This is a Notice to Bidders and Special Provisions for Construction document issued by the California Department of Transportation (Caltrans) for a highway construction project in Orange County. The project involves replacing drainage systems, electrical systems, and guardrails with concrete barriers on Route 133 (from 0.5 miles south of Irvine Boulevard Overcrossing to Route 133/241 Separation) and Route 241 (from 0.4 miles south of Portola Parkway Overcrossing to 0.4 miles south of Windy Ridge Toll Plaza). The contract, identified as 12-0T7304 and designated as a federal-aid project (NH-X059(090)), requires completion of work excluding permanent erosion control within 370 working days, inclusive of permanent erosion control within 500 working days, and permanent erosion control establishment within 250 working days. Bids opened on Thursday, September 24, 2026, via electronic sealed bidding on the Bid Express website, with a 2:00 p.m. closing time. The bid item list contains 122 line items encompassing temporary traffic control, drainage work, concrete structures, electrical systems, guardrail removal and installation, concrete barrier placement, and pavement markings. Contractors must hold either a Class A license or a combination of Class C-8 and C-42 licenses, and the project requires seven apprentices or trainees under the federal training program.

The estimated project cost is $24,500,000, and bidders must submit security equal to at least 10 percent of their bid. Prevailing wages are required on this contract, with rates determined by the California Director of Industrial Relations and the United States Secretary of Labor, with contractors obligated to pay the higher rate when federal and state determinations differ. The contract is subject to Buy America requirements for iron, steel, manufactured products, and construction materials, with specific compliance documentation required. Special provisions address grade quality control requirements, safety representative qualifications and responsibilities (including Cal/OSHA 30-hour or OSHA 510 certification), prompt payment procedures requiring subcontractor payment within seven days of progress payment receipt, and detailed traffic control specifications including lane closure restrictions tied to designated holidays and special days with associated liquidated damages for non-compliance. Environmental product declarations for hot mix asphalt and concrete are required for facilities providing specified minimum quantities, and material sourcing includes provisions for local material testing and analysis before placement. The project involves coordination with multiple coincident or adjacent contracts and includes restrictions on complete freeway closures, connector closures, and ramp closures based on specific hourly charts provided in the specifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bids open Thursday, September 24, 2026 Dated August 3, 2026 OSD

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

NOTICE TO BIDDERS

AND

SPECIAL PROVISIONS

FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY ON ROUTE

133 FROM 0.5 MILE SOUTH OF IRVINE BOULEVARD OVERCROSSING TO

ROUTE 133/241 SEPARATION AND ON ROUTE 241 FROM 0.4 MILE SOUTH OF

PORTOLA PARKWAY OVERCROSSING TO 0.4 MILE SOUTH OF WINDY

RIDGE TOLL PLAZA

In District 12 On Route 133, 241 Under

Bid book dated August 3, 2026 Standard Specifications dated 2025

Project plans approved May 7, 2026 Standard Plans dated 2025

Identified by Contract No. 12-0T7304

12-Ora-133, 241-11.4/13.6, 24.5/35.7 Project ID 1222000083

Federal-Aid Project

NH-X059(090)

SPECIAL NOTICES

• See sections 2 and 3 for contractors' registration requirements.

• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.

• See section 2 for submittal requirements for DVBE quotes and Non–Small Business

Subcontractor Preference.

• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).

• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.

• The flagging and temporary traffic control requirements have been revised. See sections 7-

1.03, 7-1.04, and 12.

• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.

• See section 14-11.14 for changes to the management of treated wood waste.

• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.

Contract No. 12-0T7304 i

TABLE OF CONTENTS

NOTICE TO BIDDERS

BID ITEM LIST

SPECIAL PROVISIONS

ORGANIZATION

DIVISION I GENERAL PROVISIONS

1 GENERAL

2 BIDDING

5 CONTROL OF WORK

6 CONTROL OF MATERIALS

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

8 PROSECUTION AND PROGRESS

9 PAYMENT

DIVISION II GENERAL CONSTRUCTION

12 TEMPORARY TRAFFIC CONTROL

13 WATER POLLUTION CONTROL

14 ENVIRONMENTAL STEWARDSHIP

15 EXISTING FACILITIES

DIVISION III EARTHWORK AND LANDSCAPE

17 GENERAL

19 EARTHWORK

20 LANDSCAPE

21 EROSION CONTROL

DIVISION IV SUBBASES AND BASES

29 TREATED PERMEABLE BASES

DIVISION V SURFACINGS AND PAVEMENTS

39 ASPHALT CONCRETE

DIVISION VI STRUCTURES

49 PILING

56 OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES

DIVISION VIII MISCELLANEOUS CONSTRUCTION

73 CONCRETE CURBS AND SIDEWALKS

DIVISION IX TRAFFIC CONTROL DEVICES

81 MISCELLANEOUS TRAFFIC CONTROL DEVICES

83 RAILINGS AND BARRIERS

84 MARKINGS

DIVISION X ELECTRICAL WORK

86 GENERAL

ii

87 ELECTRICAL SYSTEMS

iii

STANDARD PLANS LIST

The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.

RSP A3A Abbreviations (Sheet 1 of 3)

RSP A3B Abbreviations (Sheet 2 of 3)

RSP A3C Abbreviations (Sheet 3 of 3)

A10A Legend - Lines and Symbols (Sheet 1 of 5)

A10B Legend - Lines and Symbols (Sheet 2 of 5)

A10C Legend - Lines and Symbols (Sheet 3 of 5)

A10D Legend - Lines and Symbols (Sheet 4 of 5)

A10E Legend - Lines and Symbols (Sheet 5 of 5)

A20A Pavement Markers and Traffic Lines - Typical Details

A20B Pavement Markers and Traffic Lines - Typical Details

A20C Pavement Markers and Traffic Lines - Typical Details

A20D Pavement Markers and Traffic Lines - Typical Details

A20E Traffic Lines - Typical Details for Contrast Striping

A24A Pavement Markings - Arrows

A62A Excavation and Backfill - Miscellaneous Details

A62D Excavation and Backfill - Concrete Pipe Culverts

A62DA Excavation and Backfill - Concrete Pipe Culverts - Indirect Design Method

A73B Markers

A73C Delineators, Channelizers and Barricades

A74 Survey Monuments

RSP A76AB Concrete Barrier Type 60M Details

A76G Concrete Barrier Type 60MS

A76HA Concrete Barrier Type 60MS Connection to Crash Cushion

A76HB Concrete Barrier Type 60MS to Transition Railing (Type AGT)

A77L1 Midwest Guardrail System - Standard Railing Section (Wood Post with Wood Block)

A77L2 Midwest Guardrail System - Standard Railing Section (Steel Post with Notched Wood or Notched Recycled Plastic Block)

A77L4 Midwest Guardrail System - Transition to Metal Beam Guardrail

A77M1 Midwest Guardrail System - Standard Hardware

A77N1 Midwest Guardrail System - Wood Post and Wood Block Details

A77N2 Midwest Guardrail System - Steel Post and Block Details iv

A77N3 Midwest Guardrail System - Typical Line Post Embedment and Hinge Point Offset Details

A77N4 Midwest Guardrail System - Typical Height Measurement, Dike Positioning, and Delineation Details

A77P1 Midwest Guardrail System - Typical Layouts for Embankments

RSP A77Q1 Midwest Guardrail System - Typical Layouts for Structure Approach

A77Q5 Midwest Guardrail System - Typical Layouts for Structure Departure

A77R1 Midwest Guardrail System - Typical Layouts for Fixed Objects Between Separate Roadbeds (Two-Way Traffic)

RSP A77S1 Midwest Guardrail System - End Anchor Assembly (Type SFT - M)

A77S3 Metal Railing Anchor Cable and Anchor Plate Details

A77T2 Midwest Guardrail System - Buried Post End Anchor (Type B-F)

RSP A79A1 Transition Railing (Type AGT)

A79A3 Transition Railing (Type AGT) Details

A79B1 Transition Railing (Type AGT) to Bridge Railings without Sidewalks

A79C1 Transition Railing (Type AGT) Connections to Abutments and Walls

A79C2 Departing Transition Connections to Abutments and Walls

A87B Hot Mix Asphalt Dikes

P1 Jointed Plain Concrete Pavement - New Construction

P3A Jointed Plain Concrete Pavement - Lane and Shoulder Addition or Replacement

RSP P8A Individual Slab Replacement with Rapid Strength Concrete

P10 Concrete Pavement - Dowel Bar Details

D71 Drainage Inlet Markers

D72B CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D72C CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D72D CIP Drainage Inlets - Types GT1, GT2, GT3 and GT4

D72F CIP Drainage Inlet Notes

D72G CIP Drainage Inlet Tables

D74 Drainage Inlet Details

D77A Grate Details No. 1

D77B Grate Details No. 2

D94B Concrete Flared End Sections

D97H Reinforced Concrete Pipe or Non-Reinforced Concrete Pipe - Standard and Positive Joints

H1 Landscape and Erosion Control Symbols

H2 Landscape Details

H3 Landscape Details

H4 Landscape Details (Sprinkler Assembly) v

H5 Landscape Details (Swing Joint and Protector)

H6 Landscape Details

H7 Landscape Details

RSP H8 Landscape Details

H9 Landscape Details

H51 Erosion Control Details - Fiber Roll and Compost Sock

T1A Temporary Crash Cushion - Sand Filled (Unidirectional)

T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional)

T1B Temporary Crash Cushion - Sand Filled (Bidirectional)

T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)

RSP T3A Temporary Railing (Type K)

T3B Temporary Railing (Type K)

T3C Temporary Barrier System (Cross Bolt)

T3D Temporary Barrier System (Cross Bolt)

T3E Temporary Barrier System (Cross Bolt)

T3F Temporary Barrier System (Cal F-23)

T3F2 Temporary Barrier System (Cal F-23)

T3G Temporary Barrier System (Staking or Anchoring)

T3G2 Temporary Barrier System (Staking or Anchoring)

T4 Temporary Traffic Screen

T4A Temporary Traffic Screen (Cross Bolt)

T4B Temporary Traffic Screen (Cal F-23)

T9 Traffic Control System Tables for Lane and Ramp Closures

T10 Traffic Control System for Lane Closure on Freeways and Expressways

T10A Traffic Control System for Lane Closure on Freeways and Expressways

RSP T11 Traffic Control System for Lane Closure on Multilane Conventional Highways

T14 Traffic Control System for Ramp Closure

T18 Traffic Control System - Construction Work Zone Speed Limit Reduction on Freeways and Expressways

T20 Traffic Control System - Construction Work Zone Speed Limit Reduction Details

T21 Traffic Control System - Construction Work Zone Speed Limit Reduction Twenty- Four Hours a Day 7 Days a Week (24/7)

T61 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T63 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T64 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection) vi

T65 Temporary Water Pollution Control Details (Temporary High-Visibility Fence)

RS1 Roadside Signs - Typical Installation Details No. 1

RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2

RS4 Roadside Signs - Typical Installation Details No. 4

RS5 Roadside Sign-PSST Post-Typical Installation Details No. 1

RS6 Roadside Sign-PSST Post-Typical Installation Details No. 2

S82 Roadside Laminated Sign - Single or Multiple Panel (Type B, 1" Thick)

S85 Seam Closure, "H" Section Extrusion and Post Spacing Tables (Multi-Horizontal Laminated Panel Aluminum Signs)

S86 Laminated Panel Details (Extrusions for Type A, B, and H Panels)

S93 Framing Details for Framed Single Sheet Aluminum Signs, Rectangular Shape

S94 Roadside Framed Single Sheet Aluminum Signs, Rectangular Shape

S95 Roadside Single Sheet Aluminum Signs, Diamond Shape

ES-1A Electrical Systems (Legend)

ES-1B Electrical Systems (Legend)

ES-1C Electrical Systems (Legend)

ES-2E Electrical Systems (Service Equipment Enclosure and Typical Wiring Diagram, Type III - B Series)

ES-2F Electrical Systems (Service Equipment Enclosure and Typical Wiring Diagram, Type III - C Series)

ES-3C Electrical Systems (Controller Cabinet Foundation and Pad Details)

ES-4A Electrical Systems (Signal Head Mounting)

ES-4C Electrical Systems (Signal Heads and Mountings)

ES-4E Electrical Systems (Signal Heads)

ES-5A Electrical Systems (Loop Detectors)

ES-5B Electrical Systems (Detectors)

ES-6A Electrical Systems (Lighting Standard, Types 15 and 21)

ES-6B Electrical Systems (Electrolier Anchorage and Grouting for Type 15 and Type 21, Barrier Rail Mounted)

ES-6E Electrical Systems (Lighting Standard, Types 30 and 31)

ES-6F Electrical Systems (Lighting Standard, Slip Base Plate)

ES-6G Electrical Systems (Lighting Standard, Type 32)

ES-8A Electrical Systems (Non-Traffic Pull Box)

ES-8B Electrical Systems (Traffic Pull Box)

ES-8C Electrical Systems (Vaults)

ES-8D Electrical Systems (Vaults)

ES-9A Electrical Systems (Structure Pull Box Installations)

ES-9B Electrical Systems (Conduit Riser Expansion and Deflection Fittings, Structure Installations) vii

ES-9D Electrical Systems (Structure Pull Box Installations)

ES-10B Electrical Systems (Isofootcandle Curves)

ES-11 Electrical Systems (Foundation Installations)

ES-13A Electrical Systems (Splice Insulation Methods Details)

ES-13B Electrical Systems (Kinking and Banding Detail)

ES-15A Electrical Systems (Sign Illumination Equipment)

ES-15C Electrical Systems (Sign Illumination Equipment)

ES-15D Electrical Systems (Lighting and Sign Illumination Control)

ES-16B Electrical Systems (Camera Pole 25' to 45')

CANCELED STANDARD PLANS LIST

The 2025 standard plan sheets listed below are canceled and not applicable to this contract.

Plan No. Date Canceled Plan No. Date

Canceled Plan No. Date Canceled

P8 04-20-26

NOTICE TO BIDDERS

Bids open Thursday, September 24, 2026

Dated August 3, 2026

General work description: Replace drainage, Elect systems, and guardrail with Conc barrier.

The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON

STATE HIGHWAY IN ORANGE COUNTY ON ROUTE 133 FROM 0.5 MILE SOUTH OF IRVINE

BOULEVARD OVERCROSSING TO ROUTE 133/241 SEPARATION AND ON ROUTE 241 FROM 0.4

MILE SOUTH OF PORTOLA PARKWAY OVERCROSSING TO 0.4 MILE SOUTH OF WINDY RIDGE

TOLL PLAZA.

District-County-Route-Post Mile: 12-Ora-133, 241-11.4/13.6, 24.5/35.7

Contract No. 12-0T7304

The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-42.

Federal-aid project no.:

NH-X059(090)

For the Federal training program, the number of trainees or apprentices is 7.

Bids must be on a unit price basis.

Complete the work, excluding permanent erosion control establishment work, within 370 working days.

Complete the work, including permanent erosion control establishment work, within 500 working days.

Complete the permanent erosion control establishment work within 250 working days.

The estimated cost of the project is $24,500,000.

The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.

The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.

For bid results go to:

https://ppmoe.dot.ca.gov/cc

Select Electronic Bidding under the Bidding tab.

District office addresses are provided in the Standard Specifications.

Present bidders' inquiries to the Department and view the Department's responses at:

https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries

Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.

Submit your bid with bidder's security equal to at least 10 percent of the bid.

Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.

The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.

If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.

The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.

Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.

Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.

Department of Transportation

BID ITEM LIST

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM

0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM

0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 500

0004 090205 DISPUTE RESOLUTION BOARD ON-SITE

MEETING

EA 10

0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-

BOARD-RELATED TASKS

HR 10

0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM

0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM

0008 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 10

0009 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 260

0010 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 13,900

0011 120165 CHANNELIZER (SURFACE MOUNTED) EA 330

0012 120207 PORTABLE RADAR SPEED FEEDBACK SIGN

SYSTEM

DAY 200

0013 120300 TEMPORARY PAVEMENT MARKER EA 280

0014 120320 TEMPORARY BARRIER SYSTEM LF 33,000

0015 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM

0016 129108 TEMPORARY CRASH CUSHION TL-3 EA 35

0017 129150 TEMPORARY TRAFFIC SCREEN LF 33,000

0018 130100 JOB SITE MANAGEMENT LS LUMP SUM

0019 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM

0020 130312 PRE-STORM EVENT INSPECTION REPORT EA 63

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0021 130323 DURING-AND POST-STORM EVENT INSPECTION

REPORT

DAY 21

0022 130331 STORMWATER ANNUAL REPORT EA 3

0023 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 54

0024 130730 STREET SWEEPING LS LUMP SUM

0025 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM

0026 141120 TREATED WOOD WASTE LB 168,000

0027 146007 INVASIVE SPECIES CONTROL LS LUMP SUM

0028 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 42,600

0029 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM

0030 190101 ROADWAY EXCAVATION CY 5,380

0031 198010 IMPORTED BORROW (CY) CY 500

0032 200002 ROADSIDE CLEARING LS LUMP SUM

0033 202006 SOIL AMENDMENT CY 92

0034 202038 PACKET FERTILIZER EA 7,820

0035 204035 PLANT (GROUP A) EA 7,820

0036 204096 MAINTAIN EXISTING PLANTED AREAS LS LUMP SUM

0037 204099 PLANT ESTABLISHMENT WORK LS LUMP SUM

0038 015109 GRAVEL MULCH (CELLULAR CONFINEMENT) SQFT 20,700

0039 205035 WOOD MULCH CY 230

0040 206400 CHECK AND TEST EXISTING IRRIGATION

FACILITIES

LS LUMP SUM

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0041 206402 OPERATE EXISTING IRRIGATION FACILITIES LS LUMP SUM

0042 208445 TREE WELL SPRINKLER ASSEMBLY EA 7

0043 208446 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 25

0044 208594 (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY

LINE)

LF 245

0045 208597 (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40)

(SUPPLY LINE)

LF 688

0046 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 4

0047 210120 DUFF (SQFT) SQFT 175,000

0048 210252 BONDED FIBER MATRIX (SQFT) SQFT 87,200

0049 210350 FIBER ROLLS LF 2,880

0050 211111 PERMANENT EROSION CONTROL

ESTABLISHMENT WORK

LS LUMP SUM

0051 260203 CLASS 2 AGGREGATE BASE (CY) CY 1,110

0052 290201 ASPHALT TREATED PERMEABLE BASE CY 110

0053 390132 HOT MIX ASPHALT (TYPE A) TON 690

0054 013430 RUBBERIZED HOT MIX ASPHALT (GAP GRADED)

WITH 10% RAP

TON 210

0055 394074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 320

0056 394077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3,550

0057 397005 TACK COAT TON 0.4

0058 398100 REMOVE ASPHALT CONCRETE DIKE LF 12,300

0059 401055 JOINTED PLAIN CONCRETE PAVEMENT (RSC) CY 13

0060 510092 (F) - STRUCTURAL CONCRETE, HEADWALL CY 1

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0061 510094 (F) - STRUCTURAL CONCRETE, DRAINAGE

INLET

CY 17

0062 510502 (F) - MINOR CONCRETE (MINOR STRUCTURE) CY 1,156

0063 568046 REMOVE SIGN STRUCTURE (EA) EA 4

0064 650010 12" REINFORCED CONCRETE PIPE LF 45

0065 650014 18" REINFORCED CONCRETE PIPE LF 770

0066 650018 24" REINFORCED CONCRETE PIPE LF 1,090

0067 650026 36" REINFORCED CONCRETE PIPE LF 550

0068 650030 42" REINFORCED CONCRETE PIPE LF 42

0069 650042 60" REINFORCED CONCRETE PIPE LF 200

0070 705206 24" CONCRETE FLARED END SECTION EA 2

0071 710136 REMOVE PIPE (LF) LF 2,510

0072 710152 REMOVE HEADWALL EA 1

0073 710167 REMOVE FLARED END SECTION (EA) EA 2

0074 710262 CAP INLET EA 2

0075 730010 MINOR CONCRETE (CURB) (LF) LF 76

0076 731710 REMOVE CONCRETE CURB (LF) LF 150

0077 750001 (F) - MISCELLANEOUS IRON AND STEEL LB 2,608

0078 810120 REMOVE PAVEMENT MARKER EA 240

0079 810190 GUARD RAILING DELINEATOR EA 120

0080 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 380

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0081 820134 OBJECT MARKER (TYPE P) EA 720

0082 820250 REMOVE ROADSIDE SIGN EA 2

0083 820600 RELOCATE ROADSIDE SIGN-TWO POST EA 2

0084 820720 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 130

0085 820750 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.063"-UNFRAMED)

SQFT 10

0086 820760 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.080"-UNFRAMED)

SQFT 36

0087 820780 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.063"-FRAMED)

SQFT 42

0088 820790 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.080"-FRAMED)

SQFT 25

0089 820840 ROADSIDE SIGN - ONE POST EA 3

0090 820850 ROADSIDE SIGN - TWO POST EA 6

0091 832006 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 2,330

0092 832007 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 1,240

0093 832018 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 480

0094 839219 DOUBLE MIDWEST GUARDRAIL SYSTEM (STEEL

POST)

LF 1,100

0095 018508 REMOVE END ANCHOR ASSEMBLY EA 2

0096 839544 TRANSITION RAILING (TYPE AGT) EA 1

0097 839580 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 14

0098 015299 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 4

0099 839588 BURIED POST END ANCHOR (TYPE B-F) EA 1

0100 015165 SEVERE-DUTY CRASH CUSHION TL-3 EA 21

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0101 015705 ALTERNATIVE MEDIAN TERMINAL TL-3 EA 8

0102 839649 CONCRETE BARRIER (TYPE 60MS) LF 12,700

0103 839745 (F) - CONCRETE BARRIER TRANSITION LF 394

0104 839752 REMOVE GUARDRAIL LF 12,600

0105 839759 SALVAGE CONCRETE BARRIER (TYPE K) LF 700

0106 839774 REMOVE CONCRETE BARRIER LF 110

0107 839786 SALVAGE CRASH CUSHION EA 3

0108 840516 THERMOPLASTIC PAVEMENT MARKING

(ENHANCED WET NIGHT VISIBILITY)

SQFT 50

0109 840623 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY) (BROKEN

36-12)

LF 4,260

0110 846007 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 7,130

0111 846009 8" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 240

0112 846013 12" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 410

0113 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 18,100

0114 846035 REMOVE THERMOPLASTIC PAVEMENT

MARKING

SQFT 50

0115 847218 6" TRAFFIC STRIPE TAPE WITH CONTRAST

(WARRANTY)

LF 3,250

0116 847222 6" TRAFFIC STRIPE TAPE WITH CONTRAST

(WARRANTY) (BROKEN 36-12)

LF 2,800

0117 870112 INDUCTIVE LOOP DETECTOR (LS) LS LUMP SUM

0118 871900 FIBER OPTIC CABLE SYSTEMS LS LUMP SUM

0119 010575 MODIFYING CAMERA SYSTEMS LS LUMP SUM

0120 872131 MODIFYING LIGHTING SYSTEMS LS LUMP SUM

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0121 872133 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS LUMP SUM

0122 999990 MOBILIZATION LS LUMP SUM

SPECIAL PROVISIONS

ORGANIZATION

Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.

Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.

Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.

DIVISION I GENERAL PROVISIONS

1 GENERAL

Add to section 1-1.01:

Bid Items and Applicable Sections Item code

Item description Applicable section

090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING 5

090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED

TASKS

015109 GRAVEL MULCH (CELLULAR CONFINMENT) 20

015165 SEVERE-DUTY CRASH CUSHION TL-3 83

015299 ALTERNATIVE IN-LINE TERMINAL TL-3 83

015705 ALTERNATIVE MEDIAN TERMINAL TL-3 83

018508 REMOVE END ANCHOR ASSEMBLY 83

010575 MODIFYING CAMERA SYSTEMS 87

2 BIDDING

Add between the 1st and 2nd paragraphs of section 2-1.06B:

The Department makes the following supplemental project information available:

Supplemental Project Information Means Description

Included in the Information Handout 1. Informal Section 7 Consultation Letter from US Fish and Wildlife Service, Permit No. 2025-

0097615-S7-I-OR

2. Lake or Streambed Alteration Agreement, EPIMS-ORA-63761-R5 from California Department of Fish and Wildlife

3. Waste Discharge Requirements Order R8-2026- 0018 from California Regional Water Quality Control Board, Santa Ana Region

4. Geotechnical Design Report

5. ADL Report

6. DOTOCR0003-Final Report-Utilization of Small

Business Enterprises

7. Warranty Bond Form (TOTE-1)

8. Installation Manual for Alternative In-Line

Terminal TL-3

9. Installation Manual for Alternative Median

Terminal TL-3

10. Installation Manual for Severe-Duty Crash

Cushion TL-3

Available as specified in the Standard Specifications

Existing Surface (XML) Alignments (XML)

Available for inspection at the District Office Telephone no.: (657) 328-6000

As-built drawings

Delete section 2-1.20.

Delete section 2-1.33B(2)(b).

5 CONTROL OF WORK

Delete section 5-1.13B.

Replace section 5-1.13E with:

5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.

Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.

Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:

1. Subcontractor’s or entity’s business name

2. Description of work performed

2.1. Bid item numbers or change order numbers

2.2. Written narrative of work performed

3. Value of work performed

4. Amount paid to subcontractor or entity

5. Withhold amount, if applicable

6. Explanation of withhold reasoning, if applicable

Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.

If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:

1. Value of the disputed work

2. Amount of the withhold being taken

3. Bid item numbers or change order numbers associated with the disputed work

4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated

5. Corrective actions to be taken for release of withheld amount

The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.

The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:

1. Withhold was not applied in good faith

2. Requested additional withhold documentation records were not provided

3. Payment information was not submitted through the prompt payment monitoring system

4. Required withhold notification was not provided

The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.

Replace section 5-1.15 with:

5-1.15 SAFETY REPRESENTATIVE

5-1.15A General Designate an on-site safety representative to superintend project safety for the duration of this Contract.

The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.

The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.

Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.

5-1.15B Submittals Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.

Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:

1. Name of the entity providing certification

2. Name of the individual receiving certification

3. Date when the certification was provided

4. Expiration date, if applicable

Submit a copy of the SSSP as an informational submittal:

1. At least 15 days before starting work

2. At least 48 hours before starting work whenever a revision is made to the SSSP

5-1.15C Certifications The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.

The safety representative must have one of the following certifications:

1. Certified Safety Professional from the Board of Certified Safety Professionals

2. Construction Health and Safety Technician from the Board of Certified Safety Professionals

3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals

4. Safety Trained Supervisor from the Board of Certified Safety Professionals

5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals

6. Associate Safety Professional from the Board of Certified Safety Professionals

7. Master Safety Professional from the National Association of Safety Professionals

8. Certified Safety Director from the National Association of Safety Professionals

5-1.15D Qualifications The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:

1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry

2. Knowledge in the area of safety procedure for all types of work being performed on this project

3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA

Code of Regs safety requirements

The safety representative must have completed safety training and maintain valid certifications for:

1. First aid

2. Cardiopulmonary resuscitation

5-1.15E Duties and Responsibilities The safety representative must be available by:

1. Cellular telephone

2. Two-way radio

3. Mobile internet access

The safety representative must:

1. Develop the SSSP

2. Conduct the on-site new project orientation for each worker assigned to the project

3. Review the construction work plans for each subcontractor before starting work

4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring

5. Conduct weekly job site safety meetings

6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues

7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material hazards

8. Verify compliance with hazardous waste requirements under section 14-11, including spill prevention and control measures

9. Conduct daily safety inspections of the job site for hazards and compliance with safety requirements in the specifications and 8 CA Code of Regs

10. Report all incidents to the Engineer immediately, including the investigation of any close calls

When monitoring the job site, including work zones with certified flaggers or traffic control technicians, take immediate corrective action and notify the Engineer if an imminent danger is identified.

If the Engineer determines the safety representative is not meeting the intended duties and responsibilities, you must replace the safety representative within 30 days of written notice from the Engineer. If you need to replace the safety representative, notify the Engineer and provide replacement safety representative resume and required certifications at least 15 days before the replacement.

You may submit a secondary safety representative to act on behalf of the designated safety representative during extended shifts, continuous operations, or short-term absences that will not exceed 14 days in duration. The secondary safety representative must meet the same required qualifications and certifications as the designated safety representative.

Add to the end of section 5-1.20A:

During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:

Coincident or Adjacent Contracts

Contract no. County–Route–Post Mile Location Type of work 12-0J6804 Ora-241-PM 27.6/8.5 Irvine, Orange County Construct three general purpose lanes on SB SR-241

12-0T2404 Ora-241-PM 24.4/26.9 Irvine, Orange County Replace landscape and irrigation that were damaged/burned from the October 26, 2020 Silverado Fires

12-0V4404 Ora-241-PM 30/31 Irvine, Orange County Reconstruct failed slope and roadway by removing the underlying existing soil and replace with competent soil and geogrid fabric every two vertical feet

12-0V4904 Ora-133-PM 10.2/13.6 Irvine, Orange County Remove and upgrade existing pavement delineation, and install rumble strips

12-0V5104 Ora-241-PM 28.4/32.7 Irvine- Tustin, Orange County

Cold plane and overlay with rubberized hot mix asphalt

12-0Q980 Ora-241-PM 14.5/ 25.7 Rancho Santa Margarita and Lake Forest, Orange County

Transportation Management System (TMS) elements, upgrade safety devices, and improve highway worker safety

12-0V250 Ora-133-PM 8.5/13.4, Ora 241- PM 20.4/36.7

Lake Forest, Orange County

Apply methacrylate treatment, replace joint seals and bearing pads, overlay polyester concrete, and install deck drainage system

12-0K9704 Ora-241-PM 36.1/39.12, Ora-91-PM 14.7/18.9, Riv-91-PM 0.0/1.5

Anaheim Yorba Linda, Corona

Provide express lanes connector between Sr-

241 & SR-91

Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.

Replace section 5-1.26 with:

5-1.26 GRADE QUALITY CONTROL

Use a global navigation satellite system (GNSS) rover, robotic total station equipment, or a level to check the grades at the frequencies shown in the following table:

Grade Checking Requirements

Type of work Area or distance represented by the grade checking Frequency

(number of grade points) Earthwork for cut and fill slopes ≤15 feet 200 feet 2 Earthwork for cut and fill slopes ˃15 feet 1,000 sq yd 1 Rough grading 1,000 sq yd 1 Trenching 100 feet 6 Subgrade 1 mi 30 Subbase layer 1 mi 50 Base layer 1 mi 100 Curb and gutter 100 feet 6 Concrete barrier 100 feet 5 Finishing roadway 1,000 sq yd 2

Increase the frequency of grade checking of a roadway:

1. Wherever its curve radius is 500 feet or less

2. In areas of a superelevation transition

3. At intersections

Notify the Engineer when an area is ready for line and grade inspection. Submit the grade checking results on a Grade Checking Report form as an informational submittal.

Add to the end of section 5-1.32:

Personal vehicles of your employees must not be parked on the traveled way or shoulders, including sections closed to traffic.

The following Freeway Lease Area locations are currently leased and occupied by Caltrans lessees

11. Wireless Telecommunications tower and enclosed equipment area located on North Bound SR- 241 at Post Mile 34.3 (Freeway Lease Area 12-ORA-241-9021)

12. Wireless Telecommunications tower and enclosed equipment area located on South Bound SR- 241 at Post Mile 30.7 (Freeway Lease Area 12-ORA-241-9031)

13. Wireless Telecommunications tower and enclosed equipment area located on South Bound SR- 241 at Post Mile 29.1 (Freeway Lease Area 12-ORA-241-9041)

Do not interfere with lessees’ operations and activities in their respective leased areas.

Contractor can obtain copies of the Freeway Lease Area Maps at the District 12 Office of Right of Way.

Add between the 6th and 7th paragraph of section 5-1.43E(1)(a):

DRA and DRB meetings may be held either virtually or on-site at the job location upon mutual agreement by the Contractor, the Department, and the DRA or DRB.

DRA and DRB meetings include:

1. Initial project meeting

2. Progress meetings

3. Dispute meetings

On-site meetings are held at a physical location and include on-site time, travel time, transportation, lodging, and incidentals for each day or portion thereof.

Virtual meeting includes virtual meeting time, equipment, and incidentals for each hour or portion thereof, either all or part of the DRA and DRB members, with the following requirements:

1. Obtain authorization for virtual meeting 14 days before the meeting

2. Use of Webex, Zoom or MS Teams virtual platforms

Obtain authorization for DRA or DRB members before spending any time on DRA- or DRB- related tasks.

Hourly off-site DRA and DRB related tasks include reviewing the plans, specifications, evaluating positions, preparing recommendations, completing forms, or performing any other off-site DRA- or DRB-related tasks.

Replace section 5-1.43E(1)(i) with:

5-1.43E(1)(i) Payment Pay the DRA or each DRB member for meeting participation as follows:

1. $250 per hour for agreed hourly off-site DRA- or DRB-related tasks

2. For attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or

DRB-related tasks rate

3. $2,500 per day for each on-site meeting

Department does not pay for (1) DRA- or DRB-work performed after Contract acceptance or (2) cost of preparing for or attending ADR meetings.

The Department pays:

1. $250 per hour for agreed off-site DRA- or DRB-related tasks

2. For each DRA or DRB member attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or DRB-related tasks rate

3. $2,500 per DRA on-site meeting

4. Up to $7,500 per DRB on-site meeting

Payment is full compensation for each meeting and off-site DRA- or DRB-related tasks.

The Department does not adjust the unit price for an increase or decrease in the quantity of:

1. DRA on site meeting

2. DRB on site meeting

3. Hourly off-site DRA- or DRB-related task

Within 60 days of receipt of Department's payment, submit copies of associated invoices and supporting documents in the form of a canceled check or bank statement for DRA- or DRB-payment verification.

6 CONTROL OF MATERIALS

Add to end of section 6-1.01:

If you fail to submit the form for materials subject to Buy America, the Department may:

1. Withhold from the next progress payment

2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products

Replace section 6-1.03B with:

6-1.03B Submittals 6-1.03B(1) General Not Used

6-1.03B(2) Work Plan For local material, such as rock, gravel, earth, structure backfill, pervious backfill, imported borrow, and culvert bedding, obtained from a (1) noncommercial source, or (2) source not regulated under California jurisdiction, submit a local material plan for each material at least 60 days before placing the material. The local material plan must include:

1. Certification signed by you and an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:

I am aware local material from a noncommercial source or a source not regulated under CA jurisdiction must be sampled and analyzed for pH and lead and may require sampling and analysis under section 6-1.03B(3) for other constituents of concern based on the land use history. I am aware that local material sources must not contain ADL at concentrations greater than 80 mg/kg total lead or equal to or greater than 5 mg/L soluble lead as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II. I am aware that a maximum quantity of material may be excavated at the site based on the minimum number of samples taken before excavating at the site under section 6-1.03B(3).

2. Land use history of the local material location and surrounding property

3. Sampling protocol

4. Number of samples per volume of local material

5. QA and QC requirements and procedures

6. Qualifications of sampling personnel

7. Stockpile history

8. Name and address of the analytical laboratory that will perform the chemical analyses

9. Analyses that will be performed for lead and pH

10. Other analyses that will be performed for possible hazardous constituents based on:

10.1. Source property history

10.2. Land use adjacent to source property

10.3. Constituents of concern in the ground water basin where the job site is located

The plan must be sealed and signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State.

If the plan requires revisions, the Engineer provides comments. Submit a revised plan within 7 days of receiving comments. Allow 7 days for the review.

6-1.03B(3) Analytical Test Results At least 15 days before placing local material, submit analytical test results for each local material obtained from a noncommercial source or a source not regulated under CA jurisdiction. The analytical test results must include:

1. Certification signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:

The analytical testing described in the local material plan has been performed. I performed a statistical analysis of the test results using the US EPA's ProUCL software with the applicable 95 percent upper confidence limit. I certify that the material from the local material source is suitable for unrestricted use at the job site, it has a pH above 5.0, does not contain soluble lead in concentrations equal to or greater than 5mg/l as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II, does not contain lead in concentrations above 80 mg/kg total lead, is free from all other contaminants identified in the local material plan, and will comply with the job site's basin plan and water quality objectives of the RWQCB.

2. Chain of custody of samples

3. Analytical results no older than 1 year

4. Statistical analysis of the data using US EPA’s ProUCL software with a 95 percent upper confidence limit

5. Comparison of sample results to hazardous waste concentration thresholds and the RWQCB's basin plan requirements and water quality objectives for the job site location

6-1.03B(4) Sample and Analysis Sample and analyze local material from a (1) noncommercial source or (2) a source not regulated under CA jurisdiction:

1. Before bringing the local material to the job site

2. As described in the local material plan

3. Under US EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods (SW-846)

The sample collection must be designed to generate a data set representative of the entire volume of proposed local material.

Before excavating at the (1) noncommercial material source or (2) a source not regulated under CA jurisdiction, collect the minimum number of samples and perform the minimum number of analytical tests for the corresponding maximum volume of local material as shown in the following table:

Minimum Number of Samples and Analytical Tests for Local Material Maximum volume of imported borrow

(cu yd) Minimum number of samples and analytical tests

< 5,000 8

5,000–10,000 12 for the first 5,000 cu yd plus 1 for each additional 1,000 cu yd or portion thereof

10,000–20,000 17 for the first 10,000 cu yd plus 1 for each additional 2,500 cu yd or portion thereof

20,000-40,000 21 for the first 20,000 cu yd plus 1 for each additional 5,000 cu yd or portion thereof

40,000–80,000 25 for the first 40,000 cu yd plus 1 for each additional 10,000 cu yd or portion thereof

> 80,000 29 for the first 80,000 cu yd plus 1 for each additional 20,000 cu yd or portion thereof

Do not collect composite samples or mix individual samples to form a composite sample.

Analyze the samples using the US EPA's ProUCL software with a 95 percent upper confidence limit. All chemical analysis must be performed by a laboratory certified by the SWRCB's Environmental Laboratory Accreditation Program (ELAP).

The analytical test results must demonstrate that the local material:

1. Is not a hazardous waste

2. Has a pH above 5.0

3. Has an average total lead concentration, based upon the 95 percent upper confidence limit, at or below 80 mg/kg

4. Is free of possible contaminants identified in the local material plan

5. Complies with the RWQCB's basin plan for the job site location 6 Complies with the RWQCB's water quality objectives for the job site location

6-1.03C Local Material Management Do not place local material until authorized.

If the Engineer determines the appearance, odor, or texture of any delivered local material suggests possible contamination, sample and analyze the material. The sampling and analysis is change order work unless (1) hazardous waste is discovered or (2) the analytical test results indicate the material does not comply with section 6-1.03B(3).

Dispose of noncompliant local material at an appropriately permitted CA Class I, CA Class II or CA Class III facility. You are the generator of noncompliant local materials.

Replace section 6-1.04 with:

6-1.04 BUY AMERICA

6-1.04A General Buy America requirements do not apply to the following:

1. Tools and construction equipment used in performing the work.

2. Temporary work that is not incorporated into the finished project.

An article, material, or supply to be permanently incorporated in the project should only be classified into one of the following categories:

1. Iron or steel products

2. Manufactured products

3. Construction materials

4. Excluded materials

Excluded materials means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.

6-1.04B Crumb Rubber (Pub Res Code § 42703(d)) Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:

1. Produced in the United States

2. Derived from waste tires taken from vehicles owned and operated in the United States

6-1.04C Iron or Steel Products Iron or steel products must be melted and manufactured in the United States except:

1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials

2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total bid or $2,500, the material may be used if authorized

Furnish iron or steel products to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured.

All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.

6-1.04D Manufactured Products Manufactured products mean articles, materials, or supplies that have been:

1. Processed into a specific form and shape; or

2. Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies

Per 23 CFR 635.410, these products must be manufactured in the United States.

Manufacturer, in the case of manufactured products, means the entity that performs the final manufacturing process by bringing individual elements together that produces a manufactured product.

If an item is classified as an iron or steel product, a construction material, or an excluded material under the definitions set forth under this Buy America section, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under this Buy America section may include components that are construction materials, iron or steel products, or excluded materials.

Iron or steel used in precast concrete manufactured products or enclosures for Intelligent Transportation Systems (ITS) must meet the requirements of section 6-1.04C regardless of the amount used.

Iron or steel used in other manufactured products must meet the requirements of section 6-1.04C if the cost of steel and iron components is 50 percent or more of the total cost of the manufactured product.

Furnish manufactured products to be incorporated into the work with certificates of compliance with each project delivery. The manufacturer's certificate of compliance must identify where the manufacturing occurred and attest specifically to compliance with the 23 CFR 635.410 standard.

6-1.04E Construction Materials The following construction materials must be produced in the United States under standards in 2 CFR 184.6:

1. Non-ferrous metals

2. Plastic and polymer-based products such as:

2.1. Polyvinylchloride

2.2. Composite building materials

3. Glass

4. Fiber optic cable including drop cable

5. Optical fiber

6. Lumber

7. Engineered wood

8. Drywall

All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.

Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to compliance with the 2 CFR 184.6 standard.

Minor additions of articles, materials, supplies, or binding agents to these construction materials do not change the categorization of the construction material.

6-1.04F Buy America Waiver for the De Minimis Costs for Manufactured Products and Construction Materials A De Minimis Costs waiver can waive the application of FHWA's Buy America requirements for manufactured products and construction materials under a single project when the total cost of non-compliant manufactured products and construction materials is no more than the lesser of $1,000,000 or 5 percent of the total applicable costs for the project.

The percentage threshold is calculated based on the following formula:

X = NC / TA

where:

X = percent threshold NC = total cost of non-compliant construction materials and manufactured products TA = total applicable project costs (steel, iron, construction materials and manufactured products;

does not include excluded materials)

This threshold is based on the actual cost of the steel, iron, construction materials, and manufactured products, not the anticipated cost of those materials.