APPENDIX C – ROAD MAINTENANCE REQUIREMENTS
UNITED STATES DEPARTMENT OF AGRICULTURE
Forest Service
QUIDAZOIC FIRE SALVAGE STEWARDSHIP CONTRACT
Maintenance Requirements Summary Table The following is a summary of all maintenance items required for this project. All items can be found in the Service Contract Schedule of Items for each road. The schedule of items is available to help bidders develop a specific cost for each item.
| PAY ITEM SUMMARY |
| Method of Measure |
| Unit of Measure |
| Total Units |
| Unit Price |
| Total |
(Total Units times Unit Price)
SERVICE PAY ITEMS
| 809 |
| Drainage Excavation, Type Waterbar |
| CQ |
| Each |
| 312 |
| $ |
| $ |
| 811-1 |
| Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling. |
| CQ |
| Mile |
| 44.46 |
| $ |
| $ |
| 811-2 |
| Surface Blading & Watering Only,Compaction Method A |
| CQ |
| Mile |
| 0.9 |
| $ |
| $ |
| 811-3 |
| Surface and Shoulder Maintenance,Pull Ditches, Clean CMP Inlets, and Maintain Dips. |
| CQ |
| Mile |
| 5.71 |
| $ |
| $ |
| 813-1 |
| Spot Rocking, Grading B, Compaction Method B |
| CQ |
| Ton |
| 216 |
| $ |
| $ |
| 819 |
| Placed Riprap, Class II Rock |
| CQ |
| CY |
| 6 |
| $ |
| $ |
| 842-2 |
| Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER. |
| LSQ |
| LS |
| 11 |
| $ |
| $ |
| 842-3 |
| Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs-DECK, and Stumps-SCATTER. |
| LSQ |
| LS |
| 12 |
| $ |
| $ |
| 842-4 |
| Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER. |
| LSQ |
| LS |
| 13 |
| $ |
| $ |
| 853-2 |
| Removal and Disposal of Gates |
| CQ |
| Each |
| 1 |
| $ |
| $ |
| 812 |
| Lump Sum Dust abatement for all logging activities |
| LSQ |
| Job |
| 1 |
| $ |
| $ |
Total
| Do not price here. Use Section B in solicitation |
| $ |
| Road |
| Termini |
| Applicable During Use Road Maintenance Specifications |
| From |
| To |
| Miles |
| 809 |
| 810 |
| 811 |
| 812 |
| 831 |
| 834 |
All Native or Aggregate Surface Roads
P
All Chip Seal/Paved Surface
P
P= Contractor Performance Item. D= Deposit to Forest Service. D3 = Deposit Third Party
| Road |
| Termini |
| Applicable Post Use Road Maintenance Specifications |
| From |
| To |
| Miles |
| 809 |
| 810 |
| 811 |
| 812 |
| 831 |
| 834 |
P= Contractor Performance Item. D= Deposit to Forest Service. D3 = Deposit Third Party
P = Purchaser Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party E.O.P. = End Of Project, Hwy = Highway
Note: Dust Abatement (812) will be done as needed based upon road conditions. Under the specifications for Dust Abatement, it states: “Traveled Way shall be bladed in accordance with T-811.”