Lock & Dam 2 Barge Impact Repair

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912ES24B0012
Agency
ENDIST St Paul US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z2KA Repair Or Alteration Of Dams
Place of performance
Hastings, Minnesota 55033, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, Minnesota. The work includes demolishing and removing the upper portion of the damaged guidewall monolith, realigning the foundation, and replacing approximately 180 CY of reinforced concrete, some of which is below the waterline. The contractor must engineer, furnish, and operate a dewatering system to execute the repairs in a compressed timeframe under adverse winter conditions. Construction cannot begin until after the navigation season ends, tentatively on December 9, 2024, and must be complete by early March 2025.

This procurement is 100% set-aside for Small Businesses under NAICS code 237990, Other Heavy and Civil Engineering Construction, with a $45,000,000 size standard. The estimated magnitude of construction is between $1,000,000 and $5,000,000. The location of performance is Lock and Dam No. 2 in Hastings, Minnesota. Bids are due by August 14, 2024, and the government has issued several amendments providing clarification and updates to the requirements.

Notice text

6 versions

Update #6 · Latest ·

The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.  

In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024. 

This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam). 

The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025. 

This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract. 

The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. 

This Invitation for Bid (IFB) is 100% set-aside for Small Businesses. 
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is  $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams. 

The location for this project is: 
Lock and Dam No. 2 
1350 Lock and Dam Road 
Hastings, MN 55033-1145 

The project site is located in Dakota County, Minnesota.  Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2

AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications. 

AMENDMENT 0002 has been posted 7/24/2024 - This amendment makes changes to Section 01 14 00.00 13 of the solicitation specifications. 

AMENDMENT 0003 has been posted 8/6/2024 - This amendment changes the bid opening date to Wednesday, August 14, 2024 at 1:00 PM (CDT). 

AMENDMENT 0004 has been posted 8/8/2024 - This amendment makes changes to Section 02 41 00 Subpart 3.1 of the solicitation specifications.

BID OPENING was conducted on 8/14/2024 at 1:00 PM. Bids were received from six (6) firms. An abstract of the bids has been posted. 

Update #5 ·

The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.  

In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024. 

This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam). 

The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025. 

This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract. 

The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. 

This Invitation for Bid (IFB) is 100% set-aside for Small Businesses. 
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is  $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams. 

The location for this project is: 
Lock and Dam No. 2 
1350 Lock and Dam Road 
Hastings, MN 55033-1145 

The project site is located in Dakota County, Minnesota.  Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2

AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications. 

AMENDMENT 0002 has been posted 7/24/2024 - This amendment makes changes to Section 01 14 00.00 13 of the solicitation specifications. 

AMENDMENT 0003 has been posted 8/6/2024 - This amendment changes the bid opening date to Wednesday, August 14, 2024 at 1:00 PM (CDT). 

AMENDMENT 0004 has been posted 8/8/2024 - This amendment makes changes to Section 02 41 00 Subpart 3.1 of the solicitation specifications.

Update #4 ·

The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.  

In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024. 

This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam). 

The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025. 

This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract. 

The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. 

This Invitation for Bid (IFB) is 100% set-aside for Small Businesses. 
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is  $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams. 

The location for this project is: 
Lock and Dam No. 2 
1350 Lock and Dam Road 
Hastings, MN 55033-1145 

The project site is located in Dakota County, Minnesota.  Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2

AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications. 

AMENDMENT 0002 has been posted 7/24/2024 - This amendment makes changes to Section 01 14 00.00 13 of the solicitation specifications. 

AMENDMENT 0003 has been posted 8/6/2024 - This amendment changes the bid opening date to Wednesday, August 14, 2024 at 1:00 PM (CDT). 

Update #3 ·

The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.  

In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024. 

This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam). 

The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025. 

This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract. 

The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. 

This Invitation for Bid (IFB) is 100% set-aside for Small Businesses. 
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is  $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams. 

The location for this project is: 
Lock and Dam No. 2 
1350 Lock and Dam Road 
Hastings, MN 55033-1145 

The project site is located in Dakota County, Minnesota.  Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2

AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications. 

AMENDMENT 0002 has been posted 7/24/2024 - This amendment makes changes  Section 01 14 00.00 13 of the solicitation specifications. 

Update #2 ·

The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.  

In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024. 

This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam). 

The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025. 

This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract. 

The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. 

This Invitation for Bid (IFB) is 100% set-aside for Small Businesses. 
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is  $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams. 

The location for this project is: 
Lock and Dam No. 2 
1350 Lock and Dam Road 
Hastings, MN 55033-1145 

The project site is located in Dakota County, Minnesota.  Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2

AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications. 

Update #1 ·

The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.  

In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024. 

This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam). 

The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025. 

This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract. 

The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. 

This Invitation for Bid (IFB) is 100% set-aside for Small Businesses. 
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is  $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams. 

The location for this project is: 
Lock and Dam No. 2 
1350 Lock and Dam Road 
Hastings, MN 55033-1145 

The project site is located in Dakota County, Minnesota.  Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2

Attachments

Files attached to this notice, newest first
File Type Posted
W912ES24B0012 Bid Abstract (signed).pdf PDF
W912ES24B0012-0004 Amendment 0004.pdf PDF
02 41 00 AMEND4.pdf PDF
W912ES24B0012-0003 Amendment 0003.pdf PDF
W912ES24B0012-0002 Amendment 2.pdf PDF
W912ES24B0012_Amend_2 Section 01 14 00.00 13.pdf PDF
W912ES24B0012-0001 Amendment 0001.pdf PDF
01 14 00.00 13 Amend.pdf PDF
W912ES24B0012_SPECS.pdf PDF
W912ES24B0012_PLANS.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Lock & Dam 2 Barge Impact Repair Award Award Notice
Lock & Dam 2 Barge Impact Repair This notice · Latest solicitation Solicitation
Lock & Dam 2 Guidewall Barge Impact Repair Pre-Solicitation
Lock & Dam 2 Guidewall Barge Impact Repair Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity