- Texas Department of Transportation is soliciting bids for bridge maintenance on multiple sites throughout Harris County under State Let Construction Contract 0912-72-842, with bids due July 1, 2026. The contract is not a federal aid project and carries prevailing wage requirements. The scope encompasses concrete structure repairs, steel member repairs, bridge joint repairs, riprap installation, joint cleaning and sealing, mobilization, and traffic control across various highways in Harris...
- The Texas Department of Transportation is requesting sealed bids for bridge maintenance work in Jefferson County under project STP 2026(778)MM with control number 0920-00-159, with bids due July 1, 2026 at 1:00 PM EST. No DBE goal has been established for this project. The scope covers district-wide bridge maintenance activities across multiple Jefferson County locations. The contract allows 240 working days for completion. The estimated project cost is $4,638,268.80, and the required bid...
- The Texas Department of Transportation is requesting sealed bids for bridge maintenance and repair work on state-owned structures in Llano County, Texas under a state let construction contract, with bids due July 1, 2026. Bidders must comply with prevailing wage requirements, equal employment opportunity provisions, and all applicable state and federal regulations governing public works contracts. Performance bonds, payment bonds, and insurance are required as mandated by state law. The scope...
- The Texas Department of Transportation is requesting sealed bids for bridge preventative maintenance on Interstate 69 in Harris County under Control Number 6497-10-001, with bids due July 2, 2026 at 1:00 p.m. EST. No SBE goal is established for this contract. The project covers 0.01 miles of various highways in North Harris County and requires 238 working days to complete. The estimated project cost is $1,094,618.13 with a performance guaranty of $22,000.00. Bids must be submitted to TxDOT's...
- The Texas Department of Transportation, Tyler District, is requesting sealed bids for bridge preventative maintenance work in Anderson and Henderson counties along US Highway 287, with bids due July 21, 2026 at 10:00 a.m. No SBE goal has been established for this contract. The scope covers preventative maintenance on multiple bridges in the Tyler District, spanning 0.01 miles, with an estimated completion timeframe of 79 working days. The estimated project cost is $425,485.00, with a performance...
- The Texas Department of Transportation Beaumont District is requesting bids for metal beam guard fence repair on Interstate 10 in Jefferson County under a local let maintenance contract, with bids due July 21, 2026 at 11:00 a.m. No SBE goal applies to this contract. The work involves repair of metal beam guard fence spanning 0.01 miles at various locations on Interstate 10 in Jefferson County, with completion required within 365 calendar days. The estimated project cost is $665,155, and a...
- The Texas Department of Transportation is requesting bids for preventive maintenance work on Interstate 10 in Chambers County, with proposals due July 2, 2026 at 1:00 p.m. The DBE goal for this project is 0.0%. The scope covers preventive maintenance on Interstate 10 extending from the end of concrete State Highway 99 east limits to FM 565. The project is designated STP 2026(496)MM (Control Number 0508-02-140) and must be completed within 102 working days. The estimated project cost is...
- The Texas Department of Transportation Tyler District is requesting bids for bridge preventative maintenance work in Gregg County on Interstate Highway 20, with bids due July 21, 2026 at 10:00 a.m. No SBE goal applies to this contract. The scope is preventative maintenance services on various bridges within the Tyler District, spanning 0.01 miles, with a completion period of 114 working days. The estimated project cost is $628,992.00, and bidders must provide a guaranty of $13,000.00. Bids...
- Harris County, Texas is soliciting competitive sealed bids for bridge maintenance and repair work at multiple county locations, with proposals due July 1, 2026. Prevailing wage requirements under Texas prevailing wage standards apply to all work performed. The scope encompasses maintenance and repair activities on county bridges to ensure structural integrity and safe passage. Bidders must submit lump sum or unit price bids as specified in the bidding documents and comply with all applicable...
- The Texas Department of Transportation, Lufkin District 11, is requesting bids for bridge preventative maintenance work in Angelina County on US Highway 059 under Local Let Maintenance Contract 6499-94-001, with bids due July 22, 2026 at 9:30 a.m. No SBE goal is established for this contract. The scope covers preventative maintenance across 0.01 miles of various locations districtwide and must be completed within 40 working days. The work is identified by Project Number BPM - A00220542. The...
The Texas Department of Transportation (TxDOT) Beaumont District is soliciting bids on a statewide letting construction contract for Bridge Follow-Up Action maintenance work districtwide across Chambers, Hardin, Jasper, Jefferson, Liberty, Newton, Orange, and Tyler Counties, Texas, with a bid due date of July 1, 2026. The scope comprises 64 line items of bridge maintenance and repair at multiple locations within the district, including concrete removal, embankment work, specialized excavation, riprap installation, bridge deck overlays, guardrail and barrier repairs, pavement markings, and joint sealing. Work is to be completed within 240 working days. The project is a Federal-Aid project requiring Davis-Bacon wage compliance, E-Verify employment eligibility verification, and extensive federal nondiscrimination and equal opportunity provisions. A notarized Buy America Certification Form is required for all items classified as construction materials. Contractors must submit unit prices for each of the 64 bid items and provide a proposal guaranty of $93,000. Audited financial statements and experience questionnaires must be submitted at least ten days prior to the letting date. Work includes mandatory traffic management with portable changeable message signs, truck-mounted attenuators, and barricades; specialized traffic control restrictions apply on Interstate 10 structures, including nighttime work prohibitions and lane closure limitations during peak hours and holiday periods. Material storage under bridge structures is prohibited for flammable or combustible materials. The contractor assumes waste disposal and right-of-way maintenance responsibility during migratory bird nesting season (March 1 through September 30). A Regulatory Construction Speed Zone has been requested for this project. Contractors must acknowledge addenda and certify compliance with nondiscrimination, child support, conflict of interest, boycott restrictions, and foreign adversaries requirements.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
0920-00-159.pdf | 5MB | 6/25/26 |