2025 I-84 Bridge Approach Paving Bundle

Solicitation # S7300000012736
Posted 3/13/25, 8:51 PM
No Updates
Due 4/7/25, 5:00 PM
State
Oregon
Source
View
Similar Opportunities
The Oregon Department of Transportation (ODOT) is soliciting bids for a pavement preservation project on Interstate 5 between mileposts 34-36 in Jackson County, involving a two-inch deep inlay and comprehensive roadway surface improvement. This Invitation to Bid (ITB) is for a public works contract requiring specialized highway construction services, with specific technical requirements including grinding, paving, road marker placement, and pavement striping. Bidders must be licensed with the...
The Oregon Department of Transportation (ODOT) is seeking a qualified contractor to execute a comprehensive roadway infrastructure project on OR22 in Polk County, spanning from Rickreall Road to Doaks Ferry Road NW. The Invitation to Bid (ITB/Bid Solicitation No. S-73000-00012819) requires a contractor to perform extensive paving, signing, and traffic infrastructure improvements, including stripe removal, cold plane pavement removal, thermoplastic markings, sign installations, and marker...
The Oregon Department of Transportation (ODOT) is seeking bids for a pavement preservation project on Interstate 5 between mileposts 69-76 in Josephine County, specifically targeting grinding and paving activities. The procurement is an Invitation to Bid (ITB) for a state-funded public improvement contract involving a two-inch deep inlay pavement preservation process. Key deliverables include cold plane pavement removal, application of emulsified asphalt tack coat, and placement of PG76-22ER...
The Oregon Department of Transportation (ODOT) has issued an Invitation to Bid (ITB) for a Vehicle Access Prevention Package 3 project, specifically focused on placing riprap boulder rows with gated openings to restrict motor vehicle access to non-roadway areas owned by ODOT. The procurement is a competitive bidding process with a posted date of March 6, 2025, and a bid submission deadline of March 20, 2025. The project involves strategic placement of physical barriers to prevent unauthorized...
The Oregon Department of Transportation (ODOT) has issued a Request for Bid (RFB) for On-Call Region 2 Paving services, specifically for project S-73000-00013002 located in Marion County. This procurement is limited to existing price agreement holders and focuses on a comprehensive paving project at the intersection of OR219 and McKay Rd. NE. The project scope includes cold plane pavement removal of 3,172 square yards and installation of 714 tons of Level 3 dense ACP mixture, with additional...
The Oregon Department of Transportation (ODOT) is soliciting competitive quotes for the Barrier Gate Pilot Project, a transportation infrastructure initiative located in Multnomah County. The project requires constructing asphalt concrete pavement and installing barrier gates along the Columbia River Highway, specifically at mile posts 11.38, 29.32, and 47.55. Contractors must submit comprehensive bids through the OregonBuys web-based eProcurement system by March 25, 2025, and are required to...

The Oregon Department of Transportation (ODOT) has issued an Invitation to Bid (ITB) for the 2025 I-84 Bridge Approach Paving Bundle project, specifically targeting bridge approaches in Wasco County. The procurement seeks a contractor to perform cold plane pavement removal and install a 2-inch HMAC (Hot Mix Asphalt Concrete) inlay at specific bridge locations, including the Deschutes River bridge (Mile Post 99.87, westbound) and the John Day River bridge (Mile Post 114.60, both eastbound and westbound directions). Targeted project areas include approach sections measuring 40' x 125' and 32' x 125', with required deliverables encompassing comprehensive traffic control and temporary pavement markers. The project requires using Level 3 Inch Dense Graded Commercial Asphalt Concrete Pavement with PG64-28 asphalt cement, adhering to strict technical specifications. Key deadlines include the bid submission due date of April 7, 2025, with a mandatory preconstruction conference and work commencement within 10 working days after the meeting. Traffic lane closures are permitted Monday through Wednesday between 5:00 a.m. and 7:00 p.m., maintaining a 16-foot lane width.

While no specific set-aside designations or disadvantaged enterprise requirements are explicitly detailed in the provided documentation, the project includes specific technical and operational constraints that will influence contractor qualifications. Load restrictions are stringent, limiting combined vehicle weight to 65,000 pounds per 1,000 square feet on the bridges. ODOT will handle permanent striping after job completion, and contractors will be paid upon contract work completion with no retainage held. Though the exact budget range is not specified in the available documents, the project's technical complexity and specific infrastructure requirements suggest a moderate to significant investment. Contractors will need to demonstrate capabilities in highway infrastructure maintenance, asphalt paving, traffic management, and compliance with precise engineering specifications. The project's focused scope on bridge approach rehabilitation indicates a targeted infrastructure improvement initiative within the I-84 corridor in Wasco County.

Generated 3/14/25, 7:29 AM