This is a pre-bid site visit flyer for the Alliance Regional Water Authority (ARWA) Carrizo System Expansion project in Texas, which encompasses two guaranteed maximum price (GMP) phases. GMP 1 involves the expansion of the existing water treatment plant from 19 million gallons per day (MGD) to 38 MGD capacity and construction of a new clarification system. GMP 2 includes construction of pipeline segments 1C and 1D, development of seven new well sites (with wells to be drilled under a separate contract), and expansion of the existing booster pump station. The flyer announces a pre-bid site visit opportunity for prospective bidders to review the project sites and become familiar with the scope of work before submitting proposals.
The flyer provides notification of the scheduled pre-bid site visit, allowing interested contractors to inspect the work areas and gain relevant project information prior to bid submission. This site visit represents an important opportunity for bidders to assess existing infrastructure, understand site conditions, and clarify project requirements before committing to a bid. The specific date, time, location details, and registration requirements for the site visit are communicated through this flyer to facilitate contractor participation in the bidding process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOIN THE TEAM BEHIND CARRIZO’S WATER TREATMENT FACILITY IMPROVEMENTS
PARTNER WITH
HASKELL
May 14, 2026 Starting at 10:00 am CST
Water Treatment Plant 10:00am CST 362 Wolf Run Road Rosanky, TX 78953
Maxwell Booster Pump Station 1:30 pm CST
9901 TX-142
Maxwell, TX 78656
Ryan Aldrich Preconstruction Manager
RYAN.ALDRICH@HASKELL.COM
Richard Gomez, PE Director - Project Executive
RICHARD.GOMEZ@HASKELL.COM
PRE-BID SITE VISIT