Recovery act - modification of existing contract

Award Notice Posted

Solicitation number
GS-02P-07-DTC-0017(N)
Agency
Awarded
to Nicholson & Galloway Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
GS02P07DTC0017 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

10 versions

Update #10 · Latest ·

Added: Aug 30, 2011 5:02 pm RECOVERY ACT MODIFICATION: Modification PS33 to contract GS02P07DTC0017(n) has been issue to the contractor to replace terra cotta ashlar units and one course of decorative blocks on the 1933 building located at the 2nd floor. The contractor shall also replace 40 isolated unilted located on the 2nd floor along Adams Street in Broolyn, NY. This work includes demolition, removal, replacement, cleaning and paiting of stetel and restore the brick back-up as required. Al demolition work is to be performed at night time during non-work hours.

Update #9 ·

Added: Sep 15, 2010 12:14 pm RECOVERY ACT: The existing contract GS02P07DTC0017 has been modified to include Granite Dormer Repairs on the 1892 Building in Brooklyn, NY. The previous condition of the dormers was unknown, upon further infvestigation it was discovered that the granite was displaced and damaged.

Update #8 ·

Added: Jun 22, 2010 10:24 am RECOVERY ACT MOD: Modification PS06 to contract GS02P07DTC0017(N) is for the contractor to perform investigative probes on the US Post Office and Courthouse in Brooklyn, NY. The probes will be performed at a number of locations including the Tower and Dormers, Fourth Floor Bay, Twer Balcony, and the Wall Cavity.

Update #7 ·

Added: Mar 31, 2010 10:30 am RECOVERY ACT: The existing contract GS02P07DTC0017 has been modified to include replacing the existing terra cotta ashlars at the piers on the GPO and Bankruptcy Court in Brooklyn, NY. The work is being done due to existing verticle cracks which run from the 3rd floor to the 7th floor. This work will provide a long term solution and will prevent further cracking.

Update #6 ·

Added: Mar 29, 2010 1:40 pm RECOVERY ACT. The existing contract (GS02P07DTC0017) has been modified to include the following work.

All security camera's must be adjusted throughout the project so that the USMS has a clear view of the building. The cameras are to be adjusted due to the scaffold blocking the current view.

Update #5 ·

Added: Feb 04, 2010 11:51 am RECOVERY ACT: Contract GS02P07DTC0017 has been modified to furnish all equipment, labor and materials to perform the following:



1.) Cutting a hole hole through the existing roof

2.) Hoisting a beam up to the attic

3.) Installation of the beam

4.) Masonry Patching

5.) Patching the roof and associated protection and clean up as required.

Update #4 ·

Added: Jul 27, 2009 11:18 am This project has been awarded to Nicholson and Galloway Inc. The project is for the Facade and Slate Roof Replacement at the U.S. Post Office and Courthouse 271 Cadman Plaza East, Brooklyn, NY in the amount of $53,000,000.00. The period of performance for this project will be 42 months from the date of Notice to Proceed (NTP) which is scheduled to be issued August 10, 2009.

Update #3 ·

Added: March 29, 2007 Modified: April 17, 2007Track Changes The Request for Proposal will be issued on fedbizopps on April 17, 2007.

A Pre-Proposal Conference/Small Business Subcontractor Network Session for this procurement will be held on May 2, 2007, at 10:00 am Local Time in Courtroom # 3577 (third floor) at the U.S. Post Office and Courthouse, 271 Cadman Plaza East, Brooklyn, NY 11201. Please enter the Bankruptcy Court entrance to the building and not the U.S. Post Office entrance. The Conference should afford those small businesses in attendance an opportunity to network with other companies and/or firms. GSA will conduct a site visit walk around the building after the conference is concluded. Please notify Mr.Frank Cashman via email at francis.cashman@gsa.gov if you plan on attending the conference.



Unless an amendment to the RFP is issued, the closing date for receipt of proposals is 3pm Local Time on May 16, 2007. Please see the RFP for additional information.

Update #2 ·

Added: March 29, 2007 Modified: April 5, 2007Track Changes The General Services Administration (GSA), Northeast and Caribbean Region is pleased to announce an opportunity for Construction Excellence for the Faade Repair and Slate Roof Replacement of the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY. GSA is seeking a Construction/General Contractor to perform both PreConstruction and Construction Services for this project.

The U.S. Post Office and Courthouse is an historic structure located in the Civic Center of the Borough of Brooklyn, New York. It is listed on the National Register of Historic Places and is a New York City Landmark. The 575,000 gross square foot building occupies an entire city block, fronting on Cadman Plaza, a major public space around which many federal, state and municipal buildings are organized. The building houses the U.S. Bankruptcy Court, the Office of the U.S. Trustee, the U.S. Attorney and the U.S. Postal Service. Originally constructed as a Post Office and Courthouse in 1892, the building was enlarged in 1933. The earlier, four-story (plus attic) structure that occupies the southern end of the site was designed by Mifflin Bell, then Supervising Architect of the Treasury, and is Romanesque Revival in style. The exterior facades are built of granite-faced masonry bearing walls, embellished with carved ornament, dormers and turrets. The eight-story 1933 addition that occupies the balance of the site was undertaken under the direction of James Wetmore, Acting Supervising Architect of the Treasury. In designing the addition, great effort was made to emulate the appearance of the 1892 structure. While many architectural details are shared by both structures, the 1933 structure incorporated the use of terra cotta cladding secured directly to masonry walls with ferrous anchors, in lieu of granite, above the first floor. Above this level, the use of granite was limited to the stonework surrounding the second floor windows.



This project will involve the replacement of nearly all the deteriorated terra cotta cladding on the facades of the 1933 structure with new terra cotta or approved alternate materials, restoration of all existing granite cladding on both buildings, and replacement of the entire slate mansard roofing system on both structures. The entire complex will remain fully occupied throughout the construction period. The design will follow the Secretary of Interiors Standards for Rehabilitating Historic Buildings and Historic Building Preservation Plan (HBPP) guidance, respecting the historic character of the building while accomplishing the project requirements to correct the deficiencies in the exterior envelope of the building and to preclude further faade deterioration and damage to the structure and the recently renovated historic interior.



Through the Construction Excellence program, GSA will employ the best practices that will result in the best project for the best value; procure the highest quality construction services as early as practical; and establish reliable budgets and the ability to manage them.



The scope of services for this project will include providing design phase consultations evaluating costs, schedule, alternative design implications, building systems, construction materials and constructability. Optional services will include construction of the project.



The Scope of Work for the Construction Services Option will include, but may not necessarily be limited to, the following work items:



Replacement of nearly all of the existing deteriorated terra cotta cladding with new terra cotta or approved alternate materials and new non-ferrous supports and anchorage devices on the facades, dormers and light well of the 1933 structure.

Retention, repair, restoration, re-pointing and cleaning of existing terra cotta at window surrounds on the facades, dormers and light well of the 1933 structure wherever possible.

Repair, restoration, cleaning, and re-pointing of the existing granite cladding on the facades of both the 1892 and 1933 structures.

Replacement of the entire slate roofing system on both structures, including the tower on the 1892 building, to match the appearance and character of the existing slate roof, including associated wood decking and lead coated copper gutters, gutter boxes, flashing, valleys and ridges.

Installation of an access and fall protection/prevention system in compliance with all applicable OSHA regulations at the slate mansard roof on both structures to facilitate periodic maintenance of perimeter gutters and drains.

Hazardous materials investigation and abatement associated with the above work items.



The Overall Estimated Construction Cost Range for this project is $45,000,000 to $55,000,000.



The procurement process will be performed in two (2) stages. The acquisition strategy for this project will be in accordance with Source Selection Processes and Techniques (FAR Part 15.1). This will be a competitive acquisition, utilizing the tradeoff process approach under the Best Value Continuum (FAR 15.101). This process permits tradeoffs among cost or price and technical factors and allows the government to accept other than the lowest priced proposal. For this acquisition all technical evaluation factors, when combined, are approximately equal to cost or price.



For Stage 1, offerors must submit a technical proposal responding to the following technical evaluation factors: 1) Experience on Similar Projects, 2) Past Performance on Similar Projects and 3) Qualifications of Key Personnel. The factors will be described in the solicitation. The Source Selection Evaluation Board will evaluate the technical proposals received against the factors identified for Stage I. Based on the evaluation of each proposal, a competitive range will be established in accordance with FAR 15.306(c)(1). Then, in accordance with FAR 15.306(c)(2), based on the results of the evaluation, the Contracting Officer will limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated offerors. For this procurement, the competition will be limited to the three (3) most highly rated offerors.



The three most highly rated offerors found to be within the competitive range will EACH be issued a stipend in the amount of $120,000 and will proceed into Stage 2 of the procurement process. The stipend will be paid to each offeror for their total effort related to the services rendered during Stage 2.



Those firms found to be within the competitive range will assist the GSA with the A-Es Design by performing the review and evaluation of the design and construction documents. The offerors will be required to work with GSA in a cooperative team effort to develop a quality design which is within budget. Each offeror will be required to notify GSA of all issues regarding design submissions that appear inadequate and which may have the potential to jeopardize the projects goals relating to schedule, cost, quality or scope.



The Stage 2 submission will include a Technical and Price proposal. The Stage 2 technical proposal will include the following technical evaluation factors: 4) Design and Constructability Review and Oral Presentations; 5) Management Plan and Oral Presentations.



At the conclusion of the design review services, the participating offerors will propose a Firm Fixed Price for the construction services option required under this acquisition. Award of the required construction services option will be based on the evaluation of the offerors proposed Firm Fixed Price and a comparative assessment of the offerors technical proposals against the source selection evaluation criteria identified within the solicitation. Factors 4 and 5 are equal in importance to Factors 1 and 2, which are more important than Factor 3. All the technical evaluation factors, when combined, are approximately equal to cost or price.



The offerors firm fixed price proposals for the Construction Services Option will not be assigned a numerical weight, point score or adjectival rating. GSA will use price analysis to evaluate the price proposal, not only to determine whether it is fair and reasonable, but also to determine the offerors understanding of the work and their ability to perform the requirements stipulated within this acquisition. Although the Government anticipates awarding the Construction Services Option without discussions, if discussions are conducted the competitive range will include all three offerors from Stage I, unless the range is further reduced for purposes of efficiency. .



Stage 1 submissions (technical proposals) will be due by 1:30pm, May 16, 2007. The RFP will include all the submission requirements. This procurement is being issued under the Small Business Competitive Demonstration Program, and will be open to both large and small business concerns. Before award of the contract, the firm (if not a small business of $28,500,000 gross average sales/receipts for the past three years) shall be required to present an acceptable Small Business Subcontracting Plan in accordance with Public Law 95-507.



As part of its commitment to socioeconomic initiatives of the Federal Government, GSA will establish subcontracting goals for Small Business, Small Disadvantaged Business, Women-Owned Small Business, Hubzone Small Business and Service Disabled Veteran-Owned Small Business concerns. In support of the agencys effort, firms seeking consideration for this contract shall demonstrate a proactive effort in achieving these goals, and will place subcontracts to the maximum practical extent with the small business categories listed above. GSA anticipates hosting a Subcontracting Opportunities Networking session for this project. The Networking session is intended to affirm GSAs recognition of the talent that exists in the small business community and its commitment to opening a dialogue between the community and the firms which are considering submitting proposals on this project.



The contract award or GSA exercise of any option is contingent upon the availability of funds.



The Request for Proposal (RFP) will be issued on or about April 17, 2007. GSA will be holding a PreProposal conference for the Stage 1 submissions. The date and time for this conference will be issued under a separate announcement. If you are interested in submitting a proposal for this project, please contact Frank Cashman via email at francis.cashman@gsa.gov or call (212) 264-4234.

Update #1 ·

Added: March 29, 2007 This Presolicitation Notice is issued for the procurement of a highly qualified construction contractor to perform all the services related to the Faade Repair and Slate Roof Replacement of the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY. The selected construction contractor will be required to supply all labor, materials and supervision to perform the complete services as will be required by the resultant contract.

The Estimated Construction Cost Ranges from $45,000,000 to $55,000,000.



The U.S. Post Office and Courthouse is an historic structure located in the Civic Center of the Borough of Brooklyn, New York. It is listed on the National Register of Historic Places and is a New York City Landmark. The 575,000 gross square foot building occupies an entire city block, fronting on Cadman Plaza, a major public space around which many federal, state and municipal buildings are organized. The building houses the U.S. Bankruptcy Court, the Office of the U.S. Trustee, the U.S. Attorney and the U.S. Postal Service. Originally constructed as a Post Office and Courthouse in 1892, the building was enlarged in 1933. The earlier, four-story (plus attic) structure that occupies the southern end of the site was designed by Mifflin Bell, then Supervising Architect of the Treasury, and is Romanesque Revival in style. The exterior facades are built of granite-faced masonry bearing walls, embellished with carved ornament, dormers and turrets. The eight-story 1933 addition that occupies the balance of the site was undertaken under the direction of James Wetmore, Acting Supervising Architect of the Treasury. In designing the addition, great effort was made to emulate the appearance of the 1892 structure. While many architectural details are shared by both structures, the 1933 structure incorporated the use of terra cotta cladding secured directly to masonry walls with ferrous anchors, in lieu of granite, above the first floor. Above this level, the use of granite was limited to the stonework surrounding the second floor windows.



This project will involve the replacement of nearly all the deteriorated terra cotta cladding on the facades of the 1933 structure with new terra cotta or approved alternate materials, restoration of all existing granite cladding on both buildings, and replacement of the entire slate mansard roofing system on both structures. The entire complex will remain fully occupied throughout the construction period. The design will follow the Secretary of Interiors Standards for Rehabilitating Historic Buildings and Historic Building Preservation Plan (HBPP) guidance, respecting the historic character of the building while accomplishing the project requirements to correct the deficiencies in the exterior envelope of the building and to preclude further faade deterioration and damage to the structure and the recently renovated historic interior.



The Scope of Work will include, but may not necessarily be limited to, the following work items:



Replacement of nearly all of the existing deteriorated terra cotta cladding with new terra cotta or approved alternate materials and new non-ferrous supports and anchorage devices on the facades, dormers and light well of the 1933 structure.

Retention, repair, restoration, re-pointing and cleaning of existing terra cotta at window surrounds on the facades, dormers and light well of the 1933 structure wherever possible.

Repair, restoration, cleaning, and re-pointing of the existing granite cladding on the facades of both the 1892 and 1933 structures.

Replacement of the entire slate roofing system on both structures, including the tower on the 1892 building, to match the appearance and character of the existing slate roof, including associated wood decking and lead coated copper gutters, gutter boxes, flashing, valleys and ridges.

Installation of an access and fall protection/prevention system in compliance with all applicable OSHA regulations at the slate mansard roof on both structures to facilitate periodic maintenance of perimeter gutters and drains.

Hazardous materials investigation and abatement associated with the above work items.



The Government will solicit proposals under a source selection process for Construction Contractors. Selection will be based on a combination of technical and price factors that provide the best value to the Government. The Government will select up to three (3) Construction Contractors to provide pre-construction services. The Construction Contractors will provide design phase consultations evaluating costs, schedule, alternative design implications, building systems, construction materials and constructability. At the conclusion of the Bid Phase, one (1) of the Construction Contractors will be selected to provide construction services. The selected Construction Contractor will serve as the General Contractor during construction, contracting directly with subcontractors. Award of this contract will be contingent upon availability of funds.



Additional information for this procurement will be provided in a synopsis of FedBizOpps.

Files

File Type Posted
Amendment 2.pdf PDF
Amendment 1.pdf PDF
GS02P07DTC0017N.doc DOC document