Bridge Repairs, Joint Reconstruction, HMA Overlay Pavement, Drainage Adjustments
Closed State & local contract opportunity Posted
- Solicitation number
- 80B49
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation is soliciting bids for bridge repairs, joint reconstruction, HMA overlay pavement, and drainage adjustments along IL Route 38 over the East Branch DuPage River in Glen Ellyn, DuPage County, with proposals due September 18, 2026.
The scope encompasses work on Bridge S.N. 022-0161 and the surrounding roadway over a gross and net length of 3,716 feet (0.70 miles). Bridge work includes deck scarification, latex concrete overlay, joint reconstruction, and patching. Roadway work includes butt joint installation, HMA overlay on approach pavements, concrete curb and gutter replacement, concrete median replacement, drainage structure adjustments, and pavement marking replacement. The attached ILDOT specification document (ILDOT 80B49-011.pdf) establishes technical requirements, contractor performance standards, insurance requirements, and payment terms; bidders should reference the complete solicitation for bid submission procedures and detailed performance specifications.
A pre-bid meeting date, questions-due date, estimated contract value, contract term, and evaluation criteria are not identified in the source materials.
Opportunity text
The project consists of bridge repairs (S.N. 022-0161) located along IL Route 38 over the East Branch DuPage River. The scope of work includes bridge deck scarification, latex concrete overlay, joint reconstruction, and patching. The roadway scope of work includes butt joints, HMA overlay of the approach pavement, concrete curb and gutter replacement, concrete median replacement, drainage structure adjustments, and pavement marking replacement. Location: The project is located along IL Route 38 (Roosevelt Road) over the East Branch DuPage River in the Village of Glen Ellyn in DuPage County, Illinois. The gross and net length of the project on IL Route 38 is 3,716 ft (0.70 miles).
Files
| File | Type | Posted |
|---|---|---|
| ILDOT 80B49-011.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity