Alamo South Phase 1 Maintenance

Closed State & local contract opportunity Posted

Solicitation number
SRFP 544
State
California
Responses due

Opportunity facts

Jurisdiction
Points of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Imperial Irrigation District is requesting proposals for Phase 1 of the Alamo South Maintenance project, a dust control initiative at the Salton Sea, with proposals due August 4, 2026 at 5:00 p.m. PDT. A mandatory pre-bid meeting and jobwalk is scheduled for July 7, 2026 at 8:30 a.m. at the Sonny Bono Salton Sea National Wildlife Refuge Visitor Center (906 W. Sinclair Road, Calipatria, California); attendance confirmation is required via email to purchasing@iid.com and presence for the entire meeting is mandatory for proposal eligibility.

Phase 1 scope includes earthworks—sand fence removal, surface roughening, collapsing, and access route preparation—and the procurement and installation of approximately 35,620 straw bales. The contract will be awarded on a lump sum cost basis to a single respondent. The project is located in Imperial County, California.

Written questions must be submitted no later than 5:00 p.m. on July 21, 2026, to Marty P. Holbrook at purchasing@iid.com, with IID responses provided by 5:00 p.m. on July 23, 2026. Proposals must be submitted in paper format. Inquiries regarding the procurement can be directed to Jasmine Ramirez at 760-339-9270 or jasramirez@iid.com.

Opportunity text

Imperial Irrigation District (IID), an irrigation district established under Division 11 of the California Water Code, Sections 20500 et seq., that provides non-potable water, farm drainage and power services to the lower southeastern portion of California's desert, is requesting proposals from highly qualified Respondents to: Implement a phased maintenance approach to an existing dust control project within the Alamo South Planning Area. Implement Phase 1 of the Alamo South Maintenance project which includes earthworks (sand fence removal, surface roughening collapsing, and access route preparation), and the procurement and installation of approximately 35,620 straw bales at the Salton Sea.

Files

File Type Posted
Alamo South Phase 1 Maintenance.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity