La_Sal_Mountain_Loop_Road_Q A.pdf

PDF 102 KB Posted

Attached to
UT FLAP 73(1), La Sal Mountain Loop Road Federal contract opportunity
Solicitation number
DTFH6816B00025
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to UT FLAP 73(1), La Sal Mountain Loop Road, newest first.
File Type Posted
Option_X_Bid_Tabs.pdf PDF
Schedule_A_Bid_Tabs.pdf PDF
Bid_Opening_Summary.pdf PDF
UT.FLAP.73(1).LaSal_Mtn_Loop.Geotech.2016.pdf PDF
Cross-sections.pdf PDF
Plans.pdf PDF
DTFH6816B00025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTFH6816B 9/29/2016

UT FLAP 73(1)

La Sal Mountain Loop Road

1. Q: I was wondering if a Redi-Rock would be considered as an alternative for the retaining wall.

A: Once the contract has been awarded, contact the prime contractor and have them submit a value engineering cost proposal for the use of Redi-Rock as an alternative.

2. Q: I cannot find any wire sizing or aperture requirements for the facing baskets (FHWA tends to have nonstandard requirements on baskets and struts). I also need to know if the baskets are galvanized or black wire. There is a wire mesh facing panel also detailed, but there are no specific specifications.

A: See Sheet Number G8 of the plans, note 6.

3. Q: Can the existing asphalt road be broken up and placed in the embankment?

A: Yes

4. Q: Is there a water source that we will be able to use while on this project?

A: There is no Government furnished water source.

5. Q: On sheet 257-A, bottom right detail, is the “return” shown required for EVERY vertical step in the wall? or only at the wall ends as typical?

A: The “basket return” is required on every vertical step on the MSE wall.