Quidazoic Strewardship

Awarded Award Notice Posted

Solicitation number
AG-9JGP-S-16-4002
Agency
Region 5 - Pacific Southwest Region Forest Service, Department of Agriculture
Awarded
to J.w. Bamford, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG-9JGP-C-16-4002 Federal contract award
NAICS code
115310 Support Activities for Forestry
PSC
Not on record
Place of performance
King Fire perimeter, see legal description above. Placerville, California 95667, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Aug 31, 2016 5:24 pm Awarded Items 1-4

Update #2 ·

Added: Jun 13, 2016 2:25 pm Modified: Jun 29, 2016 7:27 pmTrack Changes Quidizoic Stewardship

***Site Visit scheduled for July 15, 2016 at 9 AM, meet at Pacific Ranger District Office***

The Eldorado National Forest is seeking interested contractors for an Integrated Resource Stewardship Contract n accordance with Section 323 of Public Law 108-7 as revised. This project is being advertised for full and open competition.

This acquisition has been tailored to fit the Governments need for trading goods for services. The Quidazoic Fire Salvage Stewardship Project is located on the Pacific Ranger District, Eldorado National Forest.  This project is encompassed by the foot print of the King Fire which occurred in the Fall of 2014. 

Project Location – Project is located in T.11N., R.13E., Sections 1, 2, 3, 4, 5, 7, 8, 10, 11, 12, 13, 14, 15, 17, 18, 20, 21, 22 and 23; T.12N., R.13E., Sections 33, 34 and 35; T.13N., R.14E., Sections 3, 4, 5, 8, 9, 10, 17, 18, 20, 21 and 28; T.14N., R.14E., Sections 28, 32 and 33 MDB&M. The project includes mastication and biomass cutting and piling on 584 acres; biomass cutting and decking on 920 acres; road maintenance, road construction and removal of approximately 10 million board feet of timber. The timber will be scaled.

Road construction estimate is from $100,000 to $250,000. A payment bond will be required for the road construction item only. No bid or performance bonds will be required.

Use of biobased products is anticipated in the performance of this contract.

Multiple awards will be considered when in the best interest of the Government. The biomass cutting and decking, timber removal, road maintenance and road construction will all be combined in one award. 

A prebid meeting on site will be scheduled during the solicitation period. The solicitation will be avalable for review on or about June 28, 2016. 
 

Update #1 ·

Added: Jun 13, 2016 2:25 pm Quidizoic Stewardship

The Eldorado National Forest is seeking interested contractors for an Integrated Resource Stewardship Contract n accordance with Section 323 of Public Law 108-7 as revised. This project is being advertised for full and open competition.

This acquisition has been tailored to fit the Governments need for trading goods for services. The Quidazoic Fire Salvage Stewardship Project is located on the Pacific Ranger District, Eldorado National Forest.  This project is encompassed by the foot print of the King Fire which occurred in the Fall of 2014. 

Project Location – Project is located in T.11N., R.13E., Sections 1, 2, 3, 4, 5, 7, 8, 10, 11, 12, 13, 14, 15, 17, 18, 20, 21, 22 and 23; T.12N., R.13E., Sections 33, 34 and 35; T.13N., R.14E., Sections 3, 4, 5, 8, 9, 10, 17, 18, 20, 21 and 28; T.14N., R.14E., Sections 28, 32 and 33 MDB&M. The project includes mastication and biomass cutting and piling on 584 acres; biomass cutting and decking on 920 acres; road maintenance, road construction and removal of approximately 10 million board feet of timber. The timber will be scaled.

Road construction estimate is from $100,000 to $250,000. A payment bond will be required for the road construction item only. No bid or performance bonds will be required.

Use of biobased products is anticipated in the performance of this contract.

Multiple awards will be considered when in the best interest of the Government. The biomass cutting and decking, timber removal, road maintenance and road construction will all be combined in one award. 

A prebid meeting on site will be scheduled during the solicitation period. The solicitation will be avalable for review on or about June 28, 2016. 
 

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment_3_APPENDIX_A_Quidazoic.docx DOCX document
Amendment_Three_Quadizoic.docx DOCX document
Amendment_Two_Quadizoic.docx DOCX document
Amendment_Two_APPENDIX_A_Quidazoic.docx DOCX document
Amendment_One_Quadizoic.docx DOCX document
Amendment_1_Quidazoic_Contract_Map.pdf PDF
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_4.pdf PDF
Davis_Bacon_WD.docx DOCX document
Appendix_B_Scaled_Quidazoic.doc DOC document
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_3.pdf PDF
Appendix_C_Quidazoic_RoadMaint_Table.doc DOC document
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_1_REVISED.pdf PDF
Quidazoic_Contract_Map.pdf PDF
Appendix_C_QUIDAZOIC_SCHEDULE_OF_ITEMS_SERVICE_REVISED.docx DOCX document
APPENDIX_A_Quidazoic.docx DOCX document
SCA_WD_77.docx DOCX document
Appendix_D_QUIDAZOIC_SCHEDULE_OF_ITEMS_PUBLIC_WORKS_REVISED.docx DOCX document
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_2.pdf PDF
Appendix_C_Road_Maintenance_Specifications.pdf PDF
Quidazoic_IRSC_Solicitation.docx DOCX document
Appendix_D_SPECIFICATIONS_Quidazoic_Public_Works_Special_Project_Specs.pdf PDF
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_5.pdf PDF
Show all 22