M284 Breech Reliability Upgrade Kits
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W56HZV19R0225
- Agency
-
ACC Warren
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 332994 Small Arms, Ordnance, and Ordnance Accessories Manufacturing
- PSC
- Not on record
- Place of performance
- RIC BA4 Army General Supply LMP Stock Recor Central receiving point 7 Frankford Ave Building 362 Anniston, Alabama 36201, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Materiel Command Contracting Command Detroit Arsenal intends to award a firm-fixed price contract to provide 200 M284 Breech Reliability Upgrade Kits for the M109 Family of Vehicles. Offerors must deliver a minimum of 100 kits no later than 60 calendar days after successful first article testing, with the remaining 100 kits due by the end of the one-year base period of performance. Proposals are due by July 29, 2019 in response to solicitation number W56HZV19R0225. Award will be made to a responsible offeror based on lowest price technically acceptable.
There is no set-aside designation. The NAICS code is 332992 and PSC code is 1485. Delivery of the 200 kits will occur over the one-year base period of performance, with at least 100 kits due within 60 days of first article testing approval and the remainder by the end of the period of performance. Place of performance is 7 Frankford Ave, Anniston, AL 36201.
Notice text
5 versions
Update #5 · Latest ·
**Closing date for receipt of proposals is 15 August 5:00pm EST..
Update #4 ·
The Government intends to issue a new contract with a Technical Data Package (TDP) to provide Breech Reliability Upgrade Kits in order to replenish the M109 family of vehicle breech kits. The breech assembly on the M109 series of artillery vehicles has not kept pace with advances in munition propellants. The Product Manager (PdM) Self-Propelled Howitzer Systems (SPHS) has implemented engineering changes to breech parts on the M284 cannon assembly (referred to as the M284 Breech Reliability Upgrade Kit) that results in a more robust firing train assembly. Many of the changed parts are not compatible with the breech legacy parts. This has necessitated the implementation of a complete fleet replacement strategy for the affected breech parts. Therefore, the Government will procure a supply stock of M284 Breech Reliability Upgrade Kits to meet demand needs of the entire fleet of the M109 Family of Vehicles (FOV).
Period of performance is 1 year (12 months). First Article Test/ Inspection is required after contract award. A total of 200 Breech Upgrade Kits are required for this procurement for delivery during the performance of the contract. Delivery of not less than 100 kits (50%) is required no later than (NLT) 60 calendar days after successful First Article Testing (FAT) by the Government after contract award and at the 12th month of the base year.
The Government intends to solicit, negotiate and award a Firm-Fixed Price Contract type to the successful Offeror. The Government will consider all proposals from interested, responsible sources that is received by the closing date of receipt of proposals.
Interested responsible sources are required to submit their responses via FedBizOpps or via email to Sophia.L.Pace.civ@mail.mil. The subject line of the email submission must read: Offer for consideration under solicitation W56HZV-19-R-0225. Access to the TDP and OPSEC package will not be released until a signed NDA and other required documents are received as instructed in the solicitation. Instructions for access to the TDP and any other items are listed within the solicitation.
The closing date for the receipt of proposals for solicitation W56HZV-19-R-0225 is 15 August 2019. The point of contact for this action is Sophia Pace, Contract Specialist, CCTA-AL, Sophia.L.Pace.civ@mail.mil.
.
Update #3 ·
*Final Solicitation Release Update:
Solicitation W56HZV-19-R-0225 is anticipated for release earliest week of the 08th or latest week of the 15th of July 2019. Access to data will not be released until all required information within the soliciation is received for data access to be granted..
Update #2 ·
*Solicitation Release Update:
Solicitation W56HZV-19-R-0225 will be released week of 01st July 2019.
.
Update #1 ·
The Government intends to issue a new contract with a Technical Data Package (TDP) to provide Breech Reliability Upgrade Kits in order to replenish the M109 family of vehicle breech kits. The breech assembly on the M109 series of artillery vehicles has not kept pace with advances in munition propellants. The Product Manager (PdM) Self-Propelled Howitzer Systems (SPHS) has implemented engineering changes to breech parts on the M284 cannon assembly (referred to as the M284 Breech Reliability Upgrade Kit) that results in a more robust firing train assembly. Many of the changed parts are not compatible with the breech legacy parts. This has necessitated the implementation of a complete fleet replacement strategy for the affected breech parts. Therefore, the Government will procure a supply stock of M284 Breech Reliability Upgrade Kits to meet demand needs of the entire fleet of the M109 Family of Vehicles (FOV).
Period of performance is 1 year (12 months). First Article Test/ Inspection is required after contract award. A total of 200 Breech Upgrade Kits are required for this procurement for delivery during the performance of the contract.
Delivery of not less than 100 kits (50%) is required no later than (NLT) 60 calendar days after successful First Article Testing (FAT) after contract award and at the 12th month of the base year.
The Government intends to solicit, negotiate and award a Firm-Fixed Price Contract type to the successful Offeror. The Government will consider all proposals from interested, responsible sources that is received by the closing date of receipt of proposals.
The estimated release date of solicitation W56HZV-19-R-0225 is, 28 June 2019 and the closing date for receipt of proposals is 29 July 2019. The point of contact for this action is Sophia Pace, Contract Specialist, CCTA-AL, Sophia.L.Pace.civ@mail.mil.
.
Files
| File | Type | Posted |
|---|---|---|
| Pricing_Sheet_-_Breech_Upgrade_Kits__official.xlsx | XLSX spreadsheet | |
| M284_Solicitation__W56HZV19R0225_12jul2019.pdf | ||
| NDA_-_breech_reliability_kit_-_20_Nov_18.docx | DOCX document | |
| NDA_-_breech_reliability_kit_-_20_Nov_18.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| M284 Breech Reliability Upgrade Kits | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Breechblock Forging (Rough Machined), per drawing number 12591138, Rev B, for 105mm M20 | ACC Warren | No set-aside | |
| Breech ring forging, per DWG #12591139 REV b, for 105MM M20 | ACC Warren | No set-aside | |
| Primer Feed Mechanisms (PFMs) | ACC Picatinny | No set-aside | |
| Cannon Containers for the Watervliet Arsenal | ACC Warren | Total Small Business | |
| Gear Rack, per Drawing # 8767202, Revision Y, for 155MM M284 Cannon, for the Watervliet Arsenal | ACC Warren | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity