R25-01 ADA Curb Ramps
Closed State & local contract opportunity Posted
- Solicitation number
- 26-19
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Barbara Mason bmason@beaumontca.gov (951) 572-3236
- Stephanie Urueta stephanie.urueta@costamesaca.gov (714) 754-5305
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Escondido is soliciting proposals for as-needed geotechnical and special inspection services for Utilities Capital Improvement Projects, with proposals due June 18, 2026. The City of Costa Mesa is requesting proposals for professional engineering design services for the Center Street Pedestrian Crossing and Circulation Improvements project, with proposals due June 17, 2026 at 2:00 p.m. PDT. The City of Carson is seeking bids from qualified firms for certified backflow testing, annual inspections, reporting, maintenance, and emergency response services for approximately 200 city-owned backflow prevention devices, with bids due June 18, 2026.
For the Escondido geotechnical services: The scope encompasses soil sampling for proctor tests accompanying soil compaction testing, special inspections for structural concrete construction on water, wastewater, recycled water, and stormwater infrastructure projects, in-situ soil assessments, and construction-phase geotechnical support. Services are authorized on a task-order basis depending on consultant specialty, availability, and city project needs. Work may include pipelines, pump stations, treatment facility projects, utility infrastructure rehabilitation, and geotechnical expert opinions on soil, rock, and foundational matters to resolve construction-related issues.
For the Costa Mesa design services: The project involves designing a Pedestrian Hybrid Beacon Signal (HAWK signal) on Placentia Avenue at Center Street, with a complementary curb extension (bulb-out) at the northwest corner. Additional deliverables include new signing and striping, slurry seal, new curb ramps, sidewalk improvements, landscaping, parkway work, and utility relocations as needed. The project is located at the intersection of Placentia Avenue (a 4-lane primary arterial with Class IV separated bicycle facilities and 35 mph posted speed limit) and Center Street (a 2-lane local residential street with 25 mph posted speed limit). Questions are due May 27, 2026 at 11:00 a.m. PDT. The contract is awarded on a lump-sum basis.
For the Carson backflow services: All work constitutes Public Works and is subject to prevailing wage, DIR registration, bonding, safety requirements, and compliance with the City's Project Labor Agreement. Services support compliance with state and local drinking water protection regulations, including Golden State Water Company and California Water Service backflow requirements.
Opportunity text
4 versions
Update #4 · Latest ·
The proposed work shall be performed in accordance with the contract documents, including but not limited to the general conditions, special conditions, technical specifications, contract drawings, permits, and all other reference documents. In general, the work includes, but is not limited to: the removal, replacement, and reconstruction of thirty-five (35) non-compliant corner curb ramps in Beaumont, CA. The scope ensures all intersections meet the Americans with Disabilities Act (ADA) guidelines and Public Right-of-Way Accessibility Guidelines (PROWAG) and includes the associated traffic control. The work to be completed is located at various locations within the Fairway Canyon area in Beaumont, CA.
Update #3 ·
Notice is hereby given that the City of Escondido, a California municipal corporation, is soliciting proposals from qualified consultants to provide geotechnical and special inspection services for Utilities Capital Improvement Projects, on an as-needed basis. The City of Escondido Utilities Department is seeking qualified consultants to provide geotechnical support such as collecting soil samples for proctor tests to accompany soil compaction testing for earthwork operations and performing special inspections for structural concrete construction on water, wastewater, recycled water, and stormwater infrastructure projects. Services will be authorized on a task-order basis, depending on the consultants specialty and availability, and the Citys project needs. Work under this contract may include, but is not limited to pipelines, pump stations, and treatment facility projects; utility infrastructure rehabilitation projects; in-situ soil assessments; and construction-phase geotechnical support. Consultants may be tasked with providing the City with geotechnical expert, evidence-based opinions on soil, rock and foundational matters to help resolve construction-related issues.
Update #2 ·
The City of Carson is seeking bids from qualified firms to provide certified backflow testing, annual inspections, reporting, maintenance, minor and major repairs or replacements, and emergency response services for approximately 200 City-owned backflow prevention devices located citywide. The selected contractor will support the Citys compliance with state and local drinking water protection regulations, including Golden State Water Company and California Water Service backflow requirements. The City operates a diverse inventory of backflow prevention assemblies installed across parks, medians, public buildings, irrigation systems, and landscaped areas. These devices protect the Citys potable water system from potential contamination and require annual testing, accurate reporting, and timely maintenance to ensure safe operation. The City seeks a contractor with demonstrated expertise, strong technical capabilities, and the capacity to provide reliable services. All work under this contract constitutes Public Works and is subject to prevailing wage, DIR registration, bonding, safety requirements, and compliance with the Citys Project Labor Agreement (PLA).
Update #1 ·
The Public Works Department of the City of Costa Mesa (City) is requesting proposals for professional engineering services for the design of the Citys Center Street Pedestrian Crossing and Circulation Improvements project. Placentia Avenue is a 4-lane Primary Arterial with a continuous two-way left-turn lane and with directional Class IV separated bicycle facilities (Cycle Tracks). The posted speed limit along Placentia Avenue within the project limits is 35 miles per hour (mph). At the intersection of Placentia Avenue and Center Street, there are retail land uses on the northwest and northeast corners of the intersection and residential properties on the southwest and southeast corners. Center Street is a 2-lane local residential street with single family homes east of Center Street and multi-family housing west of Center Street. Center Street has on-street parking on both sides of the street and has a posted speed limit of 25 mph. The purpose of the project is to facilitate pedestrian crossing movements at the intersection of Placentia Avenue and Center Street and further improve bicycle and pedestrian safety. The City of Costa Mesa would like to procure professional engineering services for the Center Street Pedestrian Crossing and Circulation Improvements (Project) to design a Pedestrian Hybrid Beacon Signal (Also known as HAWK signal) on Placentia Avenue at Center Street (Exhibit A). The project includes a new curb extension (bulb-out) at the northwest corner of Placentia Avenue and Center Street to supplement the new crossing. The project will also consist of new signing and striping, slurry seal, new curb ramps, sidewalk, landscaping, parkways and utility relocations (as needed).
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity