SIAD Construction Project - Group B (356, 357, 358, 360)

Award Notice Posted

Solicitation number
W912GY-17-R-0017
Agency
Awarded
to Herman Construction Group, Inc.
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
W912GY18C0009 Federal contract award
NAICS code
236210 Industrial Building Construction
PSC
Not on record
Place of performance
Sierra Army Depot, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Army Contract Command - Warren (ACC-WRN) proposes to release a solicitation for repairs to Buildings 356, 357, 358, and 360 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year.

There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain of gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, Install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, Install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to, more tasks associated with each of these.

.

Update #1 ·

Army Contract Command - Warren (ACC-WRN) proposes to release a solicitation for repairs to Buildings 356, 357, 358, and 360 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year.

There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain of gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, Install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, Install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to, more tasks associated with each of these.

Notice history

Notice Type Posted
CONSTRUCTION PROJECT - Bldg 356, 357, 358 & 360 Latest Award Notice
This notice Award Notice
SIAD Construction Project - Group B Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity