La_Sal_Mountain_Loop_Road_Q A.pdf
PDF 102 KB Posted
- Attached to
- UT FLAP 73(1), La Sal Mountain Loop Road Federal contract opportunity
- Solicitation number
- DTFH6816B00025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Option_X_Bid_Tabs.pdf | ||
| Schedule_A_Bid_Tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| UT.FLAP.73(1).LaSal_Mtn_Loop.Geotech.2016.pdf | ||
| Cross-sections.pdf | ||
| Plans.pdf | ||
| DTFH6816B00025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTFH6816B 9/29/2016
UT FLAP 73(1)
La Sal Mountain Loop Road
1. Q: I was wondering if a Redi-Rock would be considered as an alternative for the retaining wall.
A: Once the contract has been awarded, contact the prime contractor and have them submit a value engineering cost proposal for the use of Redi-Rock as an alternative.
2. Q: I cannot find any wire sizing or aperture requirements for the facing baskets (FHWA tends to have nonstandard requirements on baskets and struts). I also need to know if the baskets are galvanized or black wire. There is a wire mesh facing panel also detailed, but there are no specific specifications.
A: See Sheet Number G8 of the plans, note 6.
3. Q: Can the existing asphalt road be broken up and placed in the embankment?
A: Yes
4. Q: Is there a water source that we will be able to use while on this project?
A: There is no Government furnished water source.
5. Q: On sheet 257-A, bottom right detail, is the “return” shown required for EVERY vertical step in the wall? or only at the wall ends as typical?
A: The “basket return” is required on every vertical step on the MSE wall.