SSA-OIG Initial Space Alteration
Award Notice Posted
- Solicitation number
- GS-01-P-17-BW-C-0009
- Agency
-
Region 1
Public Buildings Service, General Services Administration
- Awarded
- to Schroeder Construction Management Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- GS-01-P-17-BW-C-0007 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Norris Cotton Federal Building 275 Chestnut Street Manchester, New Hampshire 03101, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Dec 27, 2016 5:12 pm
Modified: Feb 09, 2017 12:08 pmTrack Changes
Proposal due date changed reference Amenment 0003
Title: SSA-OIG Initial Space Alteration, Manchester, NH
Classification: Z
NAICS: 236220, Commercial and Institutional Building Construction.
This procurement is a 100% Total small business Set-aside.
The estimated cost is between $250,000.00 to $500,000.00.
The Small Business Size standard is $36.5 MILLION.
A project for the initial space alteration (ISA) of third floor space in the Norris Cotton Federal Building (NCFB) is to be completed for SSA-OIG. The work consists of the demolition of the following building items: GWB metal stud partitions, electrical power infrastructure, data infrastructure and cabling, millwork recovery, HVAC above ceiling equipment, SAT system, overhead lighting system, sprinkler system and flooring systems. The work will then consist of the interior installation / build out of the 3rd floor suite
to include: GWB metal stud partition construction, security mesh, electrical power system, data and voice infrastructure and cabling, HVAC system equipment, SAT system, lighting system, electronic security system, split AC system, sprinkler system reconfiguration and flooring system. Two ancillary efforts are required on the 4th floor of NCFB: 1 -installation of data and power in a conference room and 2 - installation of recovered millwork from the 3rd floor into a suite on the 4th floor.
Update #2 ·
Added: Dec 27, 2016 5:12 pm
Modified: Feb 08, 2017 12:13 pmTrack Changes
Proposal due date changed reference Amenment 0002
Title: SSA-OIG Initial Space Alteration, Manchester, NH
Classification: Z
NAICS: 236220, Commercial and Institutional Building Construction.
This procurement is a 100% Total small business Set-aside.
The estimated cost is between $250,000.00 to $500,000.00.
The Small Business Size standard is $36.5 MILLION.
A project for the initial space alteration (ISA) of third floor space in the Norris Cotton Federal Building (NCFB) is to be completed for SSA-OIG. The work consists of the demolition of the following building items: GWB metal stud partitions, electrical power infrastructure, data infrastructure and cabling, millwork recovery, HVAC above ceiling equipment, SAT system, overhead lighting system, sprinkler system and flooring systems. The work will then consist of the interior installation / build out of the 3rd floor suite
to include: GWB metal stud partition construction, security mesh, electrical power system, data and voice infrastructure and cabling, HVAC system equipment, SAT system, lighting system, electronic security system, split AC system, sprinkler system reconfiguration and flooring system. Two ancillary efforts are required on the 4th floor of NCFB: 1 -installation of data and power in a conference room and 2 - installation of recovered millwork from the 3rd floor into a suite on the 4th floor.
Update #1 ·
Added: Dec 27, 2016 5:12 pm
Title: SSA-OIG Initial Space Alteration, Manchester, NH
Classification: Z
NAICS: 236220, Commercial and Institutional Building Construction.
This procurement is a 100% Total small business Set-aside.
The estimated cost is between $250,000.00 to $500,000.00.
The Small Business Size standard is $36.5 MILLION.
A project for the initial space alteration (ISA) of third floor space in the Norris Cotton Federal Building (NCFB) is to be completed for SSA-OIG. The work consists of the demolition of the following building items: GWB metal stud partitions, electrical power infrastructure, data infrastructure and cabling, millwork recovery, HVAC above ceiling equipment, SAT system, overhead lighting system, sprinkler system and flooring systems. The work will then consist of the interior installation / build out of the 3rd floor suite
to include: GWB metal stud partition construction, security mesh, electrical power system, data and voice infrastructure and cabling, HVAC system equipment, SAT system, lighting system, electronic security system, split AC system, sprinkler system reconfiguration and flooring system. Two ancillary efforts are required on the 4th floor of NCFB: 1 -installation of data and power in a conference room and 2 - installation of recovered millwork from the 3rd floor into a suite on the 4th floor.