Maps and Drawings.pdf

PDF 1 MB Posted

Attached to
RECOVERY: Flow Meters and Chlorinators Installation Federal contract opportunity
Solicitation number
AG-9702-S-10-0413
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Attachment 3 Maps and Drawings

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Flow Meters and Chlorinators Installation, newest first.
File Type Posted
Directions to Sites on the Flow Meter Chlorinator Project.pdf PDF
Corrected Amendment 1.pdf PDF
Amendment 1.pdf PDF
Solicitation.pdf PDF
Wage Determination.pdf PDF
PAL Fire Plan.pdf PDF
Specifications.pdf PDF
SF-25 A Paymen Bond.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FRESNO CO.

FRESNO CO.

MADERA & MARIPOSA CO.

Cut the existing water riser run same existing pipe horizontal to allow diameters ahead behind new water meter. (Straight run) reconect pipe to riser provide bypass with full port ball valve for future maintenance.

Stenner Fixed Output Metering Pump

Solution Tank

Spill Recovery TubeShut-Off

Valve

Point of Injection

Pump Head

Grounded Power Outlet

Shut-Off Valve

Injection Fitting

Injection Check Valve

Duckbill Injection Check Valve

Discharge Valve

OUT

(Discharge)

IN (Suction)

Solution Tank

Suction Line

Weighted Suction Line Strainer

Spill Recovery Tube

Water Main

Flow