Appendix_D_QUIDAZOIC_SCHEDULE_OF_ITEMS_PUBLIC_WORKS_REVISED.docx

DOCX document 62 KB Posted

Attached to
Quidazoic Strewardship Federal contract opportunity
Solicitation number
AG-9JGP-S-16-4002
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Appendix D Schedule of items

View the file

Other files for this federal contract opportunity

Other files attached to Quidazoic Strewardship, newest first.
File Type Posted
Amendment_Three_Quadizoic.docx DOCX document
Amendment_3_APPENDIX_A_Quidazoic.docx DOCX document
Amendment_Two_APPENDIX_A_Quidazoic.docx DOCX document
Amendment_Two_Quadizoic.docx DOCX document
Amendment_One_Quadizoic.docx DOCX document
Amendment_1_Quidazoic_Contract_Map.pdf PDF
Davis_Bacon_WD.docx DOCX document
Appendix_C_Road_Maintenance_Specifications.pdf PDF
Quidazoic_IRSC_Solicitation.docx DOCX document
Appendix_D_SPECIFICATIONS_Quidazoic_Public_Works_Special_Project_Specs.pdf PDF
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_5.pdf PDF
Appendix_B_Scaled_Quidazoic.doc DOC document
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_3.pdf PDF
Appendix_C_Quidazoic_RoadMaint_Table.doc DOC document
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_1_REVISED.pdf PDF
Quidazoic_Contract_Map.pdf PDF
Appendix_C_QUIDAZOIC_SCHEDULE_OF_ITEMS_SERVICE_REVISED.docx DOCX document
APPENDIX_A_Quidazoic.docx DOCX document
SCA_WD_77.docx DOCX document
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_2.pdf PDF
Appendix_D_QUIDAZOIC_DRAWINGS_DRAFT_PART_4.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 18 Quidazoic Fire Salvage Stewardship

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
VLECK CREEK SPUR
RD #
11N35A
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

TOTAL PRICE

204-5
Drainage Excavation, Type Inlet Basin
CQ
Each
1.
$ -
$ -
204-9
Drainage Excavation, Type Rocked Swale - Includes Riprap(Class II) and Screened Aggregate (Grade N).
CQ
Each
3.
$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
14.
$ -
$ -
602-2
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B. Includes De-Watering If Necessary.
CQ
LF
30.
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

This is for informational purposes by road, include pricing in the schedule of items in the solicitation.

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
TEMP ROAD
RD #
11N35AT1
LENGTH (MILES)
0.55
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

204-5
Drainage Excavation, Type Inlet Basin
CQ
Each
1.
$ -
$ -
207-1
Geotextile Fabric-CA-1 Remediation Work - Includes All Materials and Work To Complete Job.
CQ
LS
1.
$ -
$ -
299
Temporary Road Construction - Includes Clearing, Slash Disposal, Excavation, Grading and Roller Compaction.
LSQ
LS
1.
$ -
$ -
602-2
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B. Includes De-Watering If Necessary.
CQ
LF
100.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
TEMP ROAD
RD #
11N35AT2
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-9
Drainage Excavation, Type Rocked Swale - Includes Riprap(Class II) and Screened Aggregate (Grade N).
CQ
Each
4.
$ -
$ -
602-3
36-Inch Corrugated Metal Pipe, 0.064-Inch Thk FE, Method B. Includes De-Watering If Necessary.
CQ
LF
80.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
35C
RD #
11N35C
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

204-9
Drainage Excavation, Type Rocked Swale - Includes Riprap(Class II) and Screened Aggregate (Grade N).
CQ
Each
2.
$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
6.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
PEAVINE RIDGE
RD #
11N55
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

204-8
Drainage Excavation, Type Swale
CQ
Each
1.
$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
12.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD CANYON
RD #
11N56
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

204-4
Drainage Excavation, Type Catch Basin
CQ
Each
2.
$ -
$ -
602-2
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B. Includes De-Watering If Necessary.
CQ
LF
70.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
ROUNDTENT CANYON
RD #
11N57
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-4
Drainage Excavation, Type Catch Basin
CQ
Each
1.
$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
8.
$ -
$ -
602-2
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B. Includes De-Watering If Necessary.
CQ
LF
30.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SOLDIER CREEK
RD #
11N59
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
11.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD HA
RD #
11N60HA
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-9
Drainage Excavation, Type Rocked Swale - Includes Riprap(Class II) and Screened Aggregate (Grade N).
CQ
Each
1.
$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
2.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
WEST PEAVINE RIDGE
RD #
11N63
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
17.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SPRING VALLEY
RD #
11N63A
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
4.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
PEAVINE END SPUR
RD #
11N63BA
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
602-2
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B. Includes De-Watering If Necessary.
CQ
LF
40.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
NORTH ALLEN
RD #
11N63C
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
6.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
NORTH ALLEN SPUR
RD #
11N63CA
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
2.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SPRING VALLEY
RD #
11N64
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-4
Drainage Excavation, Type Catch Basin
CQ
Each
1.
$ -
$ -
204-5
Drainage Excavation, Type Inlet Basin
CQ
Each
1.
$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
6.
$ -
$ -
602-2
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B. Includes De-Watering If Necessary.
CQ
LF
90.
$ -
$ -
602-10
Remove and Replace 60-Inch Metal End Section
CQ
Each
1.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
POWERLINE RIM SPUR
RD #
11N69A
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
15.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
INDIAN HATTIES
RD #
11N76
LENGTH (MILES)
NA
DISTRICT
PACIFIC
CONST TYPE
C

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

203-3
Removal and Disposal of Culverts
CQ
Each
1.
$ -
$ -
204-8
Drainage Excavation, Type Swale
CQ
Each
1.
$ -
$ -
204-10
Drainage Excavation, Type Rolling Dip
CQ
Each
30.
$ -
$ -
602-5
60-Inch Corrugated Metal Arch Pipe, 0.064-Inch Thk FE, Method B. Includes De-Watering If Necessary.
CQ
LF
40.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

SEE SERVICE CONTRACT FOR ADDITIONAL INFO

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

SCHEDULE OF ITEMS

PUBLIC WORKS CONTRACT

ELDORADO NATIONAL FOREST

PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME

RD #

LENGTH (MILES)

DISTRICT
PACIFIC
CONST TYPE

ITEM

NO.

DESCRIPTION
METH. OF

MEASURE

UNIT

RATE

QUANT.
S.R.C

UNIT RATE

S.R.C

$ -
$ -
151
Mobilization - Applies to Project
LSQ
LS
1.
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
TOTAL
$ -

NOTES:

TOTAL ALL ROADS
$ -