- Harris County, Texas is soliciting competitive sealed bids for bridge maintenance and repair work at multiple county locations, with proposals due July 1, 2026. Prevailing wage requirements under Texas prevailing wage standards apply to all work performed. The scope encompasses maintenance and repair activities on county bridges to ensure structural integrity and safe passage. Bidders must submit lump sum or unit price bids as specified in the bidding documents and comply with all applicable...
- The Texas Department of Transportation (TxDOT) Beaumont District is soliciting bids on a statewide letting construction contract for Bridge Follow-Up Action maintenance work districtwide across Chambers, Hardin, Jasper, Jefferson, Liberty, Newton, Orange, and Tyler Counties, Texas, with a bid due date of July 1, 2026. The scope comprises 64 line items of bridge maintenance and repair at multiple locations within the district, including concrete removal, embankment work, specialized excavation,...
- The Texas Department of Transportation is requesting sealed bids for bridge preventative maintenance on Interstate 69 in Harris County under Control Number 6497-10-001, with bids due July 2, 2026 at 1:00 p.m. EST. No SBE goal is established for this contract. The project covers 0.01 miles of various highways in North Harris County and requires 238 working days to complete. The estimated project cost is $1,094,618.13 with a performance guaranty of $22,000.00. Bids must be submitted to TxDOT's...
- The Texas Department of Transportation is requesting sealed bids for bridge maintenance and repair work on state-owned structures in Llano County, Texas under a state let construction contract, with bids due July 1, 2026. Bidders must comply with prevailing wage requirements, equal employment opportunity provisions, and all applicable state and federal regulations governing public works contracts. Performance bonds, payment bonds, and insurance are required as mandated by state law. The scope...
- The Texas Department of Transportation is requesting bids on a State Let Construction Contract to rehabilitate FM 943 in Hardin County, spanning 8.308 miles from 2 miles south of the Polk County Line to FM 1003, with proposals due July 1, 2026. This is not a federal aid project. The scope includes full-depth base repair, dense-graded hot-mix asphalt (D-G HMA Type D) and stone-matrix asphalt (SMA-D) placement, flexible pavement structure repair, planing and texturing, drainage structure work with...
- The Texas Department of Transportation is soliciting bids for roadway rehabilitation in Hardin County under a state construction contract, with bids due July 1, 2026. The scope encompasses rehabilitation of an existing roadway to restore infrastructure to acceptable condition. Specific project quantities, timeline requirements, site visit schedules, bidder conference dates, contract award timelines, and project completion deadlines are contained in the referenced contract documents. The...
- The Texas Department of Transportation is requesting sealed bids for bridge maintenance work in Robertson County under Project Number F 2026(085), with bids due July 2, 2026 at 1:00 p.m. The DBE goal is 0.0%. Work includes maintenance on US 79, SH 6, FM 391, and FM 979, with activity also at the Union Pacific Railroad corridor and Brazos River. The project must be completed within 104 working days. Bids should be mailed or delivered to TxDOT at 6230 E Stassney Lane, Room MIC3.02, Austin, TX...
- The Texas Department of Transportation is soliciting bids for a State Let Construction Contract to reconstruct and widen roadways from two to four lanes with sidewalks, intersection improvements, and stormwater and culvert improvements on various locations in Tarrant County, Texas, with bids due July 1, 2026. This is a Federal Aid Project requiring a notarized Buy America Certification Form for all construction materials. The scope encompasses removal of existing concrete, excavation,...
Texas Department of Transportation is soliciting bids for bridge maintenance on multiple sites throughout Harris County under State Let Construction Contract 0912-72-842, with bids due July 1, 2026. The contract is not a federal aid project and carries prevailing wage requirements. The scope encompasses concrete structure repairs, steel member repairs, bridge joint repairs, riprap installation, joint cleaning and sealing, mobilization, and traffic control across various highways in Harris County. Night work and weekend work are required. The contract must be completed in 60 working days. Work includes 24 line items with quantities ranging from 0.2 cubic yards to 550 square feet, priced on a unit-cost basis by bidders. A proposal guaranty of $31,000 is required in the form of a cashier's check, teller's check, bank money order, or bid bond. Prevailing wage rates apply and vary by zone within Texas, effective January 2, 2026. The SBE participation goal is 0%. Bidders must submit an audited financial statement and experience questionnaire at least ten days prior to the letting date (by June 21, 2026; this deadline appears to have passed). Contractors must comply with E-Verify employment eligibility verification and certifications regarding boycotts of Israel and energy companies, discrimination against firearm entities, and foreign adversaries. Liquidated damages apply based on contract value. Contractors are responsible for obtaining necessary permits and licenses and maintaining roadway slope stability and environmental compliance. Traffic control is extensive, with lane closure restrictions and law enforcement assistance requirements. Additional daily lane closure assessment fees are $500 per lane per hour during restricted hours.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
0912-72-842.pdf | 3MB | 6/28/26 |