Appendix_C_QUIDAZOIC_SCHEDULE_OF_ITEMS_SERVICE_REVISED.docx
DOCX document 226 KB Posted
- Attached to
- Quidazoic Strewardship Federal contract opportunity
- Solicitation number
- AG-9JGP-S-16-4002
About this file
Appendix C Schedule of Items
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
VLECK CREEK
RD #
11N35
LENGTH (MILES)
1.29
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile 1 .29
TOTAL
NOTES:
This is for informational purposes only and includes quantities for individual roads.
6/16/2016 6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
VLECK CREEK SPUR
RD #
11N35A
LENGTH (MILES)
0.78
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .78 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
TEMP ROAD
RD #
11N35AT1
LENGTH (MILES)
0.55
DISTRICT
PACIFIC
CONST TYPE
C
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 28.
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
TEMP ROAD
RD #
11 N35AT2
LENGTH (MILES)
0.29
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 16.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .29 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
VAN HOUSEN
RD #
11N35B
LENGTH (MILES)
0.14
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 2.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .1 4 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
35C
RD #
11N35C
LENGTH (MILES)
0.40
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .4 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
PEAVINE RIDGE
RD #
11N55
LENGTH (MILES)
1.09
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .51 811-2 Surface Blading & Watering Only,Compaction Method A
CQ
Mile .58 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD CANYON
RD #
11N56
LENGTH (MILES)
3.08
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile 3.08 813-1 Spot Rocking, Grading B, Compaction Method B
CQ
Ton 96.
Placed Riprap, Class II Rock
CQ
CY
6.
842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SIDE CANYON
RD #
11N56A
LENGTH (MILES)
3.30
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 53.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile 3.3 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SIDE CANYON C
RD #
11N56AC
LENGTH (MILES)
0.19
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 3.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .1 9 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SIDE CANYON D
RD #
11 N56AD
LENGTH (MILES)
0.53
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 11.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .53 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
ROUNDTENT CANYON
RD #
11N57
LENGTH (MILES)
4.65
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .36 81 1 -3 Surface and Shoulder Maintenance,Pull Ditches, Clean CMP Inlets, and Maintain Dips.
CQ
Mile 4.29 813-1 Spot Rocking, Grading B, Compaction Method B
CQ
Ton 48.
842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SOLDIER CREEK
RD #
11N59
LENGTH (MILES)
2.06
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .64 81 1 -3 Surface and Shoulder Maintenance,Pull Ditches, Clean CMP Inlets, and Maintain Dips.
CQ
Mile 1.42 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
ROBBS NORTH
RD #
11N59A
LENGTH (MILES)
0.40
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
811-1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .4
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
| PROJECT |
| QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT |
| ROAD NAME |
| JAYBIRD NORTH |
| RD # |
| 11N60B |
| LENGTH (MILES) |
| 1.07 |
| DISTRICT |
| PACIFIC |
| CONST TYPE |
| R |
ITEM
NO.
| DESCRIPTION |
| METH. OF |
MEASURE
UNIT
RATE
| QUANT. |
| S.R.C |
UNIT RATE
S.R.C
TOTAL PRICE
| 809 |
| Drainage Excavation, Type Waterbar |
| CQ |
| Each |
| 1. |
| $ - |
| $ - |
| 811-1 |
| Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling. |
| CQ |
| Mile |
| 1.07 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| TOTAL |
| $ - |
NOTES:
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
| PROJECT |
| QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT |
| ROAD NAME |
| JAYBIRD NORTH 1 |
| RD # |
| 11N60BA |
| LENGTH (MILES) |
| 0.16 |
| DISTRICT |
| PACIFIC |
| CONST TYPE |
| R |
ITEM
NO.
| DESCRIPTION |
| METH. OF |
MEASURE
UNIT
RATE
| QUANT. |
| S.R.C |
UNIT RATE
S.R.C
| 809 |
| Drainage Excavation, Type Waterbar |
| CQ |
| Each |
| 2. |
| $ - |
| $ - |
| 811-1 |
| Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling. |
| CQ |
| Mile |
| .16 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| TOTAL |
| $ - |
NOTES:
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD NORTH 2
RD #
11N60BC
LENGTH (MILES)
0.14
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 6.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .1 4 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016 6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAY GEE
RD #
11N60G
LENGTH (MILES)
0.65
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 25.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .65 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAY GEE B
RD #
11N60GB
LENGTH (MILES)
0.36
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 11.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .36 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAY GEEE C
RD #
11N60GC
LENGTH (MILES)
0.17
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 10.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .1 7 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD H
RD #
11N60H
LENGTH (MILES)
0.35
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 7.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .35 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD HA
RD #
11 N60HA
LENGTH (MILES)
0.58
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 15.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .58 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
WEST PEAVINE RIDGE
RD #
11N63
LENGTH (MILES)
9.90
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile 9.9 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SPRING VALLEY
RD #
11N63A
LENGTH (MILES)
0.73
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .73 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
PEAVINE END
RD #
11N63B
LENGTH (MILES)
0.65
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 23.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .65 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
PEAVINE END SPUR
RD #
11 N63BA
LENGTH (MILES)
0.28
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 11.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .28 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
NORTH ALLEN
RD #
11N63C
LENGTH (MILES)
0.69
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
811-1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .69
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
NORTH ALLEN SPUR
RD #
11 N63CA
LENGTH (MILES)
0.20
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 3.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .2 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SILVER PEA
RD #
11N63F
LENGTH (MILES)
0.34
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 10.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .34 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
TIE ROD
RD #
11N63H
LENGTH (MILES)
0.86
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 23.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .86 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SPRING VALLEY
RD #
11N64
LENGTH (MILES)
4.81
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile 4.78 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SILVER TIP
RD #
11N64C
LENGTH (MILES)
0.58
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
811-1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .58
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
ROUND TENT SPUR
RD #
11N64E
LENGTH (MILES)
0.13
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 4.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .1 3 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
ROUND TENT WEST
RD #
11N64F
LENGTH (MILES)
0.18
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 7.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .1 8 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
| PROJECT |
| QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT |
| ROAD NAME |
| POWERLINE RIM |
| RD # |
| 11N69 |
| LENGTH (MILES) |
| 0.19 |
| DISTRICT |
| PACIFIC |
| CONST TYPE |
| R |
ITEM
NO.
| DESCRIPTION |
| METH. OF |
MEASURE
UNIT
RATE
| QUANT. |
| S.R.C |
UNIT RATE
S.R.C
| 809 |
| Drainage Excavation, Type Waterbar |
| CQ |
| Each |
| 2. |
| $ - |
| $ - |
| 811-1 |
| Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling. |
| CQ |
| Mile |
| .19 |
| $ - |
| $ - |
| 853-2 |
| Removal and Disposal of Gates |
| CQ |
| Each |
| 1. |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| TOTAL |
| $ - |
NOTES:
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
POWERLINE RIM SPUR
RD #
11N69A
LENGTH (MILES)
0.58
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .58 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016 6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
MCMANUS
RD #
11N70
LENGTH (MILES)
2.11
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile
2.1 1
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
| PROJECT |
| QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT |
| ROAD NAME |
| TELEPHONE EAST |
| RD # |
| 11N70C |
| LENGTH (MILES) |
| 1.45 |
| DISTRICT |
| PACIFIC |
| CONST TYPE |
| R |
ITEM
NO.
| DESCRIPTION |
| METH. OF |
MEASURE
UNIT
RATE
| QUANT. |
| S.R.C |
UNIT RATE
S.R.C
| 809 |
| Drainage Excavation, Type Waterbar |
| CQ |
| Each |
| 9. |
| $ - |
| $ - |
| 811-1 |
| Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling. |
| CQ |
| Mile |
| 1.45 |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| $ - |
| TOTAL |
| $ - |
NOTES:
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
TELEPHONE SPUR
RD #
11N70D
LENGTH (MILES)
0.70
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 22.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .7 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016 6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD
CANYON SPRING
RD #
11N71
LENGTH (MILES)
0.32
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
811-2 Surface Blading & Watering Only,Compaction Method A
CQ
Mile .32
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SILVER CANYON VISTA
RD #
11N71A
LENGTH (MILES)
0.16
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .16 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
SILVER CANYON EAST
RD #
11N71B
LENGTH (MILES)
0.32
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .32 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD HOOK
RD #
11N72
LENGTH (MILES)
0.40
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .4 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
BACKHAUL SPUR
RD #
11N72A
LENGTH (MILES)
0.29
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 1.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .29 842-2 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
JAYBIRD SOUTH
RD #
11N73
LENGTH (MILES)
1.35
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 1.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile 1 .35 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
INDIAN HATTIES
RD #
11N76
LENGTH (MILES)
2.01
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile 2.01 842-3 Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER.
LSQ
LS
1 .
813-1 Spot Rocking, Grading B, Compaction Method B
CQ
Ton 72.
SEE PUBLIC WORKS FOR ADDITIONAL INFO
TOTAL
NOTES:
6/16/2016
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT
QUIDAZOIC FIRE SALVAGE STEWARDSHIP PROJECT
ROAD NAME
RICE MCMANUS TIE
RD #
11NY25
LENGTH (MILES)
0.16
DISTRICT
PACIFIC
CONST TYPE
R
ITEM
NO.
DESCRIPTION
METH. OF
MEASURE
UNIT RATE
QUANT.
S.R.C
UNIT RATE
S.R.C
TOTAL PRICE
Drainage Excavation, Type Waterbar
CQ
Each 6.
81 1 -1 Surface Blading, Shaping, Roller Compaction - Incudes Dips (Maint/Reconst), Cmps(Maint), Ditch Pulling.
CQ
Mile .1 6 842-4 Clearing & Grubbing, Disposal of Tops and Limbs-CHIP OR SCATTER, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1 .
TOTAL
NOTES:
6/16/2016