Maps and Drawings.pdf
PDF 1 MB Posted
- Attached to
- RECOVERY: Flow Meters and Chlorinators Installation Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0413
About this file
Attachment 3 Maps and Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Directions to Sites on the Flow Meter Chlorinator Project.pdf | ||
| Corrected Amendment 1.pdf | ||
| Amendment 1.pdf | ||
| Solicitation.pdf | ||
| Wage Determination.pdf | ||
| PAL Fire Plan.pdf | ||
| Specifications.pdf | ||
| SF-25 A Paymen Bond.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRESNO CO.
FRESNO CO.
MADERA & MARIPOSA CO.
Cut the existing water riser run same existing pipe horizontal to allow diameters ahead behind new water meter. (Straight run) reconect pipe to riser provide bypass with full port ball valve for future maintenance.
Stenner Fixed Output Metering Pump
Solution Tank
Spill Recovery TubeShut-Off
Valve
Point of Injection
Pump Head
Grounded Power Outlet
Shut-Off Valve
Injection Fitting
Injection Check Valve
Duckbill Injection Check Valve
Discharge Valve
OUT
(Discharge)
IN (Suction)
Solution Tank
Suction Line
Weighted Suction Line Strainer
Spill Recovery Tube
Water Main
Flow