UT FLAP 73(1), La Sal Mountain Loop Road
Awarded Award Notice Posted
- Solicitation number
- DTFH6816B00025
- Agency
- Federal Highway Administration Department of Transportation
- Awarded
- to Staker & Parson Companies
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH6817C00002 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Grand and San Juan Counties, Utah 84532, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Aug 17, 2016 5:17 pm Modified: Sep 01, 2016 6:21 pmTrack Changes
THIS PROJECT WILL BE ADVERTISED ON AN UNRESTRICTED (FULL AND OPEN) COMPETITION.
PROJECT DETAILS: UT FLAP 73(1), La Sal Mountain Loop Road
This project in includes reconstruction of a 10.83 miles roadway reconstruction on County Road 73, otherwise called La Sal Mountain Loop Road located in Grand and San Juan Counties, Utah.
Type of Construction: grading, MSE Retaining walls, culverts, concrete headwalls, and riprap, aggregate base course, and paving, traffic control, public information
This project consists of:
Schedule A: Phased Construction of 9.08 miles of roadway reconstruction and paving.
Significant Items for Schedule A Include: 2,000 LF of fiber rolls; 40,000 CY of roadway excavation; 500 subexcavation; 600 cuyd of riprap; 18,600 sqft of mechanically stabilized earth wall; 39,300 tons of aggregate base; 17,820 tons of hot asphalt paving; 3,490 LF of pipe culvert placement; 1,450 LF of guardrail; hydraulic seeding 23 acre; 71.0 miles of pavement markings; 1,120 flagger hours
Option X: Phased Construction of 3.21 miles of roadway reconstruction and paving.
Significant Items for Option X Include: 625 LF of fiber rolls; 56,800 CY of roadway excavation; 35,400 cuyd excavation waste; 160 cuyd of riprap; 16,0000 tons of aggregate base; 7,300 tons of hot asphalt paving; 1,090 LF of pipe culvert placement; hydraulic seeding 15 acre; 5.0 miles of pavement markings; 480 flagger hours.
Estimated total cost for Schedule A and Option X is $9 to $15 million.
Update #1 ·
Added: Aug 17, 2016 5:17 pm
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE NOT YET AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE IS SEPTEMBER 1, 2016. THIS PROJECT WILL BE ADVERTISED ON AN UNRESTRICTED (FULL AND OPEN) COMPETITION.
PROJECT DETAILS: UT FLAP 73(1), La Sal Mountain Loop Road
This project in includes reconstruction of a 10.83 miles roadway reconstruction on County Road 73, otherwise called La Sal Mountain Loop Road located in Grand and San Juan Counties, Utah.
Type of Construction: grading, MSE Retaining walls, culverts, concrete headwalls, and riprap, aggregate base course, and paving, traffic control, public information
This project consists of:
Schedule A: Phased Construction of 9.08 miles of roadway reconstruction and paving.
Significant Items for Schedule A Include: 2,000 LF of fiber rolls; 40,000 CY of roadway excavation; 500 subexcavation; 600 cuyd of riprap; 18,600 sqft of mechanically stabilized earth wall; 39,300 tons of aggregate base; 17,820 tons of hot asphalt paving; 3,490 LF of pipe culvert placement; 1,450 LF of guardrail; hydraulic seeding 23 acre; 71.0 miles of pavement markings; 1,120 flagger hours
Option X: Phased Construction of 3.21 miles of roadway reconstruction and paving.
Significant Items for Option X Include: 625 LF of fiber rolls; 56,800 CY of roadway excavation; 35,400 cuyd excavation waste; 160 cuyd of riprap; 16,0000 tons of aggregate base; 7,300 tons of hot asphalt paving; 1,090 LF of pipe culvert placement; hydraulic seeding 15 acre; 5.0 miles of pavement markings; 480 flagger hours.
Estimated total cost for Schedule A and Option X is $9 to $15 million.
Attachments
| File | Type | Posted |
|---|---|---|
| Option_X_Bid_Tabs.pdf | ||
| Schedule_A_Bid_Tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| La_Sal_Mountain_Loop_Road_Q A.pdf | ||
| UT.FLAP.73(1).LaSal_Mtn_Loop.Geotech.2016.pdf | ||
| Cross-sections.pdf | ||
| Plans.pdf | ||
| DTFH6816B00025.pdf |