MSA Lightning Protection System Repair

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA441721R0007
Agency
Air Force Special Operations Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238290 Other Building Equipment Contractors
PSC
J059 Maint/Repair/Rebuild Of Equipment- Electrical And Electronic Equipment Components
Place of performance
Hurlburt Field FL 32544 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to repair the lightning protection systems at the Munitions Storage Area at Hurlburt Field, Florida. The Department of the Air Force Special Operations Command requires the contractor to furnish all labor, materials, tools, supervision, and equipment to repair the systems in accordance with provided drawings dated November 5, 2020 and specifications CP1038321 also dated November 5, 2020. The work must be completed within 180 calendar days of receiving the notice to proceed. Proposals will be evaluated based on the offered project schedule, management qualifications, and past performance on similar projects valued between $100,000 to $500,000. All questions must be submitted in writing by February 3, 2021. Proposals are due February 16, 2021.

The set-aside designation for this opportunity is total small business. The primary NAICS code is 238990 and PSC code R499 covers other facility repair, alteration, and conversion. The place of performance is Hurlburt Field, Florida and the projected value is between $100,000 to $500,000 to be completed within 180 calendar days after receiving the notice to proceed. Interested contractors attended a pre-proposal site visit on January 27, 2021 to review the requirements.

Notice text

3 versions

Update #3 · Latest ·

The prupose of this update is to Post the Questions and Answers - 4 February 2021

The purpose of this update is to post the Pre-Proposal Site Visit Memo as well as the Sign-in Sheet - 27 January 2021

Also, contractors, please review the DoD provisions and contract clauses that have recently been updated related to Safeguarding Covered Defense Information and Cyber Incident Reporting as well as the actions required of contractors. Please see DFARS Clause(s) 252.204-7012 and 252.204-7020 and Provision 252.204-7019 all covering requirements of NIST SP 800-171. Outlined within, there is a requirement for contractors to have a self-assessment completed and filed before a contractor can be awarded a new contract or task order. Additional details are include in the latest version of the NIST SP 800-171:

 https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800-171.html

The contractor shall furnish all labor, materials, tools, supervision and equipment, and perform all operations necessary to accomplish all work, complete in place, to repair the Lightning Protection Systems at Munitions Storage Area at Hurlburt Field, FL. All work shall be done in accordance with the requirements contained in Drawings dated 5 Nov 2020 and Specifications CP1038321, dated 5 Nov 2020. The projected period of performance is 180 calendar days after issuance of Notice to Proceed (NTP).

Update #2 ·

The purpose of this update is to post the Pre-Proposal Site Visit Memo as well as the Sign-in Sheet.

Also, contractors, please review the DoD provisions and contract clauses that have recently been updated related to Safeguarding Covered Defense Information and Cyber Incident Reporting as well as the actions required of contractors. Please see DFARS Clause(s) 252.204-7012 and 252.204-7020 and Provision 252.204-7019 all covering requirements of NIST SP 800-171. Outlined within, there is a requirement for contractors to have a self-assessment completed and filed before a contractor can be awarded a new contract or task order. Additional details are include in the latest version of the NIST SP 800-171:

 https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800-171.html

The contractor shall furnish all labor, materials, tools, supervision and equipment, and perform all operations necessary to accomplish all work, complete in place, to repair the Lightning Protection Systems at Munitions Storage Area at Hurlburt Field, FL. All work shall be done in accordance with the requirements contained in Drawings dated 5 Nov 2020 and Specifications CP1038321, dated 5 Nov 2020. The projected period of performance is 180 calendar days after issuance of Notice to Proceed (NTP).

Update #1 ·

The contractor shall furnish all labor, materials, tools, supervision and equipment, and perform all operations necessary to accomplish all work, complete in place, to repair the Lightning Protection Systems at Munitions Storage Area at Hurlburt Field, FL. All work shall be done in accordance with the requirements contained in Drawings dated 5 Nov 2020 and Specifications CP1038321, dated 5 Nov 2020. The projected period of performance is 180 calendar days after issuance of Notice to Proceed (NTP).

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
MSA Lightning Protection System Repair Award Award Notice
MSA Lightning Protection System Repair This notice · Latest solicitation Solicitation
MSA Lightning Protection System Repair Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity