2026 Road Repair Project - Ashbrook Subdivision

Closed State & local contract opportunity Posted

Solicitation number
10336529
State
Illinois
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Village of Indian Head Park, Illinois is requesting bids for roadway rehabilitation (grind and overlay) of the Ashbrook Subdivision, approximately 5,102 linear feet (0.97 miles) of village-owned streets, with bids due September 4, 2026 at 11:00 a.m. The project includes local funding, which may impose additional requirements on bidders.

The scope encompasses pavement surface removal, intermittent curb and gutter removal and replacement, sidewalk removal and replacement, full-depth pavement patching, intermittent driveway pavement removal and replacement, utility structure adjustments, hot-mix asphalt binder and surface course placement, landscape restoration, pavement markings, traffic control and protection, aggregate shoulder maintenance, and all incidental work necessary to complete improvements in accordance with plans and specifications. The designer is Thomas Engineering Group, LLC, located in Oak Brook, Illinois.

Plans and specifications are available through QuestCDN. The Village of Indian Head Park contact is 708-246-3080; the designer's representative, Kevin VanDeWoestyne, is reachable at 855-533-1700. The Village of Indian Head Park is located at 201 Acacia Drive, Indian Head Park, Illinois 60525.

Opportunity text

Roadway rehabilitation (grind and overlay) of village-owned and maintained streets. The work includes, but is not limited to, pavement surface removal, intermittent curb and gutter removal and replacement, sidewalk removal and replacement, full-depth pavement patching, intermittent driveway pavement removal and replacement, utility structure adjustments, placement of hot-mix asphalt (HMA) binder and surface courses, landscape restoration, pavement markings, traffic control and protection, and all incidental and collateral work necessary to complete the improvements in accordance with the plans and specifications. The total project length is approx., 5,102 LF (0.97 miles). The project also includes aggregate shoulder maintenance, intermittent pavement patching, and curb and gutter replacement.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity