This is a Scope of Work document for the City of Morro Bay, California, detailing the 2026 Pavement Rehabilitation Project. The project encompasses comprehensive rehabilitation of asphalt concrete roadways through multiple treatment methods including slurry seal applications, grinding, localized excavations, and full-depth rehabilitation, along with construction of concrete facilities such as curb, gutter, sidewalk, curb ramps, valley gutters, and spandrels. The work requires the contractor to provide all necessary tools, materials, labor, equipment, and incidentals to complete the project. Additionally, the scope includes traffic control implementation, public signage and notifications, stormwater control measures, vegetation removal, formwork installation, and utility protection or adjustment as needed. All work must be executed in accordance with the City of Morro Bay Standard Specifications and Drawings and Caltrans Standard Specifications.
The document does not specify contract pricing terms, award dates, response deadlines, site visit schedules, or bidder conference details within the provided file excerpt. No information regarding set-asides, incumbent contractors, funding sources, or specific project budget amounts is included in this summary document. The contract requirements emphasize that all utilities not designated for replacement shall be protected in place, with manholes and utility access frames either retained in their original state or adjusted to final grade elevation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO BIDDERS
City of Morro Bay
Public Works Department
2026 PAVEMENT REHABILITATION PROJECT
Project No. MB2025-ST02
Notice is hereby given by the Public Works Department and the City Clerk of the City of Morro Bay, California, in the City Clerk’s Office, 595 Harbor Street, Morro Bay, CA 93442, that the City will receive sealed bids until 2:00
P.M. Tuesday, September 29, 2026. Bids received after that time will be returned unopened. The bids shall be opened and read aloud by the City Clerk, on the above-specified date at or about 2:05 P.M. in an adjacent conference room accessible to the bidders and the public or in front of City Hall if dictated by current public health guidelines.
Mailing and hand delivery address for bid proposals is:
595 Harbor Street, Morro Bay, CA 93442
All bids shall be clearly marked, to prevent inadvertent opening by City mail management staff in advance of the bid opening, as:
2026 PAVEMENT REHABILITATION PROJECT
MB2025-ST02
Scope of Work:
The work shall include, but is not limited to, providing all tools, materials, labor, equipment, and incidentals necessary for the rehabilitation of asphalt concrete roadways utilizing a combination of treatments including slurry seal, grinding and localized digouts, full rehabilitation, and construction of concrete facilities including curb, gutter, sidewalk, curb ramps, valley gutters and spandrels. All utilities not called out to be replaced will be protected in place. Manholes and other utility access frames and covers will be protected in place or adjusted to grade. The work will also include any required traffic control, signage, public notifications, stormwater control, vegetation removal, formwork, and all other work necessary to render the infrastructure/facility complete and operational, as shown on the Project Plans and Specifications, as specified herein, and in accordance with City of Morro Bay Standard Specifications and Drawings, and Caltrans Standard Specifications.
The Contract Documents must be obtained by download from ASAP Reprographics at www.asapreprographics.com.
Bidders must register as an Official Plan Holder by contacting ASAP Reprographics and pay $25 (non-refundable) to download Contract Documents (including technical specifications and drawings) and be assured of receiving all addenda and plan revisions that may occur during the bidding process. The document holder list may be viewed online at the website above.
If a bid is submitted by a Contractor who is not licensed with classification “A” license in accordance with the provisions of the California Contractors License Law, the Bidder’s Bond shall be forfeited as detailed in Section 8.2 of the Invitation to Bidders. The City reserves the right to reject any and all bids, to waive irregularities, and make an award deemed in the best interest of the City. Postmarks and facsimiles are not acceptable.
Bids shall be executed on the forms provided in the book of bidding documents and in accordance with the instructions contained therein. Bids submitted in any way other than on those project-specific, City forms will not be accepted.
Bid security, in an amount not less than 10 percent (10%) of the total bid dollar amount, is required to be submitted with each bid. The bid security shall be in the form of a bidder's bond or a certified or cashier's check drawn upon a responsible bank made payable to the City of Morro Bay and conditioned to be forfeited to the City in the event the bidder, if their bid is accepted, does not enter into a written contract within ten (10) days after the Notice To Proceed is issued after the awarding of the contract. The bidder to whom the award is made will be required to furnish a payment bond and a faithful performance bond.
Requests for information or clarification and any questions must be submitted IN WRITING and received in the Department of Public Works no later than 5:00 p.m. on Tuesday, September 22, 2026. Requests may be submitted via e-mail addressed to:
Jonathan “Nate” Stong, P.E., City Engineer nstong@morrobayca.gov https://www.projectsasap.com/projects/558/details/2026-pavement-rehabilitation-project-project-no-mb2025-st02
Prevailing wages shall be paid in accordance with the provisions of Sections 1770 and 1780 of the State of California Labor Code of the State of California and the Compliance Monitoring Unit within the Division of Labor Standards Enforcement. In addition, the following conditions apply:
• No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
• No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
• This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations
Prospective bidders are encouraged to walk through the proposed project sites to become familiar with the site conditions.
A mandatory pre-bid conference will be held for this project:
Thursday, September 17, 2026 at 10:00 a.m.
CITY OF MORRO BAY PUBLIC WORKS DEPARTMENT
955 SHASTA AVENUE
MORRO BAY, CA
The Engineering Division has calculated an estimate of probable construction costs for this project. The City does not wish to publicize the engineer's estimate of the project cost since this information may tend to influence the number and nature of bids received. However, for the bidder's convenience and bonding estimating, the engineer's estimate falls within a range of $2,750,000 to $3,250,000 for the base bid and approximately $500,000 for each additive alternate. The allotted time of construction for this project is NINETY (90) WORKING DAYS. A working day is every weekday, except legal holidays as defined in Section 1-2 of the Special Provisions.
CITY OF MORRO BAY
DEPARTMENT OF PUBLIC WORKS – ENGINEERING DIVISION
Dated:
Jonathan “Nate” Stong, PE
City Engineer
September 1, 2026