category is individually quoted. Construction commences August 31, 2026 and continues through March 31, 2028. Bidders must submit a bid bond of not less than 5% of the bid amount and a Performance Labor and Material Bond as part of the base bid. All proposals must remain firm for 30 days after submittal. Three mandatory alternates are identified: Entry Plaza, Emergency Generator, and New Ceilings and Lighting in Place of Existing. Bids must include Michigan Sales & Use Tax plus all applicable federal, state, and local taxes. Subcontractors without prior work history with AVB Construction must complete pre-qualification forms and provide current MiCHATS background checks for all field personnel prior to mobilization. All material and equipment deliveries must be coordinated with AVB and may be restricted to specific times. A minimum two-year warranty from certificate of occupancy is required unless otherwise specified. Bidders must comply with the Construction Manager's Health and Safety Program. Local participation is encouraged but not required for award consideration. Addendum 1 was released June 24, 2026; Addendum 2 is tentatively scheduled for July 2, 2026. Questions were due June 25, 2026. Bids will be publicly opened immediately following the 1:00 p.m. submission deadline.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
AVB Health Safety Program v30 08.29.2023.pdf | 8MB | 6/25/26 | ||
Builder's Sites Advertisement for Bids BP3 - MCS Addit & Renov.pdf | 126KB | 6/25/26 | ||
MCS BP3 MS Add & Ren - Addendum 1 - For Release.pdf | 16MB | 6/25/26 | ||
Prevailing Wage Rates - MCS Middle School Additions & Renovations.pdf | 280KB | 6/25/26 | ||
2. AVB 01 0000 Subcontractor Gen Req - BP3 MCS MS Addit & Renov.pdf | 5MB | 6/25/26 |