Technical Support and Maintenance Services for Laboratory Reverse Osmosis / Deionized Water System
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DR22Q0074
- Agency
- ENDIST Baltimore US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 811219 Other Electronic and Precision Equipment Repair and Maintenance
- PSC
- S114 Utilities- Water
- Place of performance
- Washington, District of Columbia 20016, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The Washington Aqueduct (WA), a division of the Baltimore District United States Army Corps of Engineers, produces drinking water for over one million citizens living, working, and visiting in the District of Columbia, Arlington County, Virginia, and the City of Falls Church, Virginia, and its service area. WA has the responsibility to provide safe, reliable, cost-effective drinking water 24 hours a day, seven days a week. The Aqueduct is a federally-owned and operated public water supply agency that produces an average of 180 million gallons of water per day at two treatment plants located in the District of Columbia. All funding for operations, maintenance, and capital improvements comes from revenue generated by selling drinking water to the three jurisdictions.
The Washington Aqueduct (WA) is a critical infrastructure that operates two water treatment plants (WTPs), the Dalecarlia WTP and the McMillan WTP. Located at the Dalecarlia WTP is the WA Laboratory. The primary mission of the WA Laboratory is to provide quality analytical support services to the Washington Aqueduct and its wholesale customers in order to ensure the safety and quality of the drinking water. As a service, the WA Laboratory performs legally-required drinking water compliance testing in accordance with local, state, and federal statutes. Extensive testing includes various chemical, biological, radiological, and other required parameters. The Washington Aqueduct Laboratory routinely analyzes process control, customer compliance, and research water samples. Occasionally, emergency water sample testing is required. In accordance with its mission, the Washington Aqueduct Laboratory is required to maintain a continuous state of readiness for water sample analysis.
The Laboratory’s Deionized Water System equipment included in the performance work statement (PWS) is used for providing contaminant-free water (Type I Reagent Grade Water, at a minimum) that is used for sample collection and laboratory testing. Testing at the water quality laboratory and the operator laboratories employs methods for microbiology, metals, organic, and inorganic compounds, which require reagent water. The reagent-grade water is also used for microbiological media preparation and for rinsing glassware. Since all of these procedures require reagent-grade water, Washington Aqueduct is required to maintain a continuous readiness status regarding the quality and supply of reagent-grade water to ensure analytical readiness.
The contractor shall independently provide support services to satisfy the overall operational objectives of the Washington Aqueduct. The primary objective is to provide contractor services and deliverables through performance of technical support and routine on-site maintenance support. The services rendered shall be for the contractor to provide on-call and on-site assistance in areas pertaining to the Deionized Water System operation, troubleshooting, and maintenance.
Solicitation admendment 0001--Extend the due date to 30 September 2022; And to change the quantity for CLINS: 0004, 1004, 2004, 3004, 4004 from 1 to 2.
Update #1 ·
The Washington Aqueduct (WA), a division of the Baltimore District United States Army Corps of Engineers, produces drinking water for over one million citizens living, working, and visiting in the District of Columbia, Arlington County, Virginia, and the City of Falls Church, Virginia, and its service area. WA has the responsibility to provide safe, reliable, cost-effective drinking water 24 hours a day, seven days a week. The Aqueduct is a federally-owned and operated public water supply agency that produces an average of 180 million gallons of water per day at two treatment plants located in the District of Columbia. All funding for operations, maintenance, and capital improvements comes from revenue generated by selling drinking water to the three jurisdictions.
The Washington Aqueduct (WA) is a critical infrastructure that operates two water treatment plants (WTPs), the Dalecarlia WTP and the McMillan WTP. Located at the Dalecarlia WTP is the WA Laboratory. The primary mission of the WA Laboratory is to provide quality analytical support services to the Washington Aqueduct and its wholesale customers in order to ensure the safety and quality of the drinking water. As a service, the WA Laboratory performs legally-required drinking water compliance testing in accordance with local, state, and federal statutes. Extensive testing includes various chemical, biological, radiological, and other required parameters. The Washington Aqueduct Laboratory routinely analyzes process control, customer compliance, and research water samples. Occasionally, emergency water sample testing is required. In accordance with its mission, the Washington Aqueduct Laboratory is required to maintain a continuous state of readiness for water sample analysis.
The Laboratory’s Deionized Water System equipment included in the performance work statement (PWS) is used for providing contaminant-free water (Type I Reagent Grade Water, at a minimum) that is used for sample collection and laboratory testing. Testing at the water quality laboratory and the operator laboratories employs methods for microbiology, metals, organic, and inorganic compounds, which require reagent water. The reagent-grade water is also used for microbiological media preparation and for rinsing glassware. Since all of these procedures require reagent-grade water, Washington Aqueduct is required to maintain a continuous readiness status regarding the quality and supply of reagent-grade water to ensure analytical readiness.
The contractor shall independently provide support services to satisfy the overall operational objectives of the Washington Aqueduct. The primary objective is to provide contractor services and deliverables through performance of technical support and routine on-site maintenance support. The services rendered shall be for the contractor to provide on-call and on-site assistance in areas pertaining to the Deionized Water System operation, troubleshooting, and maintenance.
Attachments
| File | Type | Posted |
|---|---|---|
| B.08.02 Solicitation W912DR22Q0074 Update.pdf | ||
| B.01.03 SOLICIT AMENDMENT1.pdf | ||
| B.08.02 Solicitation W912DR22Q0074.pdf | ||
| B.04.30 WAGE DETERMINATION.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Technical Support and Maintenance Services for Laboratory Reverse Osmosis / Deionized Water System | Award Notice | |
| Technical Support and Maintenance Services for Laboratory Reverse Osmosis / Deionized Water System | Solicitation | |
| Technical Support and Maintenance Services for Laboratory Reverse Osmosis / Deionized Water System | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity