USCGC Alder Cargo Hatch Welding
Closed Solicitation Posted
- Solicitation number
- 70z08526Q0024676
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- Place of performance
- San Francisco, California 94130, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Coast Guard is soliciting proposals for cargo hold hatch cofferdam drain piping renewal work on the USCGC ALDER (WLB 216), a Coast Guard vessel. This solicitation requires the contractor to crop out and renew necessary portions of 3-inch and 2-inch diameter piping and funnel pieces located in compartment 2-30-0-AA, including fabrication, installation, and testing of new piping systems in compliance with Coast Guard Drawing 225-WLB-528-001, REV K. Key contract requirements include furnishing and installing protective measures, handling all interferences, preventing contamination of personnel and spaces, removing and disposing of fluids in accordance with applicable Federal, state, and local regulations, installing new pipe hangers and labeling systems, and performing leak testing at normal operating pressure with zero visible leakage acceptance. The contractor must also provide a Marine Chemist and competent person with appropriate hot work certifications, notify the vessel's point of contact of planned hot work activities, and ensure all personnel possess valid TWIC identification or state-issued identification. The solicitation was posted on April 30, 2026, with a proposal due date of May 11, 2026.
This is a Total Small Business set-aside contract, limiting competition to small business entities. The work will be performed at Guard Sector San Francisco, Yerba Buena Island, San Francisco, California 94130, during one of two available periods: May 31 through June 15, 2026, or July 4 through July 25, 2026. The Statement of Work specifies that contractors must comply with all applicable Federal, state, and local laws and regulations, including requirements for marine chemist certification, competent person designation for hot work, and proper installation of insulation materials per ASTM F683 standards and touch-up preservation coating per SFLC Std Spec 6310. No specific budget range or award value is disclosed in the solicitation notice, though the work is classified under NAICS 336611 (Ship Building and Repairing) and PSC J020 (Maint/Repair/Rebuild Of Equipment—Ship and Marine Equipment). The relatively short proposal timeline of 11 days suggests the Coast Guard intends to award this contract expeditiously to accommodate the vessel's scheduled availability windows.
Notice text
Statement of Work
USCGC ALDER (WLB 216)
Cargo Hold Hatch Cofferdam Drain Piping Crop & Renew
1. Purpose and Scope
. KTR shall renew necessary portions of the cargo hold hatch cofferdam drain piping
located in compartment 2-30-0-AA, Cargo Hold.
2. Deliverables and Performance Requirements
. Protective measures: The KTR must furnish and install all protective measures IAW
SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment
protection).
. Interferences: The KTR must handle all interferences IAW SFLC Std Spec0000,
(Interferences).
. Contamination prevention: The KTR must take all precautions to prevent
contamination of personnel and spaces IAW all applicable Federal, state, and local
regulations.
. Fluid handling: The KTR must remove and dispose of removed fluids from the
affected piping system, IAW all applicable Federal, state, and local regulations. Do not
drain any fluids into any spaced, bilge, or exterior location.
. Piping renewal particulars: The KTR must accomplish the following tasks, using
Coast Guard Drawing 225–WLB–528–001, REV K as guidance:
o Crop out necessary length of piping (3” & 2” diameter), to include all necessary
funnel pieces of the cofferdam system.
o Fabricate necessary piping arrangement previously cropped IAW CG Drawing.
o Install all fabricated piping to include all required gaskets/seals IAW CG
Drawing.
o KTR must provide a means of sealing any open piping while any portion of the
system is open (i.e.: upstream valve blind flange).
. Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary.
. Pipe labeling: The KTR must label affected piping as follows:
o Name of the piping system service.
o Destination, where feasible.
o Direction of flow, indicated by an arrow three inches long pointing away from
the lettering.
. Leak Test: After completing all authorized mechanical (i.e. threaded, bolted, etc.)
joint repairs, the Contractor must test the affected piping system's operation using the
system fluid at normal operating pressure. Ensure zero visible leakage from or
deformation of mechanical parts by repairing all leaks and discrepancies.
. Touch-up preservation: The KTR must prepare and coat all new and disturbed
surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310,
(Touch-ups and minor coating repairs.)
. Piping insulation installation: The KTR must install new insulation materials over
the exposed pipe surfaces at thicknesses appropriate to the application and temperature
ranges specified in ASTM F683 Tables.
Files
| File | Type | Posted |
|---|---|---|
| ALDER_SOW_CargoHoldHatchCofferdamDrainPiping_CropRenew.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USCGC alder DD FY27 | — | Total Small Business | |
| Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair | — | No set-aside | |
| USCGC stratton hatch renew | — | Total Small Business | |
| Drydock Repairs USCGC HATCHET (WLIC-75309) | — | Total Small Business | |
| USCG STA SAN francisco (45667) FY27 DD repairs | — | Total Small Business |