2027 Airport Way & Elevated Roadway Construction
Open State & local contract opportunity Posted
- Solicitation number
- FB-2026-094
- State
- Idaho
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Suzannah Hitchcock shitchcock@cityofboise.org (208) 334-3510
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Boise Airport is requesting bids for 2027 Airport Way and elevated roadway construction at Boise Airport in Boise, Idaho, with bids due November 12, 2026. Work is performed at the Boise Airport and surrounding areas in Ada County.
The scope encompasses three major categories: removal of traffic control infrastructure (channelizers, signs, barricades, drums, advance warning panels, portable markers, flaggers, and painted/thermoplastic pavement markings); concrete work including waterproof systems, PPC overlays, bridge deck removal, crossbeam blockout repairs, bridge seal expansion joints, new sidewalk construction, and underdeck repairs; and roadway repairs including clearing and grubbing, asphalt pavement removal, sidewalk and curb removal and installation, and pavement marking. Special provisions address tree protection, rotomill operations, landscaping repairs, and temporary traffic control. Work items are measured in various units with payment variations expected to range from 75 to 125 percent of estimated quantities.
Contract documents were prepared by HDR Engineering, Inc. (412 E. Parkcenter Boulevard, Suite 100, Boise, Idaho 83706) and incorporate by reference the Idaho Transportation Department 2023 Standard Specifications for Highway Construction Section 100 and ISPWC-2020 technical specifications. Federal provisions include Title VI Civil Rights requirements, Fair Labor Standards Act compliance, and OSHA standards. Contractors must carry Commercial General Liability insurance with minimum limits of $2 million per occurrence and Workers Compensation coverage, with the City of Boise Airport and HDR Engineering listed as additional insureds. Contractors bear all permit costs, water for construction, temporary lighting, dust control, and final site cleanup. The Owner reserves the right to approve all subcontractors and eliminate work items to remain within available funding. Contractors must maintain marked-up drawings, specifications, and product data throughout the construction period.
Opportunity text
Scope of Work: The Contract encompasses the following services: 1. Elevated Roadway Repairs - Removal of channelizers, traffic control signs, barricades, drums, advance warning arrow panels, portable tubular markers, flaggers, painted and thermoplastic pavement markings, permanent signing, mobilization, and contingency allowances. 2. Concrete Work - Concrete waterproof systems, prepared and placed PPC overlays, concrete bridge deck removal, bridge crossbeam blockout repairs, bridge seal expansion joints at curbs, construction of new sidewalks, underdeck repairs, and various other concrete-related tasks. 3. Roadway Repairs -Tasks include clearing and grubbing, removal of asphalt pavement, sidewalks, curb and gutter; installation of vertical curb & gutter; traffic control measures; pavement marking; and mobilization for roadway repairs. The work will be performed at the Boise Airport and surrounding areas in Boise, Idaho.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-2027 Airport Way _ Elevated Roadway Construction.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity