FY26 DAPS Helium Trailer Certification

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$500,000 to $1,000,000
Set-aside
Total Small Business

Forecast facts

Anticipated award
Through
NAICS code
336212 Truck Trailer Manufacturing
Place of performance
Creedmoor, NC
Forecast number
F2026072991
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The Department of Homeland Security Customs and Border Protection is forecasting a new requirement for helium trailer certification and rehabilitation services. The contractor will perform rehabilitation and requalification of pressure vessels through either a Minimal Scope approach (periodic requalification with limited rehabilitation) or a Full Scope approach (periodic requalification with complete disassembly and full refurbishment). Key requirements include detailed receiving records with photographs, work order documentation, purging and venting procedures, chassis/frame refurbishment through grit blasting, USDOT tube requalification per Title 49 CFR standards, manifold inspection and testing, reassembly with proper tube tracking, pressurization and leak testing for both high and low-pressure tubes, and final quality assurance inspection. The solicitation is estimated to be released on April 3, 2026, with an anticipated award date of June 1, 2026.

The estimated award value ranges from $500,000 to $1,000,000 under a Firm Fixed Price contract vehicle with a performance period extending from June 1, 2026, through May 31, 2031. This procurement is set aside for total small business and will be performed in Creedmoor, North Carolina. For inquiries regarding requirements and technical questions, contact Chadwick Myers at chadwick.myers@cbp.dhs.gov or (202) 360-7364, with Hazel Russell available as the alternate contact at hazel.russell@cbp.dhs.gov or (202) 499-0042. Small business coordination inquiries should be directed to David K. Harrod at David.K.Harrod@cbp.dhs.gov or (202) 553-6456.

Forecast text

The contractor shall perform rehabilitation and requalification. The two-scope approach includes the following:

Minimal Scope – Consisting of periodic requalification of pressure vessels and limited or minimal rehab.

Full Scope – Consisting of periodic requalification of pressure vessels and complete disassembly for full rehab / refurbishment based on customer requirements.

The Contractor shall provide the specific and ad-hoc tasks in support of program requirements and IAW contractor SOP in the following areas below. Contractor needs to define the steps undertaken to include timelines associated with performing the task from receipt of trailer to return to government.

A. RECEIVING RECORD

Upon arrival at a retest facility, a detailed receiving record shall be filled out recording the current condition of the equipment and any damaged or missing equipment. Photographs shall be taken of both ends, sides, and interior cabinets showing proof of received condition and equipment which shall be included in the permanent file.

B. WORK ORDER

After completion of visual inspection, Work Orders (WO) shall be created with details work performed and material used to include lot numbers, serial numbers and batch information in order to track any possible component quality issues.

C. PURGING AND VENTING

All units will be received purged and blanketed under a maximum of 30-psi inert gas unless arrangement/notification has been made prior to receipt.

D. DISASSEMBLY

Equipment will undergo Full Scope or Minimal Scope rehabilitation.

E. CHASSIS/FRAME REFURBISHMENT

Chassis/frame shall be grit blasted to gray metal followed by visually inspecting all electrical, pneumatic, mechanical, and structural components for damage, wear, distortion, or any other forms of potential failure.

F. USDOT TUBE REQUALIFICATION

Tubes shall be hydrostatically, ultrasonic emission, and/or acoustic emissions tested in accordance with most current publication of Title 49 CFR, CGA Publication C-1, CGA Publication C-18, or applicable USDOT exemption (i.e. DOT-SP 12629).

G. MANIFOLD INSPECTION AND TEST

1. The manifold and its accessories shall be inspected and reconditioned as required prior to reassembly. The manifold shall be free of structural defects and leakage.

H. REASSEMBLY

1. Tubes shall be reassembled to the proper chassis/frame using webbing, to prevent metal-to-metal contact.

2. Tube location chart shall be made noting each tube by serial number and location.

3. Decals shall be applied in accordance with customer specification and USDOT regulations.

I. PRESSURIZATION/LEAK TEST AND MOISTURE

1.High Pressure Tubes (HPT) (900 PSI OR ABOVE)

The manifold shall be installed, all valves closed and pressurized to 1.25 times working pressure.

2. Low Pressure Tubes(LPT) (LESS THAN 900 PSI)

The tubes shall be pressurized to maximum working pressure or 100 psi.

3.The test gas shall be vented to a positive residual pressure of 20 psig before the unit is shipped.

J. FINAL INSPECTION

1. Quality Assurance shall conduct final inspection and shall be recorded on the final inspection checklist, WG-107.

2. Test and inspection reports shall be maintained in the permanent work order file and copied to customer via electronic transmission