RECOVERY: Flow Meters and Chlorinators Installation

Awarded Award Notice Posted

Solicitation number
AG-9702-S-10-0413
Agency
Operations Center Southwest Economic Recovery Operations, Department of Agriculture
Awarded
to Michael Hobbs
Set-aside
No set-aside

Opportunity facts

Contract number
AG-9702-C-10-0303 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
Sierra National Forest 1600 Tollhouse Road Clovis, California 93611, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Sep 08, 2010 3:53 pm Contract Awarded September 2, 2010.

Update #2 ·

Added: May 26, 2010 1:04 pm Modified: Jun 29, 2010 4:25 pmTrack Changes RECOVERY: This project is funded by the American Recovery and Reinvestment Act of 2009 (ARRA) and is subject tot he requirements of the act. The project consists of installing 29 new flow meters and installing 10 new chlorinators throughout the Sierra National Forest. Work consists of, but is not limited to, electrical wiring, plumbing, concrete slab construction (if applicable), well house building construction (if applicable), disinfecting of water distribution, and any miscellaneous work involved with this project. The work includes all labor, materials, equipment and services requried for the contract completition. Specifications, maps and drawings will be available on www.fbo.gov on or around June 9, 2010. This project is located on the Sierra National Forest. Project sites are located at Forest Service campground and work sites. Estimated date to start work is June 2010. Completion of work, August 2010. The government estimate is between $100,000.00 and $500,000.00 No pre-bid meeting will be scheduled. Bidders may request information and directions to the site by contacting Ed Dietz at (559) 297-0706, ext. 4871 at the Supervisor's Office, Sierra National Forest, 1600 Tollhouse Road, Clovis, CA 93611, between the hours of 7 am and 4 pm, Monday through Friday (except legal holidays).

NOTE:  The closing date has been extended to July 29, 2010.

Update #1 ·

Added: May 26, 2010 1:04 pm RECOVERY: This project is funded by the American Recovery and Reinvestment Act of 2009 (ARRA) and is subject tot he requirements of the act.



The project consists of installing 29 new flow meters and installing 10 new chlorinators throughout the Sierra National Forest. Work consists of, but is not limited to, electrical wiring, plumbing, concrete slab construction (if applicable), well house building construction (if applicable), disinfecting of water distribution, and any miscellaneous work involved with this project. The work includes all labor, materials, equipment and services requried for the contract completition. Specifications, maps and drawings will be available on www.fbo.gov on or around June 9, 2010.



This project is located on the Sierra National Forest. Project sites are located at Forest Service campground and work sites.



Estimated date to start work is June 2010. Completion of work, August 2010.



The government estimate is between $100,000.00 and $500,000.00



No pre-bid meeting will be scheduled. Bidders may request information and directions to the site by contacting Ed Dietz at (559) 297-0706, ext. 4871 at the Supervisor's Office, Sierra National Forest, 1600 Tollhouse Road, Clovis, CA 93611, between the hours of 7 am and 4 pm, Monday through Friday (except legal holidays).



Attachments

Files attached to this notice, newest first
File Type Posted
Directions to Sites on the Flow Meter Chlorinator Project.pdf PDF
Corrected Amendment 1.pdf PDF
Amendment 1.pdf PDF
SF-25 A Paymen Bond.pdf PDF
PAL Fire Plan.pdf PDF
Specifications.pdf PDF
Solicitation.pdf PDF
Maps and Drawings.pdf PDF
Wage Determination.pdf PDF