Schedule_A_Bid_Tabs.pdf
PDF 71 KB Posted
- Attached to
- UT FLAP 73(1), La Sal Mountain Loop Road Federal contract opportunity
- Solicitation number
- DTFH6816B00025
About this file
Schedule A Bid Tabs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Option_X_Bid_Tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| La_Sal_Mountain_Loop_Road_Q A.pdf | ||
| UT.FLAP.73(1).LaSal_Mtn_Loop.Geotech.2016.pdf | ||
| Cross-sections.pdf | ||
| DTFH6816B00025.pdf | ||
| Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S
Schedule A Total of Bid Items: 8,823,230.00$ 14.1% 10,067,722.08$ -15.4% 7,460,457.70$ -18.7% 7,172,914.90$ 0.6% 8,871,809.00$ 14.4% 10,095,329.07$ Project No: UT UT FLAP 73(1)
UT La Sal Mountain Loop Road Project Name: La Sal Mountain Loop Road
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 903,840.00$ 903,840.00$ 940,000.00$ 720,000.00$ 931,000.00$ 1,150,000.00$ 824,000.00$
15214-2000 Line A0040 ALL LPSM 35,000.00$ 35,000.00$ 3,010.00$ 4,500.00$ 5,175.00$ 12,000.00$ 3,024.00$
15215-1000 Line A0060 20 EACH 700.00$ 14,000.00$ 29,600.00$ 8,600.00$ 6,900.00$ 30,000.00$ 29,760.00$
15215-3000 Line A0080 69 EACH 400.00$ 27,600.00$ 56,511.00$ 24,150.00$ 29,756.25$ 124,200.00$ 56,718.00$
15215-7000 Line A0100 3 EACH 1,800.00$ 5,400.00$ 8,970.00$ 3,210.00$ 2,587.50$ 9,000.00$ 9,000.00$
15225-0000 Line A0120 7.617 MILE 5,000.00$ 38,085.00$ 25,821.63$ 27,421.20$ 26,576.47$ 79,978.50$ 69,924.06$
15236-2000 Line A0140 15.235 MILE 5,000.00$ 76,175.00$ 26,965.95$ 47,228.50$ 13,140.19$ 7,617.50$ 120,844.02$
15301-0000 Line A0160 ALL LPSM 86,400.00$ 86,400.00$ 255,500.00$ 250,000.00$ 189,117.28$ 475,000.00$ 281,916.69$
15401-0000 Line A0180 ALL LPSM 259,200.00$ 259,200.00$ 68,100.00$ 250,000.00$ 146,000.00$ 125,000.00$ 296,665.00$
15501-0000 Line A0200 ALL LPSM 7,000.00$ 7,000.00$ 15,800.00$ 5,000.00$ 5,988.54$ 20,000.00$ 21,600.00$
15705-0100 Line A0220 12,800 LNFT 4.00$ 51,200.00$ 24,320.00$ 40,960.00$ 35,072.00$ 217,600.00$ 67,840.00$
15705-1400 Line A0240 2,200 LNFT 5.00$ 11,000.00$ 7,700.00$ 11,000.00$ 9,988.00$ 22,000.00$ 34,760.00$
15706-0200 Line A0260 230 EACH 140.00$ 32,200.00$ 23,690.00$ 52,900.00$ 34,534.50$ 41,400.00$ 90,850.00$
15706-1600 Line A0280 2 EACH 2,500.00$ 5,000.00$ 3,940.00$ 4,800.00$ 3,392.88$ 1,000.00$ 7,890.00$
15802-0000 Line A0300 ALL LPSM 35,000.00$ 35,000.00$ 434,000.00$ 200,000.00$ 117,491.51$ 758,600.00$ 100,940.00$
20101-0000 Line A0320 54.0 ACRE 2,000.00$ 108,000.00$ 137,160.00$ 205,200.00$ 188,373.60$ 108,000.00$ 254,880.00$
20301-0600 Line A0340 5 EACH 1,500.00$ 7,500.00$ 5,300.00$ 3,500.00$ 6,287.45$ 10,000.00$ 25,000.00$
20301-1100 Line A0360 5 EACH 500.00$ 2,500.00$ 1,090.00$ 675.00$ 840.05$ 500.00$ 1,635.00$
20301-1900 Line A0380 65 EACH 500.00$ 32,500.00$ 44,980.00$ 44,200.00$ 46,120.10$ 6,500.00$ 118,950.00$
20301-2400 Line A0400 8 EACH 200.00$ 1,600.00$ 1,168.00$ 1,280.00$ 1,792.16$ 400.00$ 1,440.00$
20302-0700 Line A0420 225 LNFT 10.00$ 2,250.00$ 810.00$ 1,215.00$ 1,260.00$ 450.00$ 1,192.50$
20401-0000 Line A0440 40,000 CUYD 13.00$ 520,000.00$ 560,000.00$ 720,000.00$ 292,400.00$ 360,000.00$ 852,000.00$
20402-0000 Line A0460 500 CUYD 50.00$ 25,000.00$ 7,750.00$ 28,000.00$ 7,065.00$ 12,500.00$ 25,500.00$
20403-0000 Line A0480 10,400 CUYD 15.00$ 156,000.00$ 530,400.00$ 135,200.00$ 298,064.00$ 41,600.00$ 176,800.00$
20425-1000 Line A0500 90 LNFT 25.00$ 2,250.00$ 1,395.00$ 3,600.00$ 678.60$ 1,800.00$ 2,250.00$
20811-0000 Line A0520 13,500 SQFT 35.00$ 472,500.00$ 567,000.00$ 13,500.00$ 135.00$ 3,375.00$ 53,325.00$
25101-2200 Line A0540 460 CUYD 70.00$ 32,200.00$ 37,950.00$ 39,100.00$ 23,073.60$ 69,000.00$ 91,080.00$
25101-2300 Line A0560 43 CUYD 180.00$ 7,740.00$ 4,300.00$ 3,354.00$ 3,209.09$ 6,450.00$ 10,320.00$
25101-2400 Line A0580 55 CUYD 115.00$ 6,325.00$ 4,427.50$ 4,290.00$ 4,116.20$ 8,250.00$ 13,200.00$
25201-1000 Line A0600 200 CUYD 400.00$ 80,000.00$ 21,200.00$ 16,400.00$ 15,508.00$ 30,000.00$ 10,200.00$
25501-1000 Line A0620 18,600 SQFT 65.00$ 1,209,000.00$ 1,143,900.00$ 837,000.00$ 1,131,624.00$ 1,058,340.00$ 1,060,200.00$
30101-0000 Line A0640 39,300 TON 35.00$ 1,375,500.00$ 1,513,050.00$ 943,200.00$ 819,798.00$ 822,156.00$ 1,336,200.00$
40101-5600 Line A0660 17,820 TON 100.00$ 1,782,000.00$ 1,924,560.00$ 1,158,300.00$ 1,454,468.40$ 1,782,000.00$ 1,978,020.00$
SURVEY AND STAKING, DRAINAGE STRUCTURE
819.00$ 350.00$ 431.25$ 1,800.00$ 822.00$
SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE
AGGREGATE BASE
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
MOBILIZATION
SURVEY AND STAKING, RETAINING WALL
SURVEY AND STAKING, APPROACH ROAD
CLEARING AND GRUBBING
REMOVAL OF CATTLE GUARD
REMOVAL OF GATE
SURVEY CONTROL, GRADE FINISHING
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
DITCH, EXCAVATION
SHORING AND BRACING
PLACED RIPRAP, METHOD B, CLASS 2
PLACED RIPRAP, METHOD B, CLASS 3
PLACED RIPRAP, METHOD B, CLASS 4
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF FENCE
ROADWAY EXCAVATION
SUBEXCAVATION
UNCLASSIFIED BORROW
SURVEY AND STAKING, PARKING AREA
SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
WATERING FOR DUST CONTROL
720,000.00$ 931,000.00$ 1,150,000.00$ w Valley Contractors Inc. DBA ACC Sou W.W. Clyde & Co. on Company DBA Nielson Constructionown Brothers Construction Company, I A&S Construction Co.
3,010.00$
940,000.00$
2,990.00$ 1,070.00$ 862.50$ 3,000.00$ 3,000.00$
824,000.00$
4,500.00$ 5,175.00$ 12,000.00$ 3,024.00$
1,480.00$ 430.00$ 345.00$ 1,500.00$ 1,488.00$
255,500.00$ 250,000.00$ 189,117.28$ 475,000.00$ 281,916.69$
1,770.00$ 3,100.00$ 862.50$ 500.00$ 7,932.00$
3,390.00$ 3,600.00$ 3,489.10$ 10,500.00$ 9,180.00$
15,800.00$ 5,000.00$ 5,988.54$ 20,000.00$ 21,600.00$
68,100.00$ 250,000.00$ 146,000.00$ 125,000.00$ 296,665.00$
3.50$ 5.00$ 4.54$ 10.00$ 15.80$
1.90$ 3.20$ 2.74$ 17.00$ 5.30$
1,970.00$ 2,400.00$ 1,696.44$ 500.00$ 3,945.00$
103.00$ 230.00$ 150.15$ 180.00$ 395.00$
2,540.00$ 3,800.00$ 3,488.40$ 2,000.00$ 4,720.00$
434,000.00$ 200,000.00$ 117,491.51$ 758,600.00$ 100,940.00$
218.00$ 135.00$ 168.01$ 100.00$ 327.00$
1,060.00$ 700.00$ 1,257.49$ 2,000.00$ 5,000.00$
146.00$ 160.00$ 224.02$ 50.00$ 180.00$
692.00$ 680.00$ 709.54$ 100.00$ 1,830.00$
14.00$ 18.00$ 7.31$ 9.00$ 21.30$
3.60$ 5.40$ 5.60$ 2.00$ 5.30$
51.00$ 13.00$ 28.66$ 4.00$ 17.00$
15.50$ 56.00$ 14.13$ 25.00$ 51.00$
42.00$ 1.00$ 0.01$ 0.25$ 3.95$
15.50$ 40.00$ 7.54$ 20.00$ 25.00$
100.00$ 78.00$ 74.63$ 150.00$ 240.00$
82.50$ 85.00$ 50.16$ 150.00$ 198.00$
106.00$ 82.00$ 77.54$ 150.00$ 51.00$
80.50$ 78.00$ 74.84$ 150.00$ 240.00$
38.50$ 24.00$ 20.86$ 20.92$ 34.00$
61.50$ 45.00$ 60.84$ 56.90$ 57.00$
108.00$ 65.00$ 81.62$ 100.00$ 111.00$
Engineer's Estimate
Schedule A Total of Bid Items: 8,823,230.00$ 14.1% 10,067,722.08$ -15.4% 7,460,457.70$ -18.7% 7,172,914.90$ 0.6% 8,871,809.00$ 14.4% 10,095,329.07$ Project No: UT UT FLAP 73(1)
UT La Sal Mountain Loop Road Project Name: La Sal Mountain Loop Road
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount w Valley Contractors Inc. DBA ACC Sou W.W. Clyde & Co. on Company DBA Nielson Constructionown Brothers Construction Company, I A&S Construction Co.Engineer's Estimate
40105-3000 Line A0680 178 TON 240.00$ 42,720.00$ 66,928.00$ 50,730.00$ 52,371.16$ 62,300.00$ 49,128.00$
40601-0000 Line A0700 45 TON 480.00$ 21,600.00$ 23,670.00$ 13,950.00$ 18,490.50$ 22,500.00$ 62,730.00$
41102-1000 Line A0720 109,000 SQYD 1.25$ 136,250.00$ 118,810.00$ 30,520.00$ 92,650.00$ 109,000.00$ 102,460.00$
41105-0000 Line A0740 140 TON 30.00$ 4,200.00$ 6,510.00$ 8,540.00$ 5,108.60$ 7,000.00$ 16,590.00$
41201-0000 Line A0760 47 TON 600.00$ 28,200.00$ 20,210.00$ 12,549.00$ 15,793.41$ 18,800.00$ 62,698.00$
41801-1000 Line A0780 50 SQYD 150.00$ 7,500.00$ 5,400.00$ 6,750.00$ 4,213.00$ 7,500.00$ 13,425.00$
60103-0220 Line A0800 2 EACH 10,000.00$ 20,000.00$ 25,400.00$ 40,000.00$ 26,760.46$ 60,000.00$ 31,560.00$
60201-0600 Line A0820 230 LNFT 75.00$ 17,250.00$ 17,825.00$ 21,390.00$ 19,062.40$ 14,030.00$ 30,705.00$
60201-0800 Line A0840 2,850 LNFT 90.00$ 256,500.00$ 203,775.00$ 236,550.00$ 270,151.50$ 210,900.00$ 490,200.00$
60201-0900 Line A0860 330 LNFT 120.00$ 39,600.00$ 34,320.00$ 36,960.00$ 32,046.30$ 30,030.00$ 72,930.00$
60201-1200 Line A0880 80 LNFT 160.00$ 12,800.00$ 9,760.00$ 17,120.00$ 12,050.40$ 11,120.00$ 21,760.00$
60210-0600 Line A0900 12 EACH 420.00$ 5,040.00$ 7,524.00$ 4,872.00$ 2,841.48$ 4,800.00$ 7,752.00$
60210-0800 Line A0920 118 EACH 350.00$ 41,300.00$ 84,370.00$ 57,230.00$ 37,039.02$ 70,800.00$ 106,200.00$
60210-0900 Line A0940 7 EACH 550.00$ 3,850.00$ 7,350.00$ 5,516.00$ 4,305.84$ 9,625.00$ 10,157.00$
60212-0800 Line A0960 3 EACH 500.00$ 1,500.00$ 1,539.00$ 1,833.00$ 1,584.09$ 750.00$ 3,337.50$
60212-0900 Line A0980 1 EACH 900.00$ 900.00$ 648.00$ 652.00$ 566.57$ 275.00$ 1,563.00$
60501-0000 Line A1000 500 LNFT 35.00$ 17,500.00$ 23,750.00$ 24,000.00$ 11,895.00$ 25,000.00$ 49,500.00$
60704-0000 Line A1020 1 EACH 2,500.00$ 2,500.00$ 884.00$ 2,750.00$ 1,760.40$ 5,000.00$ 6,575.00$
61701-1500 Line A1040 1,413 LNFT 35.00$ 49,455.00$ 32,499.00$ 33,912.00$ 36,088.02$ 46,629.00$ 50,161.50$
61702-0800 Line A1060 2 EACH 3,500.00$ 7,000.00$ 5,680.00$ 5,000.00$ 5,320.46$ 5,000.00$ 6,840.00$
61901-0000 Line A1080 155 LNFT 10.00$ 1,550.00$ 10,540.00$ 5,890.00$ 2,039.80$ 3,100.00$ 1,023.00$
61902-0000 Line A1100 5 EACH 2,500.00$ 12,500.00$ 9,950.00$ 13,500.00$ 5,600.50$ 4,000.00$ 10,000.00$
61903-0800 Line A1120 5 EACH 15,000.00$ 75,000.00$ 101,500.00$ 145,000.00$ 90,166.05$ 140,000.00$ 85,000.00$
62201-0200 Line A1140 40 HOUR 120.00$ 4,800.00$ 5,040.00$ 4,720.00$ 3,808.40$ 800.00$ 5,080.00$
62201-0550 Line A1160 40 HOUR 150.00$ 6,000.00$ 4,520.00$ 4,320.00$ 3,470.40$ 4,000.00$ 6,080.00$
62201-0950 Line A1180 40 HOUR 130.00$ 5,200.00$ 5,720.00$ 5,280.00$ 4,472.00$ 5,000.00$ 9,880.00$
62201-2850 Line A1200 40 HOUR 160.00$ 6,400.00$ 6,400.00$ 6,200.00$ 5,515.20$ 5,000.00$ 7,280.00$
62201-3350 Line A1220 40 HOUR 200.00$ 8,000.00$ 4,520.00$ 6,680.00$ 3,679.20$ 7,000.00$ 11,280.00$
62301-0000 Line A1240 160 HOUR 40.00$ 6,400.00$ 4,160.00$ 7,200.00$ 5,139.20$ 8,800.00$ 9,600.00$
62302-0100 Line A1260 40 HOUR 350.00$ 14,000.00$ 21,520.00$ 1,920.00$ 1,664.00$ 6,000.00$ 6,312.00$
62302-1000 Line A1280 40 HOUR 150.00$ 6,000.00$ 19,120.00$ 5,120.00$ 4,480.40$ 7,000.00$ 6,312.00$
62302-1100 Line A1300 40 HOUR 150.00$ 6,000.00$ 11,960.00$ 5,120.00$ 6,048.40$ 12,000.00$ 8,420.00$
62406-0300 Line A1320 23.0 ACRE 5,000.00$ 115,000.00$ 36,340.00$ 110,400.00$ 63,159.61$ 23,000.00$ 162,357.00$ 1,580.00$ 4,800.00$ 2,746.07$ 1,000.00$ 7,059.00$
299.00$ 128.00$ 151.21$ 300.00$ 210.50$
478.00$ 128.00$ 112.01$ 175.00$ 157.80$
538.00$ 48.00$ 41.60$ 150.00$ 157.80$
26.00$ 45.00$ 32.12$ 55.00$ 60.00$
BLOTTER
TACK COAT
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
CONCRETE, HEADWALL FOR 48-INCH PIPE CULVERT
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
PRIME COAT, METHOD 1
ELBOW, 30-INCH
STANDARD UNDERDRAIN SYSTEM
CLEANING CULVERT IN PLACE
GUARDRAIL SYSTEM G4, TYPE 3, CLASS A STEEL POSTS
TERMINAL SECTION TYPE TANGENT
FENCE
30-INCH PIPE CULVERT
48-INCH PIPE CULVERT
END SECTION FOR 18-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 30-INCH PIPE CULVERT
ELBOW, 24-INCH
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
SPECIAL LABOR, SLOPE SCALING
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
GATE
CATTLE GUARD, 26 FEET
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
376.00$ 285.00$ 294.22$ 350.00$ 276.00$
1.09$ 0.28$ 0.85$ 1.00$ 0.94$
526.00$ 310.00$ 410.90$ 500.00$ 1,394.00$
430.00$ 267.00$ 336.03$ 400.00$ 1,334.00$
46.50$ 61.00$ 36.49$ 50.00$ 118.50$
12,700.00$ 20,000.00$ 13,380.23$ 30,000.00$ 15,780.00$
108.00$ 135.00$ 84.26$ 150.00$ 268.50$
71.50$ 83.00$ 94.79$ 74.00$ 172.00$
77.50$ 93.00$ 82.88$ 61.00$ 133.50$
122.00$ 214.00$ 150.63$ 139.00$ 272.00$
104.00$ 112.00$ 97.11$ 91.00$ 221.00$
715.00$ 485.00$ 313.89$ 600.00$ 900.00$
627.00$ 406.00$ 236.79$ 400.00$ 646.00$
513.00$ 611.00$ 528.03$ 250.00$ 1,112.50$
1,050.00$ 788.00$ 615.12$ 1,375.00$ 1,451.00$
47.50$ 48.00$ 23.79$ 50.00$ 99.00$
648.00$ 652.00$ 566.57$ 275.00$ 1,563.00$
23.00$ 24.00$ 25.54$ 33.00$ 35.50$
884.00$ 2,750.00$ 1,760.40$ 5,000.00$ 6,575.00$
68.00$ 38.00$ 13.16$ 20.00$ 6.60$
2,840.00$ 2,500.00$ 2,660.23$ 2,500.00$ 3,420.00$
20,300.00$ 29,000.00$ 18,033.21$ 28,000.00$ 17,000.00$
1,990.00$ 2,700.00$ 1,120.10$ 800.00$ 2,000.00$
113.00$ 108.00$ 86.76$ 100.00$ 152.00$
126.00$ 118.00$ 95.21$ 20.00$ 127.00$
113.00$ 167.00$ 91.98$ 175.00$ 282.00$
160.00$ 155.00$ 137.88$ 125.00$ 182.00$
143.00$ 132.00$ 111.80$ 125.00$ 247.00$
Schedule A Total of Bid Items: 8,823,230.00$ 14.1% 10,067,722.08$ -15.4% 7,460,457.70$ -18.7% 7,172,914.90$ 0.6% 8,871,809.00$ 14.4% 10,095,329.07$ Project No: UT UT FLAP 73(1)
UT La Sal Mountain Loop Road Project Name: La Sal Mountain Loop Road
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount w Valley Contractors Inc. DBA ACC Sou W.W. Clyde & Co. on Company DBA Nielson Constructionown Brothers Construction Company, I A&S Construction Co.Engineer's Estimate
62510-2000 Line A1340 23.0 ACRE 1,000.00$ 23,000.00$ 12,788.00$ 11,454.00$ 29,368.93$ 23,000.00$ 33,120.00$
62515-3000 Line A1360 23.0 ACRE 1,300.00$ 29,900.00$ 78,660.00$ 70,380.00$ 88,751.02$ 115,000.00$ 109,020.00$
62901-1100 Line A1380 2,000 SQYD 12.00$ 24,000.00$ 11,400.00$ 10,800.00$ 8,060.00$ 20,000.00$ 9,600.00$
63301-0000 Line A1400 30 EACH 350.00$ 10,500.00$ 15,180.00$ 18,450.00$ 12,601.20$ 16,200.00$ 15,300.00$
63308-2000 Line A1420 134 EACH 50.00$ 6,700.00$ 8,576.00$ 6,432.00$ 7,504.00$ 12,328.00$ 11,256.00$
63308-3000 Line A1440 20 EACH 50.00$ 1,000.00$ 4,020.00$ 960.00$ 1,120.00$ 3,500.00$ 1,800.00$
63309-0000 Line A1460 275 EACH 60.00$ 16,500.00$ 20,900.00$ 11,550.00$ 14,784.00$ 17,600.00$ 8,580.00$
63316-1000 Line A1480 10 EACH 400.00$ 4,000.00$ 1,970.00$ 2,140.00$ 2,240.20$ 1,500.00$ 4,800.00$
63402-0300 Line A1500 71.0 MILE 530.00$ 37,630.00$ 44,943.00$ 122,475.00$ 53,680.97$ 47,215.00$ 45,156.00$
63402-0400 Line A1520 4.0 MILE 530.00$ 2,120.00$ 764.00$ 1,456.00$ 784.08$ 800.00$ 768.00$
63501-1000 Line A1540 ALL LPSM 75,000.00$ 75,000.00$ 139,800.00$ 283,000.00$ 79,802.61$ 80,000.00$ 123,120.00$
63502-0600 Line A1560 6 EACH 300.00$ 1,800.00$ 2,154.00$ 1,020.00$ 1,830.42$ 6,000.00$ 1,800.00$
63502-0700 Line A1580 500 EACH 25.00$ 12,500.00$ 44,750.00$ 9,500.00$ 9,155.00$ 3,500.00$ 9,000.00$
63502-1300 Line A1600 1,000 EACH 60.00$ 60,000.00$ 120,000.00$ 32,000.00$ 57,450.00$ 18,000.00$ 24,000.00$
63503-0400 Line A1620 160 LNFT 70.00$ 11,200.00$ 7,280.00$ 6,720.00$ 11,080.00$ 8,000.00$ 11,840.00$
63503-1000 Line A1640 500 LNFT 6.00$ 3,000.00$ 2,100.00$ 1,600.00$ 395.00$ 500.00$ 3,000.00$
63504-1000 Line A1660 600 SQFT 15.00$ 9,000.00$ 14,400.00$ 23,400.00$ 13,038.00$ 30,000.00$ 10,800.00$
63505-1000 Line A1680 18.2 MILE 1,500.00$ 27,300.00$ 46,046.00$ 24,843.00$ 8,154.33$ 48,230.00$ 46,300.80$
63506-0500 Line A1700 1,120 HOUR 35.00$ 39,200.00$ 80,080.00$ 45,920.00$ 40,454.40$ 42,560.00$ 43,008.00$
63506-0600 Line A1720 560 HOUR 65.00$ 36,400.00$ 43,400.00$ 36,400.00$ 31,785.60$ 36,400.00$ 30,240.00$ 77.50$ 65.00$ 56.76$ 65.00$ 54.00$
71.50$ 41.00$ 36.12$ 38.00$ 38.40$
2,530.00$ 1,365.00$ 448.04$ 2,650.00$ 2,544.00$
24.00$ 39.00$ 21.73$ 50.00$ 18.00$
4.20$ 3.20$ 0.79$ 1.00$ 6.00$
45.50$ 42.00$ 69.25$ 50.00$ 74.00$
120.00$ 32.00$ 57.45$ 18.00$ 24.00$
89.50$ 19.00$ 18.31$ 7.00$ 18.00$
359.00$ 170.00$ 305.07$ 1,000.00$ 300.00$
139,800.00$ 283,000.00$ 79,802.61$ 80,000.00$ 123,120.00$
191.00$ 364.00$ 196.02$ 200.00$ 192.00$
633.00$ 1,725.00$ 756.07$ 665.00$ 636.00$
197.00$ 214.00$ 224.02$ 150.00$ 480.00$
76.00$ 42.00$ 53.76$ 64.00$ 31.20$
201.00$ 48.00$ 56.00$ 175.00$ 90.00$
64.00$ 48.00$ 56.00$ 92.00$ 84.00$
506.00$ 615.00$ 420.04$ 540.00$ 510.00$
5.70$ 5.40$ 4.03$ 10.00$ 4.80$
3,420.00$ 3,060.00$ 3,858.74$ 5,000.00$ 4,740.00$
556.00$ 498.00$ 1,276.91$ 1,000.00$ 1,440.00$
DELINEATOR
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, TYPE B, BROKEN
TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX
ROLLED EROSION CONTROL PRODUCT, TYPE 4
SIGN SYSTEM
OBJECT MARKER, TYPE 2
OBJECT MARKER, TYPE 3
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
File details come from the government source that posted it. Updated .