Simpson Springs Campground Redevelopment
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140L5721Q0024
- Agency
- Utah Region Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Simpson Springs Campground Redevelopment
The Bureau of Land Management (BLM), West Desert District/Salt Lake Field Office intends to award a single, firm-fixed price contract for the installation of a government furnished kiosk and fee tube, redevelopment of 12 camp sites, improve 3 existing yard hydrants and the road improvements in the Simpson Springs Campground.
The Contractor shall minimize disturbance to the site to the greatest extent possible unless otherwise directed. All waste, trash, and debris generated from this effort shall be disposed of in a manner consistent with local and State regulations. During and after construction activities, the site shall be inspected and cleaned of any trash that has accumulated.
Work under this contract is located in Tooele County, Utah at the Simpson Springs Campground Site, approximately 25.5 miles southwest of Vernon, UT, on the Pony Express Road. Access to the work site is on State, County, and BLM paved and gravel roads. The work locations are shown on the attached Site Map. The contract period of performance is 90 days from issuance of the notice to proceed.
In accordance with FAR 36.204, the estimated magnitude of this construction project is between $100,000 and $250,000. No bid bond is required but a payment bond is required.
To be considered eligible for award, vendors must be registered and have active profiles with completed representations and certifications in the System for Award Management (SAM) database (https://www.sam.gov). There is NO fee to register for this site.
Any correspondence concerning this requirement shall reference 140L5721Q0024 - Simpson Spring Campground Redevelopment in the subject line and shall be sent to Tori Blunt Mayes at tbluntmayes@blm.gov.
Update #2 ·
Simpson Springs Campground Redevelopment
The Bureau of Land Management (BLM), West Desert District/Salt Lake Field Office intends to award a single, firm-fixed price contract for the installation of a government furnished kiosk and fee tube, redevelopment of 12 camp sites, improve 3 existing yard hydrants and the road improvements in the Simpson Springs Campground.
The Contractor shall minimize disturbance to the site to the greatest extent possible unless otherwise directed. All waste, trash, and debris generated from this effort shall be disposed of in a manner consistent with local and State regulations. During and after construction activities, the site shall be inspected and cleaned of any trash that has accumulated.
Work under this contract is located in Tooele County, Utah at the Simpson Springs Campground Site, approximately 25.5 miles southwest of Vernon, UT, on the Pony Express Road. Access to the work site is on State, County, and BLM paved and gravel roads. The work locations are shown on the attached Site Map. The contract period of performance is 90 days from issuance of the notice to proceed.
In accordance with FAR 36.204, the estimated magnitude of this construction project is between $100,000 and $250,000. No bid bond is required but a payment bond is required.
To be considered eligible for award, vendors must be registered and have active profiles with completed representations and certifications in the System for Award Management (SAM) database (https://www.sam.gov). There is NO fee to register for this site.
Any correspondence concerning this requirement shall reference 140L5721Q0024 - Simpson Spring Campground Redevelopment in the subject line and shall be sent to Tori Blunt Mayes at tbluntmayes@blm.gov.
Update #1 ·
Simpson Springs Campground Redevelopment
The Bureau of Land Management (BLM), West Desert District/Salt Lake Field Office intends to award a single, firm-fixed price contract for the installation of a government furnished kiosk and fee tube, redevelopment of 12 camp sites, improve 3 existing yard hydrants and the road improvements in the Simpson Springs Campground.
The Contractor shall minimize disturbance to the site to the greatest extent possible unless otherwise directed. All waste, trash, and debris generated from this effort shall be disposed of in a manner consistent with local and State regulations. During and after construction activities, the site shall be inspected and cleaned of any trash that has accumulated.
Work under this contract is located in Tooele County, Utah at the Simpson Springs Campground Site, approximately 25.5 miles southwest of Vernon, UT, on the Pony Express Road. Access to the work site is on State, County, and BLM paved and gravel roads. The work locations are shown on the attached Site Map. The contract period of performance is 90 days from issuance of the notice to proceed.
A site visit will be held on May 11, 2021 at 11:00 am MT at the project site (see attached map) and attendance is highly encouraged. Please RSVP to Jared Redington at (801) 977-4369 or jredingt@blm.gov. Please follow the CDC's social distancing guidelines during the site visit.
This project will be 100% set aside for small business vendors under the North American Industrial Classification System (NAICS) code 237990 - Other Heavy and Civil Engineering Construction. Davis Bacon Act (DBA) is applicable and the appropriate DBA Wage Determination(s) will be included in the solicitation.
In accordance with FAR 36.204, the estimated magnitude of this construction project is between $100,000 and $250,000. No bid bond is required but a payment bond is required.
To be considered eligible for award, vendors must be registered and have active profiles with completed representations and certifications in the System for Award Management (SAM) database (https://www.sam.gov). There is NO fee to register for this site.
Any correspondence concerning this requirement shall reference 140L5721Q0024 - Simpson Spring Campground Redevelopment in the subject line and shall be sent to Tori Blunt Mayes at tbluntmayes@blm.gov.
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140L5721Q0024_Amd_0002.pdf | ||
| 140L5721Q0024 Amendment 01 Site Visit Notes and Questions_0001.pdf | ||
| Sol_140L5721Q0024_Amd_0001.pdf | ||
| Attachment 4 - Wage Determination UT20210086 UT20210097.pdf | ||
| Attachment 3 - Drawings.pdf | ||
| Attachment 2 - Specifications.pdf | ||
| Attachment 1 - Directions Map.pdf | ||
| Sol_140L5721Q0024.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Simpson Springs Campground Redevelopment | Award Notice | |
| Simpson Springs Campground Redevelopment | Solicitation | |
| Simpson Springs Campground Redevelopment | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity