Repair vickers servo valves
Awarded Award Notice Posted
- Solicitation number
- W911PT18Q0008
- Agency
- TACOM Life Cycle Management Command Army Materiel Command, Department of Defense
- Awarded
- to Tattersall Industries LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W911PT18P0049 Federal contract award
- NAICS code
- 811219 Other Electronic and Precision Equipment Repair and Maintenance
- PSC
- Not on record
- Place of performance
- 1 Buffington St Watervliet, New York 12189, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
SCOPE OF WORK AAS #171770010
1. The contractor shall inspect the lot of two valves (Model # SA4-03-35-004-15) and provide a list of task to be performed, materials by part number to be replaced.
2. The cost for repair shall not exceed 70% of the cost of a new valve.
3. The contractor shall provide an exterior inspection, looking for damage and leaking.
4. Servo valves will be disassembled and pre-testing of key components like control and power wiring, current/flow, coil independence, motor, and ball weld, etc. parts required for repair as recorded.
5. All new seals & filters ultrasonically are replaced every time.
6. The motors are calibrated every time.
7. All new parts will be provided by the contractor, unless written approval is granted on a case by case basis.
7 Servo valve is cleaned and all required parts are installed.
8 Test each servo valve to OEM specifications.
9 After the valve has passed the testing procedure, package with a service report, test report, Certificate of Conformance, and a one (1) year Warranty of parts and labor. Servo Valve is to be electrostatically packaged and returned.
.
Update #1 ·
Added: Oct 25, 2017 8:40 am
SCOPE OF WORK AAS #171770010
1. The contractor shall inspect the lot of two valves (Model # SA4-03-35-004-15) and provide a list of task to be performed, materials by part number to be replaced.
2. The cost for repair shall not exceed 70% of the cost of a new valve.
3. The contractor shall provide an exterior inspection, looking for damage and leaking.
4. Servo valves will be disassembled and pre-testing of key components like control and power wiring, current/flow, coil independence, motor, and ball weld, etc. parts required for repair as recorded.
5. All new seals & filters ultrasonically are replaced every time.
6. The motors are calibrated every time.
7. All new parts will be provided by the contractor, unless written approval is granted on a case by case basis.
7 Servo valve is cleaned and all required parts are installed.
8 Test each servo valve to OEM specifications.
9 After the valve has passed the testing procedure, package with a service report, test report, Certificate of Conformance, and a one (1) year Warranty of parts and labor. Servo Valve is to be electrostatically packaged and returned.
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity