Repair Road and Storm Drainage at Binz Engleman EPC
Closed Solicitation Posted
- Solicitation number
- FA3016
- Agency
-
Air Education and Training Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Jbsa Ft Sam Houston TX 78234 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to repair Binz-Engleman Road and storm drainage at Joint Base San Antonio Fort Sam Houston in Texas. The Department of the Air Force Air Education and Training Command requires the contractor lift sunken pavement areas to the proper elevation and stabilize the road surface and embankment through deep injection stabilization of a two-part polyurethane polymer. The contractor must follow Unified Facility Criteria manuals for asphalt and concrete pavement maintenance and repair work. Award will be made to the responsible offeror providing the lowest total evaluated price for an acceptable HDPP product. Questions are due by July 14, 2020 and proposals are due by 1:00pm on July 24, 2020.
The requirement is set aside 100% for small businesses under NAICS code 237310 for highway, street, and bridge construction. The estimated value of the fixed-price contract is between $100,000 and $250,000 to repair approximately 100 feet by 32 feet of Binz-Engleman Road at the Salado Creek location. Work must be completed by September 30, 2020 at Joint Base San Antonio Fort Sam Houston, Texas.
Notice text
8 versions
Update #8 · Latest ·
****Amendment 04****
Amendment 04 is hereby incorporated into this solicitation; in summary, the amendment is for attachment 7- Section L (Rev 22 July 2020) at Section 1.5; Attachment 7-Section L states that the solicitation should be identified in the subject line as "FA301620B0016 Response to IFB".
(End of Comments)
****Amendment 03****
Amendment 03 is hereby incorporated into this solicitation; in summary, there is a revised SOW/Specifications included and the due date for bids has been extended to Friday 24 July 2020 at 9:00 a.m. local San Antonio, TX time.
In addition, due to the increase HEPCON Charlie at JBSA the bid opening will be held at the Valley Hi Visitor Center Parking Lot; interested attendees are requested to follow the instructions in the revised Attachment 7. Representatives attending the bid opening will be required to wear mouth cover and follow social distancing guidelines.
A copy of the questions/answers provided as a result of this solicitation and respective site visit are also included in this amendment.
(End of Comments)
***NOTE as of 6/26/2020*** Due to the increase HEPCON Charlie at JBSA, we will no longer meet at the parking lot of Bldg. 4196. We will now meet directly at the site on the bridge between the ECP and bridge itself on 6/30/2020 at 9:00AM. By doing this there will be no access issues as the contractors will not have to enter through an ECP - no passes required and no delays****
FA301620B0016
Amendment 02-
52.236-27 SITE VISIT, CHAGED TO READ THE FOLLOWING:
Participants will meet: Directly at the site on the Binz Englaman Road bridge between the ECP and bridge itself on Tuesday 6/30/2020 at 9:AM Local San Antonio, TX time. As a result, the contractors will not have to enter through an ECP and no base passes will be required to attend the site visit.
Amendment 01-
52.236-27 SITE VISIT , CHANGED TO READ THE FOLLOWING:
An organized site visit has been changed to reflect the following: "Tuesday 30 June 2020 at 9:00AM Central".
Participants will meet at 4196 Engineer Street, JBSA Fort Sam Houston, TX 78234. Participants will meet at the parking lot and depart to the site by 9:15AM Central."
Individuals needing base passes, will submit request NLT Friday 26 June 2020 at 1:00pm Local San Antonio time.”
This project is to repair Binz-Engleman Road at Joint Base San Antonio (JBSA), Fort Sam Houston, Texas. The objective is to lift the sunken pavement area to the proper elevation by
stabilizing road surface to improve the Binz-Engleman Road Embankment.
This is a construction requirement in accordance with FAR Part 36. This project is 100% set aside for competitive small business. The NAICS for this requirement is 237310. The
magnitude of this project is between $100,000 and $250,000.
Repair Binz-Englemen Road from Bridge to Garden Dr by bringing the failed road
portion back up to proper elevation by utilizing Deep Injection Stabilization of
Binz-Englemen Road and embankment. Work performed will be deep injection
stabilization of a two part polymer: High Density Polyurethane Polymer
(HDPP). Contractor shall perform injections in accordance with (IAW) the
drawings and specifications. The contractor shall follow and abide by, but
not be limited to the Unified Facility Criteria (UFC). UFC 03-270-01 (O & M
MANUAL: ASPHALT AND CONCRETE PAVEMENT MAINTENANCE AND REPAIR), dated
02/2018, authorizes High Density Polyurethane Polymer (HDPP) and deep
injection (DI) for repairs and maintenance. The work includes Deep Injection Stabilization
Update #7 ·
****Amendment 03****
Amendment 03 is hereby incorporated into this solicitation; in summary, there is a revised SOW/Specifications included and the due date for bids has been extended to Friday 24 July 2020 at 9:00 a.m. local San Antonio, TX time.
In addition, due to the increase HEPCON Charlie at JBSA the bid opening will be held at the Valley Hi Visitor Center Parking Lot; interested attendees are requested to follow the instructions in the revised Attachment 7. Representatives attending the bid opening will be required to wear mouth cover and follow social distancing guidelines.
A copy of the questions/answers provided as a result of this solicitation and respective site visit are also included in this amendment.
(End of Comments)
***NOTE as of 6/26/2020*** Due to the increase HEPCON Charlie at JBSA, we will no longer meet at the parking lot of Bldg. 4196. We will now meet directly at the site on the bridge between the ECP and bridge itself on 6/30/2020 at 9:00AM. By doing this there will be no access issues as the contractors will not have to enter through an ECP - no passes required and no delays****
FA301620B0016
Amendment 02-
52.236-27 SITE VISIT, CHAGED TO READ THE FOLLOWING:
Participants will meet: Directly at the site on the Binz Englaman Road bridge between the ECP and bridge itself on Tuesday 6/30/2020 at 9:AM Local San Antonio, TX time. As a result, the contractors will not have to enter through an ECP and no base passes will be required to attend the site visit.
Amendment 01-
52.236-27 SITE VISIT , CHANGED TO READ THE FOLLOWING:
An organized site visit has been changed to reflect the following: "Tuesday 30 June 2020 at 9:00AM Central".
Participants will meet at 4196 Engineer Street, JBSA Fort Sam Houston, TX 78234. Participants will meet at the parking lot and depart to the site by 9:15AM Central."
Individuals needing base passes, will submit request NLT Friday 26 June 2020 at 1:00pm Local San Antonio time.”
This project is to repair Binz-Engleman Road at Joint Base San Antonio (JBSA), Fort Sam Houston, Texas. The objective is to lift the sunken pavement area to the proper elevation by
stabilizing road surface to improve the Binz-Engleman Road Embankment.
This is a construction requirement in accordance with FAR Part 36. This project is 100% set aside for competitive small business. The NAICS for this requirement is 237310. The
magnitude of this project is between $100,000 and $250,000.
Repair Binz-Englemen Road from Bridge to Garden Dr by bringing the failed road
portion back up to proper elevation by utilizing Deep Injection Stabilization of
Binz-Englemen Road and embankment. Work performed will be deep injection
stabilization of a two part polymer: High Density Polyurethane Polymer
(HDPP). Contractor shall perform injections in accordance with (IAW) the
drawings and specifications. The contractor shall follow and abide by, but
not be limited to the Unified Facility Criteria (UFC). UFC 03-270-01 (O & M
MANUAL: ASPHALT AND CONCRETE PAVEMENT MAINTENANCE AND REPAIR), dated
02/2018, authorizes High Density Polyurethane Polymer (HDPP) and deep
injection (DI) for repairs and maintenance. The work includes Deep Injection Stabilization
Update #6 ·
***NOTE as of 6/26/2020*** Due to the increase HEPCON Charlie at JBSA, we will no longer meet at the parking lot of Bldg. 4196. We will now meet directly at the site on the bridge between the ECP and bridge itself on 6/30/2020 at 9:00AM. By doing this there will be no access issues as the contractors will not have to enter through an ECP - no passes required and no delays****
FA301620B0016
Amendment 02-
52.236-27 SITE VISIT, CHAGED TO READ THE FOLLOWING:
Participants will meet: Directly at the site on the Binz Englaman Road bridge between the ECP and bridge itself on Tuesday 6/30/2020 at 9:AM Local San Antonio, TX time. As a result, the contractors will not have to enter through an ECP and no base passes will be required to attend the site visit.
Amendment 01-
52.236-27 SITE VISIT , CHANGED TO READ THE FOLLOWING:
An organized site visit has been changed to reflect the following: "Tuesday 30 June 2020 at 9:00AM Central".
Participants will meet at 4196 Engineer Street, JBSA Fort Sam Houston, TX 78234. Participants will meet at the parking lot and depart to the site by 9:15AM Central."
Individuals needing base passes, will submit request NLT Friday 26 June 2020 at 1:00pm Local San Antonio time.”
This project is to repair Binz-Engleman Road at Joint Base San Antonio (JBSA), Fort Sam Houston, Texas. The objective is to lift the sunken pavement area to the proper elevation by
stabilizing road surface to improve the Binz-Engleman Road Embankment.
This is a construction requirement in accordance with FAR Part 36. This project is 100% set aside for competitive small business. The NAICS for this requirement is 237310. The
magnitude of this project is between $100,000 and $250,000.
Repair Binz-Englemen Road from Bridge to Garden Dr by bringing the failed road
portion back up to proper elevation by utilizing Deep Injection Stabilization of
Binz-Englemen Road and embankment. Work performed will be deep injection
stabilization of a two part polymer: High Density Polyurethane Polymer
(HDPP). Contractor shall perform injections in accordance with (IAW) the
drawings and specifications. The contractor shall follow and abide by, but
not be limited to the Unified Facility Criteria (UFC). UFC 03-270-01 (O & M
MANUAL: ASPHALT AND CONCRETE PAVEMENT MAINTENANCE AND REPAIR), dated
02/2018, authorizes High Density Polyurethane Polymer (HDPP) and deep
injection (DI) for repairs and maintenance. The work includes Deep Injection Stabilization
Update #5 ·
***NOTE as of 6/26/2020*** Due to the increase HEPCON Charlie at JBSA, we will no longer meet at the parking lot of Bldg. 4196. We will now meet directly at the site on the bridge between the ECP and bridge itself on 6/30/2020 at 9:00AM. By doing this there will be no access issues as the contractors will not have to enter through an ECP - no passes required and no delays****
FA301620B0016
Amendment 01-
52.236-27 SITE VISIT , CHANGED TO READ THE FOLLOWING:
An organized site visit has been changed to reflect the following: "Tuesday 30 June 2020 at 9:00AM Central".
Participants will meet at 4196 Engineer Street, JBSA Fort Sam Houston, TX 78234. Participants will meet at the parking lot and depart to the site by 9:15AM Central."
Individuals needing base passes, will submit request NLT Friday 26 June 2020 at 1:00pm Local San Antonio time.”
This project is to repair Binz-Engleman Road at Joint Base San Antonio (JBSA), Fort Sam Houston, Texas. The objective is to lift the sunken pavement area to the proper elevation by
stabilizing road surface to improve the Binz-Engleman Road Embankment.
This is a construction requirement in accordance with FAR Part 36. This project is 100% set aside for competitive small business. The NAICS for this requirement is 237310. The
magnitude of this project is between $100,000 and $250,000.
Repair Binz-Englemen Road from Bridge to Garden Dr by bringing the failed road
portion back up to proper elevation by utilizing Deep Injection Stabilization of
Binz-Englemen Road and embankment. Work performed will be deep injection
stabilization of a two part polymer: High Density Polyurethane Polymer
(HDPP). Contractor shall perform injections in accordance with (IAW) the
drawings and specifications. The contractor shall follow and abide by, but
not be limited to the Unified Facility Criteria (UFC). UFC 03-270-01 (O & M
MANUAL: ASPHALT AND CONCRETE PAVEMENT MAINTENANCE AND REPAIR), dated
02/2018, authorizes High Density Polyurethane Polymer (HDPP) and deep
injection (DI) for repairs and maintenance. The work includes Deep Injection Stabilization
Update #4 ·
***NOTE as of 6/26/2020*** Due to the increase HEPCON Charlie at JBSA, we will no longer meet at the parking lot of Bldg. 4196. We will now meet directly at the site on the bridge between the ECP and bridge itself at 9:00AM. By doing this there will be no access issues as the contractors will not have to enter through an ECP - no passes required and no delays****
FA301620B0016
Amendment 01-
52.236-27 SITE VISIT , CHANGED TO READ THE FOLLOWING:
An organized site visit has been changed to reflect the following: "Tuesday 30 June 2020 at 9:00AM Central".
Participants will meet at 4196 Engineer Street, JBSA Fort Sam Houston, TX 78234. Participants will meet at the parking lot and depart to the site by 9:15AM Central."
Individuals needing base passes, will submit request NLT Friday 26 June 2020 at 1:00pm Local San Antonio time.”
This project is to repair Binz-Engleman Road at Joint Base San Antonio (JBSA), Fort Sam Houston, Texas. The objective is to lift the sunken pavement area to the proper elevation by
stabilizing road surface to improve the Binz-Engleman Road Embankment.
This is a construction requirement in accordance with FAR Part 36. This project is 100% set aside for competitive small business. The NAICS for this requirement is 237310. The
magnitude of this project is between $100,000 and $250,000.
Repair Binz-Englemen Road from Bridge to Garden Dr by bringing the failed road
portion back up to proper elevation by utilizing Deep Injection Stabilization of
Binz-Englemen Road and embankment. Work performed will be deep injection
stabilization of a two part polymer: High Density Polyurethane Polymer
(HDPP). Contractor shall perform injections in accordance with (IAW) the
drawings and specifications. The contractor shall follow and abide by, but
not be limited to the Unified Facility Criteria (UFC). UFC 03-270-01 (O & M
MANUAL: ASPHALT AND CONCRETE PAVEMENT MAINTENANCE AND REPAIR), dated
02/2018, authorizes High Density Polyurethane Polymer (HDPP) and deep
injection (DI) for repairs and maintenance. The work includes Deep Injection Stabilization
Update #3 ·
FA301620B0016
Amendment 01-
52.236-27 SITE VISIT , CHANGED TO READ THE FOLLOWING:
An organized site visit has been changed to reflect the following: "Tuesday 30 June 2020 at 9:00AM Central".
Participants will meet at 4196 Engineer Street, JBSA Fort Sam Houston, TX 78234. Participants will meet at the parking lot and depart to the site by 9:15AM Central."
Individuals needing base passes, will submit request NLT Friday 26 June 2020 at 1:00pm Local San Antonio time.”
This project is to repair Binz-Engleman Road at Joint Base San Antonio (JBSA), Fort Sam Houston, Texas. The objective is to lift the sunken pavement area to the proper elevation by
stabilizing road surface to improve the Binz-Engleman Road Embankment.
This is a construction requirement in accordance with FAR Part 36. This project is 100% set aside for competitive small business. The NAICS for this requirement is 237310. The
magnitude of this project is between $100,000 and $250,000.
Repair Binz-Englemen Road from Bridge to Garden Dr by bringing the failed road
portion back up to proper elevation by utilizing Deep Injection Stabilization of
Binz-Englemen Road and embankment. Work performed will be deep injection
stabilization of a two part polymer: High Density Polyurethane Polymer
(HDPP). Contractor shall perform injections in accordance with (IAW) the
drawings and specifications. The contractor shall follow and abide by, but
not be limited to the Unified Facility Criteria (UFC). UFC 03-270-01 (O & M
MANUAL: ASPHALT AND CONCRETE PAVEMENT MAINTENANCE AND REPAIR), dated
02/2018, authorizes High Density Polyurethane Polymer (HDPP) and deep
injection (DI) for repairs and maintenance. The work includes Deep Injection Stabilization
Update #2 ·
FA301620B0016
This project is to repair Binz-Engleman Road at Joint Base San Antonio (JBSA), Fort Sam Houston, Texas. The objective is to lift the sunken pavement area to the proper elevation by
stabilizing road surface to improve the Binz-Engleman Road Embankment.
This is a construction requirement in accordance with FAR Part 36. This project is 100% set aside for competitive small business. The NAICS for this requirement is 237310. The
magnitude of this project is between $100,000 and $250,000.
Repair Binz-Englemen Road from Bridge to Garden Dr by bringing the failed road
portion back up to proper elevation by utilizing Deep Injection Stabilization of
Binz-Englemen Road and embankment. Work performed will be deep injection
stabilization of a two part polymer: High Density Polyurethane Polymer
(HDPP). Contractor shall perform injections in accordance with (IAW) the
drawings and specifications. The contractor shall follow and abide by, but
not be limited to the Unified Facility Criteria (UFC). UFC 03-270-01 (O & M
MANUAL: ASPHALT AND CONCRETE PAVEMENT MAINTENANCE AND REPAIR), dated
02/2018, authorizes High Density Polyurethane Polymer (HDPP) and deep
injection (DI) for repairs and maintenance. The work includes Deep Injection Stabilization
Update #1 ·
This project is to repair Binz-Engleman Road at Joint Base San Antonio (JBSA), Fort Sam Houston, Texas. The objective is to lift the sunken pavement area to the proper elevation by
stabilizing road surface to improve the Binz-Engleman Road Embankment.
This is a construction requirement in accordance with FAR Part 36. This project is 100% set aside for competitive small business. The NAICS for this requirement is 237310. The
magnitude of this project is between $100,000 and $250,000.
Repair Binz-Englemen Road from Bridge to Garden Dr by bringing the failed road
portion back up to proper elevation by utilizing Deep Injection Stabilization of
Binz-Englemen Road and embankment. Work performed will be deep injection
stabilization of a two part polymer: High Density Polyurethane Polymer
(HDPP). Contractor shall perform injections in accordance with (IAW) the
drawings and specifications. The contractor shall follow and abide by, but
not be limited to the Unified Facility Criteria (UFC). UFC 03-270-01 (O & M
MANUAL: ASPHALT AND CONCRETE PAVEMENT MAINTENANCE AND REPAIR), dated
02/2018, authorizes High Density Polyurethane Polymer (HDPP) and deep
injection (DI) for repairs and maintenance. The work includes Deep Injection Stabilization
Files
Show all 19
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity