P621 academic building for cyber security studies building, usna, annapolis, MD

Award Notice Posted

Solicitation number
N4008015R0155
Agency
Awarded
to Turner Construction Company
Set-aside
No set-aside

Opportunity facts

Contract number
N40080-16-C-0156 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This project designs and constructs a multi-story academic mission facility including classrooms, teaching and research laboratories (labs), lecture halls, offices, multi-purpose space, an observatory, loading dock, and research and testing tank in support of the engineering and weapons labs. The facility also includes a Secure Compartmented Intelligence Facility (SCIF) to support labs, lecture halls, and specialized support spaces. The new facility is expected to be 206,452 SF, and constructed with steel frame on concrete pile foundation system, elevated composite concrete slab floors, low-slope membrane roof, and a facade comprised of precast concrete, masonry veneer, metal panel, and laminated glass.

The building includes a raised exterior plinth comprised of a precast concrete seawall and elevated hardscape terrace continuous with the existing adjacent terraces at Nimitz Library and Rickover Hall. Special foundation features for the academic facility include pile foundation system, structural slab at foundation, plinth waterproofing and crane base foundation. Special construction features include rooftop observatory, and rooftop railing and parapet framing. Paving and site improvements include landscaping, elevated switchgear enclosure, paving, concrete paver system at plinth terrace, asphalt paving repair, sidewalks, paving demolition, concrete stair demolition, and site light pole salvage.

AT/FP (outside) includes security systems such as intrusion detection and prevention at the academic facility due to the waterfront setting. Electrical utilities include primary and secondary distribution systems, site lighting, telecommunications and fiber-optic infrastructure, improvements to the utility tunnel and relocation of an existing electrical substation. Mechanical utilities for the academic facility include domestic and fire water lines, sanitary sewer lines, chilled water lines, and storm-water lines and cistern.

Update #1 ·

This project designs and constructs a multi-story academic mission facility including classrooms, teaching and research laboratories (labs), lecture halls, offices, multi-purpose space, an observatory, loading dock, and research and testing tank in support of the engineering and weapons labs. The facility also includes a Secure Compartmented Intelligence Facility (SCIF) to support labs, lecture halls, and specialized support spaces. The new facility is expected to be 206,452 SF, and constructed with steel frame on concrete pile foundation system, elevated composite concrete slab floors, low-slope membrane roof, and a facade comprised of precast concrete, masonry veneer, metal panel, and laminated glass.

The building includes a raised exterior plinth comprised of a precast concrete seawall and elevated hardscape terrace continuous with the existing adjacent terraces at Nimitz Library and Rickover Hall. Special foundation features for the academic facility include pile foundation system, structural slab at foundation, plinth waterproofing and crane base foundation. Special construction features include rooftop observatory, and rooftop railing and parapet framing. Paving and site improvements include landscaping, elevated switchgear enclosure, paving, concrete paver system at plinth terrace, asphalt paving repair, sidewalks, paving demolition, concrete stair demolition, and site light pole salvage.

AT/FP (outside) includes security systems such as intrusion detection and prevention at the academic facility due to the waterfront setting. Electrical utilities include primary and secondary distribution systems, site lighting, telecommunications and fiber-optic infrastructure, improvements to the utility tunnel and relocation of an existing electrical substation. Mechanical utilities for the academic facility include domestic and fire water lines, sanitary sewer lines, chilled water lines, and storm-water lines and cistern.

Files

File Type Posted
P621_Price_Schedule_24_Nov_2015.pdf PDF
P621_Amendment_0013.pdf PDF
Attachment_P621_CCSS_AMENDMENT_0011_Specs_OCTOBER_28_2015.pdf PDF
Attachment_1_3_Site_Grading_30_October_2015_Amendment.pdf PDF
P621_Amendment_0012.pdf PDF
Attachment_1_3_Site_Utility_30_October_2015_Amendment.pdf PDF
P621_Amendment_0011.pdf PDF
P621_Amendment_0010_Baseline_Inclinometer_Data_7115.pdf PDF
P621_Amendment_0010_FEDERAL_COASTAL_CONSISTENCY_DETERMINATION.pdf PDF
P621_AC_ELECTRIC_Ammendment_0010.pdf PDF
P621_Amendment_0010.pdf PDF
P621_Price_Schedule_28_AUG_2015.pdf PDF
P621_AMENDMENT_0009.pdf PDF
P621_Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Map_to_Halligan_Hall.pdf PDF
P621_Amend_0006.pdf PDF
Navy-Marine_Corps_Memorioal_Stadium-2.pdf PDF
Navy-Marine_Corps_Memorial_Stadium-1.pdf PDF
P621_Amend_0005.pdf PDF
P621_Wage_Rate.pdf PDF
P621_Price_Schedule.pdf PDF
P621_REQUEST_FOR_INFORMATION_(RFI)_FORM.doc DOC document
Amendment_0004_P621.pdf PDF
P621_Amendment_0003.pdf PDF
P621_Amendment_0002.pdf PDF
Amendment_0001_P621.pdf PDF
P621_ATTACH_C_REQUEST_FOR_INFORMATION_(RFI)_FORM.doc DOC document
P621_ATTACH_A_-_PROJECT_DATA_SHEET.doc DOC document
P621_SOLICITATION.pdf PDF
P621_RFP_ATTACH_B_-_PPQ.doc DOC document
N4008015R0155_P621_Academic_Bldg_Pre_Solicitation_Notice.pdf PDF
Show all 32

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity