Barnes Street Reconstruction
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-01
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Derrek Eckermann derrek@eckermannengineering.com (512) 556-8160
- Maria Reina Rances-Trice mariareinabances-trice@cor.gov (972) 744-4282
- Ryan Aldrich ryan.aldrich@haskell.com (469) 400-5100
- Leslie Black lblack@whitehousetx.org (903) 510-7500
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Alliance Regional Water Authority (ARWA) is soliciting proposals for the Carrizo System Expansion project under two guaranteed maximum price (GMP) phases, with proposals due June 4, 2026, and a pre-bid site visit scheduled prior to that deadline.
GMP 1 encompasses expansion of the existing water treatment plant from 19 million gallons per day to 38 million gallons per day capacity and construction of a new clarification system. GMP 2 includes construction of pipeline segments 1C and 1D, development of seven new well sites (wells to be drilled under a separate contract), and expansion of the existing booster pump station. The project is located in Hidalgo County, Texas.
A pre-bid site visit is available for prospective bidders to review project sites, assess existing infrastructure, and understand site conditions before bid submission. The flyer notification provides access to the site visit opportunity but does not specify the exact date and time within the source material provided.
No estimated contract value, contract term, incumbent contractor, or detailed evaluation criteria are stated in the materials presented.
Opportunity text
4 versions
Update #4 · Latest ·
The Work consists of the reconstruction of approximately 550 lf of an existing asphalt street.
Update #3 ·
The City of Whitehouse, Texas (City), is soliciting Statements of Qualifications (SOQs) from qualified architectural firms interested in providing professional architectural services for the implementation of the Whitehouse Municipal Complex Project. The selected firm will provide architectural design, consultant coordination, construction document preparation, bidding assistance, and construction administration services associated with: City Hall and Police Department Renovation and Expansion. Construction of a New Fire Station. City Park Improvements.
Update #2 ·
The contracted services will primarily be for projects that are included in the upcoming 2026 Bond Program, projects identified in the Citys Capital Improvements Plan (CIP), unprogrammed projects, or operational/maintenance projects. Project scopes may include roadways, alleys, sidewalks, drainage, water distribution, sanitary sewer collection, and combined projects, along with surveying, geotechnical engineering and construction materials testing, traffic engineering and planning, traffic operations, facility design, park planning and trail design, subsurface utility engineering, and construction management. Assigned projects or tasks may include the design of new infrastructure, upgrades to existing infrastructure, rehabilitation or reconstruction of existing infrastructure, studies or evaluations of new or existing infrastructure, or a combination of the preceding.
Update #1 ·
Carrizo System Expansion for Alliance Regional Water Authority (ARWA) GMP 1 and 2. GMP 1 includes the expansion of the existing water treatment plant from 19 MGD to 38 MGD and construction of the new clarification system. GMP 2 includes segments 1C and 1D of the pipeline, construction of seven (7) well sites (wells to be drilled in a separate contract), and expansion of the existing booster pump station.