Lock & Dam 2 Barge Impact Repair
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912ES24B0012
- Agency
- ENDIST St Paul US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Hastings, Minnesota 55033, United States
- Points of contact
-
- John Riederer john.p.riederer@usace.army.mil (651) 290-5614
- Ken Eshom kenneth.j.eshom@usace.army.mil (651) 290-5415
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, Minnesota. The work includes demolishing and removing the upper portion of the damaged guidewall monolith, realigning the foundation, and replacing approximately 180 CY of reinforced concrete, some of which is below the waterline. The contractor must engineer, furnish, and operate a dewatering system to execute the repairs in a compressed timeframe under adverse winter conditions. Construction cannot begin until after the navigation season ends, tentatively on December 9, 2024, and must be complete by early March 2025.
This procurement is 100% set-aside for Small Businesses under NAICS code 237990, Other Heavy and Civil Engineering Construction, with a $45,000,000 size standard. The estimated magnitude of construction is between $1,000,000 and $5,000,000. The location of performance is Lock and Dam No. 2 in Hastings, Minnesota. Bids are due by August 14, 2024, and the government has issued several amendments providing clarification and updates to the requirements.
Notice text
6 versions
Update #6 · Latest ·
The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.
In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024.
This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam).
The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025.
This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract.
The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.
This Invitation for Bid (IFB) is 100% set-aside for Small Businesses.
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams.
The location for this project is:
Lock and Dam No. 2
1350 Lock and Dam Road
Hastings, MN 55033-1145
The project site is located in Dakota County, Minnesota. Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2
AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications.
AMENDMENT 0002 has been posted 7/24/2024 - This amendment makes changes to Section 01 14 00.00 13 of the solicitation specifications.
AMENDMENT 0003 has been posted 8/6/2024 - This amendment changes the bid opening date to Wednesday, August 14, 2024 at 1:00 PM (CDT).
AMENDMENT 0004 has been posted 8/8/2024 - This amendment makes changes to Section 02 41 00 Subpart 3.1 of the solicitation specifications.
BID OPENING was conducted on 8/14/2024 at 1:00 PM. Bids were received from six (6) firms. An abstract of the bids has been posted.
Update #5 ·
The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.
In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024.
This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam).
The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025.
This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract.
The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.
This Invitation for Bid (IFB) is 100% set-aside for Small Businesses.
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams.
The location for this project is:
Lock and Dam No. 2
1350 Lock and Dam Road
Hastings, MN 55033-1145
The project site is located in Dakota County, Minnesota. Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2
AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications.
AMENDMENT 0002 has been posted 7/24/2024 - This amendment makes changes to Section 01 14 00.00 13 of the solicitation specifications.
AMENDMENT 0003 has been posted 8/6/2024 - This amendment changes the bid opening date to Wednesday, August 14, 2024 at 1:00 PM (CDT).
AMENDMENT 0004 has been posted 8/8/2024 - This amendment makes changes to Section 02 41 00 Subpart 3.1 of the solicitation specifications.
Update #4 ·
The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.
In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024.
This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam).
The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025.
This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract.
The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.
This Invitation for Bid (IFB) is 100% set-aside for Small Businesses.
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams.
The location for this project is:
Lock and Dam No. 2
1350 Lock and Dam Road
Hastings, MN 55033-1145
The project site is located in Dakota County, Minnesota. Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2
AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications.
AMENDMENT 0002 has been posted 7/24/2024 - This amendment makes changes to Section 01 14 00.00 13 of the solicitation specifications.
AMENDMENT 0003 has been posted 8/6/2024 - This amendment changes the bid opening date to Wednesday, August 14, 2024 at 1:00 PM (CDT).
Update #3 ·
The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.
In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024.
This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam).
The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025.
This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract.
The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.
This Invitation for Bid (IFB) is 100% set-aside for Small Businesses.
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams.
The location for this project is:
Lock and Dam No. 2
1350 Lock and Dam Road
Hastings, MN 55033-1145
The project site is located in Dakota County, Minnesota. Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2
AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications.
AMENDMENT 0002 has been posted 7/24/2024 - This amendment makes changes Section 01 14 00.00 13 of the solicitation specifications.
Update #2 ·
The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.
In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024.
This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam).
The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025.
This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract.
The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.
This Invitation for Bid (IFB) is 100% set-aside for Small Businesses.
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams.
The location for this project is:
Lock and Dam No. 2
1350 Lock and Dam Road
Hastings, MN 55033-1145
The project site is located in Dakota County, Minnesota. Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2
AMENDMENT 0001 has been posted 7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications.
Update #1 ·
The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.
In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024.
This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam).
The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025.
This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract.
The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.
This Invitation for Bid (IFB) is 100% set-aside for Small Businesses.
The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams.
The location for this project is:
Lock and Dam No. 2
1350 Lock and Dam Road
Hastings, MN 55033-1145
The project site is located in Dakota County, Minnesota. Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2
Attachments
| File | Type | Posted |
|---|---|---|
| W912ES24B0012 Bid Abstract (signed).pdf | ||
| W912ES24B0012-0004 Amendment 0004.pdf | ||
| 02 41 00 AMEND4.pdf | ||
| W912ES24B0012-0003 Amendment 0003.pdf | ||
| W912ES24B0012-0002 Amendment 2.pdf | ||
| W912ES24B0012_Amend_2 Section 01 14 00.00 13.pdf | ||
| W912ES24B0012-0001 Amendment 0001.pdf | ||
| 01 14 00.00 13 Amend.pdf | ||
| W912ES24B0012_SPECS.pdf | ||
| W912ES24B0012_PLANS.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Lock & Dam 2 Barge Impact Repair | Award Notice | |
| Lock & Dam 2 Barge Impact Repair | Solicitation | |
| Lock & Dam 2 Guidewall Barge Impact Repair | Pre-Solicitation | |
| Lock & Dam 2 Guidewall Barge Impact Repair | Pre-Solicitation |