2026 Pavement Rehabilitation Project
Closed State & local contract opportunity Posted
- Solicitation number
- MB2025-ST02
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Jonathan "Nate" Stong nstong@morrobayca.gov (805) 772-6200
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Morro Bay is soliciting bids for pavement rehabilitation on asphalt concrete roadways, with proposals due September 29, 2026. The scope encompasses slurry seal, grinding, localized dig-outs, and full-depth rehabilitation of asphalt pavements, plus construction of concrete facilities including curb, gutter, sidewalk, curb ramps, valley gutters, and spandrels. The contractor must provide all tools, materials, labor, equipment, and incidentals necessary to complete the work, along with traffic control, signage, public notifications, stormwater control, vegetation removal, formwork, and utility protection or adjustment. All work must conform to City of Morro Bay Standard Specifications and Drawings and Caltrans Standard Specifications.
No contract value, budget range, contract term, or place of performance detail beyond the City of Morro Bay is stated in the source. No set-aside, preference program, incumbent contractor, pre-bid meeting, site-visit date, questions-due deadline, or evaluation criteria are identified. The source does not provide the full RFP package details necessary to assess bid specification depth, mobilization requirements, project phasing, or performance schedule.
Opportunity text
The work shall include, but is not limited to, providing all tools, materials, labor, equipment, and incidentals necessary for the rehabilitation of asphalt concrete roadways utilizing a combination of treatments including slurry seal, grinding and localized dig outs, full rehabilitation, and construction of concrete facilities including curb, gutter, sidewalk, curb ramps, valley gutters and spandrels. All utilities not called out to be replaced will be protected in place. Manholes and other utility access frames and covers will be protected in place or adjusted to grade. The work will also include any required traffic control, signage, public notifications, stormwater control, vegetation removal, formwork, and all other work necessary to render the infrastructure/facility complete and operational, as shown on the Project Plans and Specifications, as specified herein, and in accordance with City of Morro Bay Standard Specifications and Drawings, and Caltrans Standard Specifications.
Files
| File | Type | Posted |
|---|---|---|
| 2026 Pavement Rehabilitation Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity