About this opportunity
California Department of Transportation (Caltrans) is requesting bids for replacing drainage systems, electrical systems, and guardrails with concrete barriers on Route 133 and Route 241 in Orange County, with bids due September 24, 2026. This is a federal-aid project (NH-X059(090)) subject to prevailing-wage and Buy America requirements.
Contractors must hold either a Class A license or a combination of Class C-8 and Class C-42 licenses. The scope spans 122 line items including temporary traffic control, drainage work, concrete structures, electrical systems, guardrail removal and installation, concrete barrier placement, and pavement markings across Route 133 (from 0.5 miles south of Irvine Boulevard Overcrossing to Route 133/241 Separation) and Route 241 (from 0.4 miles south of Portola Parkway Overcrossing to 0.4 miles south of Windy Ridge Toll Plaza). Work must be completed excluding permanent erosion control within 370 working days; including permanent erosion control within 500 working days; and permanent erosion control establishment within 250 working days.
The estimated project cost is $24.5 million. Bidders must submit security equal to at least 10 percent of their bid. Prevailing wages apply as determined by the California Director of Industrial Relations and the United States Secretary of Labor, with contractors obligated to pay the higher rate when federal and state determinations differ. Buy America requirements apply to iron, steel, manufactured products, and construction materials, with compliance documentation required.
The project requires seven apprentices or trainees under the federal training program. Safety representative qualifications must include Cal/OSHA 30-hour or OSHA 510 certification. Prompt-payment procedures require subcontractor payment within seven days of progress-payment receipt. Environmental product declarations for hot mix asphalt and concrete are required for facilities providing specified minimum quantities. The contract includes detailed traffic control specifications with lane closure restrictions tied to designated holidays and special days, subject to liquidated damages for non-compliance.
Opportunity text
General work description: Replace drainage, Elect systems, and guardrail with Conc barrier. Complete the work, excluding permanent erosion control establishment work, within 370 working days. Complete the work, including permanent erosion control establishment work, within 500 working days. Complete the permanent erosion control establishment work within 250 working days.
Files
| File | Type | Posted |
|---|---|---|
| 12-0T7304 Replace Drainage_ Elect Systems_ and Guardrail with Conc Barrier.pdf |